Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹111.6 CrAdmitted-Finance | -10.10% | ₹111.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹117.8 Cr+₹6.2 Cr (5.53%)Admitted-Finance | -5.13% | ₹117.8 Cr+₹6.2 Cr (5.53%) | L2 | Admitted-Finance |
| 3 | L3₹123.2 Cr+₹11.6 Cr (10.4%)Admitted-Finance | -0.79% | ₹123.2 Cr+₹11.6 Cr (10.4%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical T AND C NOT FULFILL |
Tender Value
Refer Docs
EMD Value
₹1.2 Cr
Closing Date
8 Apr 2024, 5:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER, CONSTRUCTION CIRCLE, U P JAL NIGAM (URBAN), 4/4, SANJAY PLACE, AGRA
Package No. 12 A -2 (for 3 pilot zone) Performance-Based Construction and Maintenance Contract for Bodla-I, Bodla-II and Lohamandi Pilot Zones in Agra City
2024_UPJNM_913678_1
374/V-14/22 - PCM Package-12A-2
Open Tender
Water Supply
Percentage
630 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹23,600
PROJECT MANAGER, GANGAJAL PROJECT UNIT, UPJN, AGRA
₹1.2 Cr
AGRA
13 Jan 2025
7 Mar 2024
9 Apr 2024
7 Mar 2024
8 Apr 2024
7 Mar 2024
16 Mar 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Baseline Validation, Establishment of DMA and Achivement of Performance Target-Bill-I | |||||
| - | Base Line Validation for 3 Pilot Zones Bill-I: Establishment and Validation of the Baseline parameters of the zones / subzones by measuring the inflow, outflow, pressure, water consumption, water quality etc with all necessary work to facilitate the work within the scheduled period as mentioned. Refer the Technical Specification Section for a more detailed Description | 1 | Ls | 1,38,20,343.08 | ₹1,38,20,343.08 |
| - | Establishment of District Metered Area (DMA) and Preparation of Capital Investment Plan: Design and formation of the water supply Zones / DMA using the existing assets of the Water Distribution System for 3 pilot zone. It also includes the new proposal of the pipe line, valves etc. complete to establish the hydraulically discrete areas. It includes preparation of Capital Investment Plan for achievement of Performance Targets. Refer the Technical Specification Section for a more detailed Description | 1 | Ls | 69,63,495 | ₹69,63,495 |
| - | Reduction of UFW and Achievement of Performance Target: Reduce the performance parameters from the baseline levels to the Target level within the timeframe stipulated in the contract for the water supply and distribution system for 3 pilot zone. Refer the Technical Specification Section for a more detailed Description | 1 | Ls | 3,88,63,440 | ₹3,88,63,440 |
| - | Capital Works-Bill-II | - | - | - | - |
| - | Feeder main | - | - | - | - |
| - | Excavation trenches in all kind of soil with required width of pipes including dewatering if required, shoring, excavation for sockets, and dressing of sides, ramming of bottoms, up to the required depth including removing the excavated soil, and then refilling the soil as required, in layers not exceeding 15 cm in depth including consolidating each deposited layer by ramming, watering etc and disposing of surplus excavated soil as directed, as per Technical Specifications and as per direction of Engineer. The work shall be inclusive of excavation without damaging the underground utilities like electrical and telephone cables, water distribution line, sewer and storm water lines and in case of damages the same shall be replaced with free of cost. The item is also inclusive of reinstatement of damaged sewer /water house service connections during excavation. The drains, public rams and other miscellaneous structures which get damaged while excavating shall be reinstated under this Item. The work is also inclusive of dismantling of Bituminous road,Cement Concrete road, interlocking tiles road sufaces for laying of pipeline and house connection work including sorting out of serviceable material and disposal of unserviceable materials. | - | - | - | - |
| - | 0 to 1.5 m depth | - | cum | 251.06 | - |
| - | Providing and supplying ISI mark DI-k9 S&S pipes (push on joints pressure pipes of D.I of following class and diameters confirming to the I.S. specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality) including all statutary duties and taxes , Third party inspection charges, including Transit insurance, Railway Freight, Unloading from railway wagon, Loading into Truck, Transportation to departmental store / site of work, unloading, stacking etc. completed as directed by Engineer –in-charge (IS 1536 / 2001 for pipes and IS 158 / 1969 and IS 12820 / 1989 or latest edition / revision with amendments for Rubber Gaskets. | - | - | - | - |
| - | 200 mm | - | m | 1,892 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_1578280.xls
BOQ Document • 0.87 MB
141479059.pdf
Tender Document • 1.65 MB
Vol-1PCM3Zones.pdf
Tender Document • 1.37 MB
Vol-2PCM3Zones.pdf
Tender Document • 5.34 MB
Vol-3PCM3Zones.pdf
Tender Document • 1.49 MB
Vol-4PCM3Zones.pdf
Tender Document • 20.02 MB
Vol-5PCMZones.pdf
Tender Document • 0.44 MB
141479073.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .