Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹60.6 LAccepted-AOC | ₹60.6 L | 1 | Accepted-AOC L1 |
| 2 | 2₹61.0 LRejected-AOC | ₹61.0 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/s. T.KOLANDAIVELU AND CO L1 | RAJ CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Ramp Approach from Parking Area to Temple at Vaiyappamalai Arulmigu Subramaniya Swami Thirukoil, Marapparai Village, Namakkal District. | |||||
| 2.00 | Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shabs murams and ordinary gravel and hard dravel including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead. | 46.67 | Cum | 265 ₹12,367.55 | 300 ₹14,001 |
| 3.00 | Cost for Rock Demolition, Drilling. | 77.79 | Cum | 933 ₹72,578.07 | 940 ₹73,122.60 |
| 4.00 | Supplying and filling in Foundation with M.Sand in layers of 110mm thick including watering and ramming. | 8.55 | Cum | 1,817 ₹15,535.35 | 1,900 ₹16,245 |
| 5.00 | Plain cement concrete 1:4:8 mix using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., | 8.55 | Cum | 5,462 ₹46,700.10 | 5,500 ₹47,025 |
| 6.00 | Supplying and filling in Basement with M.Sand in layers of 80mm thick including watering and ramming. | 32.04 | Cum | 1,817 ₹58,216.68 | 1,900 ₹60,876 |
| 7.00Reinforced cement concrete 1:1½:3 mix (One cement one and half sand three aggregate) using 20mm ISS gauge HBBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification. | |||||
| 8.00 | Footing-1 | 35.01 | Cum | 9,197 ₹3.2 L | 9,200 ₹3.2 L |
| 9.00 | Column upto ground Level | 1.52 | Cum | 9,197 ₹13,979.44 | 9,200 ₹13,984 |
| 10.00 | Upto Slab | 14.95 | Cum | 9,197 ₹1.4 L | 9,200 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹61,000
Closing Date
27 Feb 2026, 3:00 pmClosed
DRDA Namakkal
The Project Director
Construction of Ramp Approach from Parking Area to Temple at Vaiyappamalai Arulmigu Subramaniya Swami Thirukoil Marapparai Panchayat at Mallasamudram Block of Namakkal District under SCPAR 2025-26 pkg.No.1
2026_RDTN_664660_1
424/2026/A8
Open Tender
Civil Works
180 days
Mallasamudram
Required Documents as per Schedule
4 documents required · 4 mandatory
₹0
₹61,000
10 Mar 2026
23 Feb 2026
27 Feb 2026
23 Feb 2026
27 Feb 2026
23 Feb 2026
Construction of Ramp Approach from Parking Area to Temple at Vaiyappamalai Arulmigu Subramaniya Swami Thirukoil, Marapparai Village, Namakkal District.
Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shabs murams and ordinary gravel and hard dravel including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead.
Cost for Rock Demolition, Drilling.
Supplying and filling in Foundation with M.Sand in layers of 110mm thick including watering and ramming.
Plain cement concrete 1:4:8 mix using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,
Supplying and filling in Basement with M.Sand in layers of 80mm thick including watering and ramming.
Reinforced cement concrete 1:1½:3 mix (One cement one and half sand three aggregate) using 20mm ISS gauge HBBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification.
Footing-1
Column upto ground Level
Upto Slab
Roof Beam
Roof Slab
Steel Rods for Footing, Column, Beam & Slab including Bar Bending Work.
Footing & Column
Roof Beam
Roof Slab
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
Roof Beam
Roof Slab
Plastering for Column, Beam Using C.M 1:5 Mix Including Labour charges and Curing etc.,
White washing two coat using best shell lime.
Providing S.S Handrails For Ramp Including Labour charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_798191.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
1tech.pdf
Tender Documents • 1.46 MB
BOQ_798191.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid