| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.3 LAdmitted-Finance | -0.10% | ₹12.3 L | L1 | Admitted-Finance |
| 2 | L2₹12.5 L+₹13,592.02 (1.10%)Admitted-Finance | +1.00% | ₹12.5 L+₹13,592.02 (1.10%) | L2 | Admitted-Finance |
| 3 | L3₹12.6 L+₹25,948.40 (2.10%)Admitted-Finance | +2.00% | ₹12.6 L+₹25,948.40 (2.10%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical more than 4 work in hand |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical more than 4 work in hand |
Tender Value
₹12.4 L
EMD Value
₹12,356
Closing Date
14 Aug 2026, 6:00 pmClosed
Add.Chief Executive Officer Z.P.Pune WellaslayRd.C
Z.P.Pune WellaslayRd.Camp pune 01
32. Improvement of Khandagalewasti to Lankewasti road at Loni Tal Ambegaon
2026_RDPUN_1325953_32
ZPPune/North/e-Tender/7/26-27
Open Tender
Civil Works - Roads
Percentage
100 days
Z.P.Pune WellaslayRd.Camp pune 01
As per Tender Notice
10 documents required · 10 mandatory
₹590
₹12,356
Yes
28 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 900 | Square Metre | 12 | ₹10,800 |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 162 | Cubic Metre | 119 | ₹19,278 |
| 3 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diaMetre in proper line, level and slope including providing and fixing collars in cement mortar 1:2
and curing etc. complete. | 5 | Running Metre | 2,789.28 | ₹13,946.4 |
| 4 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of bitumen 0f specified grade at the rate of 0.30 Kg Sqm.(on existing bitumen surface.) | 1,020 | Square Metre | 247.4 | ₹2,52,348 |
| 5 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,020 | Square Metre | 21.75 | ₹22,185 |
| 6 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates)(Non SCADA item) | 1,020 | Square Metre | 202.5 | ₹2,06,550 |
| 7 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,020 | Square Metre | 79.82 | ₹81,416.4 |
| 8 | Providing and laying in situ cement concrete M -20 with tremix treatment for 200 mm thickness for
Concrete Road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20
mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( Natural
Sand /VSI grade finely washed crushed sand) etc. complete -- M30 Item Converted to M20 Item. DIfference in Cost
of Cement 0.40 MT - 0.35 MT = 0.05 MT at Rs 6000 is 0.05 x 6000 = Rs 300, hence Final Rate = Basic Rate for M30
Item - Rs 3000 - Rs 126 for NON SCADA i.e. (8446 - 300 - 126 = 8020 Final Rate = 8020.00 | 66 | Cubic Metre | 8,413.31 | ₹5,55,278.46 |
| 9 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete | 70.6 | Cubic Metre | 654.98 | ₹46,241.59 |
| 10 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complet | 70.6 | Cubic Metre | 79 | ₹5,577.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.62 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.63 MB
Tendernotice_5.pdf
PDF • 0.39 MB
Tendernotice_6.pdf
PDF • 0.12 MB
Tendernotice_7.pdf
PDF • 0.36 MB
BOQ_2270874.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .