Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹3,050.11 (1.66%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.9 L+₹8,405.80 (4.58%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.2 L+₹32,302.27 (17.6%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
19 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
FAYAZ AHMED SHEIKH
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_331012_11
NIT NO 84 OF REW RAMBAN 2026 27 UNDER HEAD PRI,DDC,SBM,CDF
Open Tender
Civil Works
Percentage
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹4,800
20 Nov 2026
12 Nov 2026
20 Nov 2026
12 Nov 2026
19 Nov 2026
12 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforcement cement concrete work in walls any thickness including suspended floors attached pillars excluding the cost of centering and shuttering finishing and reinforcement 1:1.5:3 mix | 8.03 | cum | 9,395.7 | ₹75,447.47 |
| 2 | Steel reinforcement for RCC work with TMT bars | 715.2 | kg | 123.2 | ₹88,112.64 |
| 3 | cenering and shuttering and proping etc suspended floors roof landings and balconies and access balconies | 26.4 | sqm | 718.2 | ₹18,960.48 |
| 4 | cenering and shuttering and proping etc edges of slab | 22 | rmt | 262.3 | ₹5,770.6 |
| 5 | supply at site angles iron post and struts of required size | 132.57 | kg | 138.8 | ₹18,400.72 |
| 6 | Finishing with epoxy paint at all locations prepared and applied as per manufacturers specification including appropriate coat preparation of surface ,etc complete on concrete work | 22 | sqm | 199.1 | ₹4,380.2 |
| 7 | Finishing with epoxy paint at all locations prepared and applied as per manufacturers specification including appropriate coat preparation of surface ,etc complete on concrete work | 52.8 | sqm | 197.8 | ₹10,443.84 |
| 8 | Carriage of Cement. | 3.21 | MT | 517.66 | ₹1,661.69 |
| 9 | Carriage of sand. | 3.77 | Cum | 2,130.6 | ₹8,032.36 |
| 10 | Cassriage of C.Aggregate. | 7.14 | Cum | 1,114.22 | ₹7,955.53 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
BOQ_1123583.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .