Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 CrAccepted-Finance 30 INDUSTRIAL AREA KOKAR RANCHI 834004 JHARKHAND | RANCHI | JHARKHAND | 834004 | ₹36.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹37.3 Cr+₹73.6 L (2.01%)Rejected-Finance | ₹37.3 Cr+₹73.6 L (2.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹37.6 Cr+₹1.0 Cr (2.85%)Rejected-Finance | ₹37.6 Cr+₹1.0 Cr (2.85%) | L3 | Rejected-Finance L3 |
| 4 | L4₹47.3 Cr+₹10.8 Cr (29.4%)Rejected-Finance AT CHAPARIA PO KOIRIDIH PS JASIDIH DIST DEOGHAR JHARKHAND PIN 814153 | GODDA | JHARKHAND | 814153 | ₹47.3 Cr+₹10.8 Cr (29.4%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical 1 CROOKED LANE ROOM NO 205 2 FLOOR KOLKATA 700069 WEST BENGAL PH 9167480150 | - | - | Rejected-Technical NON RESPOSNIVE |
| Sl No | Description | Qty | Unit | MANOJ KUMAR SINGH L4 | M/s Raj Construction L1 | M/S PRASAD CONSTRUCTION & CO L3 | SARYUG GAUTAM CONSTRUCTION PVT LTD L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. | 8,384.7 | CU.M | 154.86 ₹12,98,454.64 | 132.84 ₹11,13,823.55 | 200 ₹16,76,940 | 123 ₹10,31,318.1 Lowest |
| 2.00 | Extra for earthwork in Hard soil as per specification and direction of E/I. (vide classification of soil item -B) | 8,308.05 | CU.M | 15.82 ₹1,31,433.35 | 13.57 ₹1,12,740.24 | 20 ₹1,66,161 | 13 ₹1,08,004.65 Lowest |
| 3.00 | FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 3,248.12 | CU.M | 56.39 ₹1,83,161.49 | 48.37 ₹1,57,111.56 | 100 ₹3,24,812 | 45 ₹1,46,165.4 Lowest |
| 4.00 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) | 720.78 | CU.M | 601.3 ₹4,33,405.01 | 515.82 ₹3,71,792.74 | 600 ₹4,32,468 | 478 ₹3,44,532.84 Lowest |
| 5.00 | Providing designation 75-A, BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge | 1,771.04 | SQ.M. | 363.65 ₹6,44,038.7 | 303.04 ₹5,36,695.96 | 300 ₹5,31,312 | 289 ₹5,11,830.56 Lowest |
| 6.00 | Providing designation 75-B, one BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge | 18.01 | SQ.M | 336.95 ₹6,068.47 | 297.31 ₹5,354.55 | 300 ₹5,403 | 268 ₹4,826.68 Lowest |
| 7.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||||
| 8.00 | 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 296.47 | CU.M | 4,690.19 ₹13,90,500.63 | 4,046.44 ₹11,99,648.07 | 4,600 ₹13,63,762 | 3,725 ₹11,04,350.75 Lowest |
| 9.00 | 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone
aggregate 20 mm nominal size) | 5.51 | CU.M | 4,207.92 ₹23,185.64 | 3,960.39 ₹21,821.75 | 4,600 ₹25,346 | 3,342 ₹18,414.42 Lowest |
| 10.00 | Providing and filling BRICK BATS in toilet sunken slab after waterproofing treatment of slab and beam sides including all taxes all complete. | 188.56 | CU.M | 615.83 ₹1,16,120.9 | 528.28 ₹99,612.48 | 550 ₹1,03,708 | 489 ₹92,205.84 Lowest |
Tender Value
Refer Docs
EMD Value
₹46.2 L
Closing Date
29 Jun 2026, 5:00 pmClosed
Nodal Officer
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Beside Jharkhand Mantralaya, Dhurwa, Ranchi- 834004.
Construction of New Building of S.S. Memorial College Ranchi under Ranchi University, Ranchi
2026_JSBCC_114683_1
JSBCCL/31/2026-27
Open Tender
Civil Works - Buildings
Item Rate
630 days
Ranchi
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹46.2 L
JSBCCL
9 Jul 2026
1 Jun 2026
1 Jul 2026
1 Jun 2026
29 Jun 2026
1 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. | 8,384.7 | CU.M | - | - |
| - | Extra for earthwork in Hard soil as per specification and direction of E/I. (vide classification of soil item -B) | 8,308.05 | CU.M | - | - |
| - | FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 3,248.12 | CU.M | - | - |
| - | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) | 720.78 | CU.M | - | - |
| - | Providing designation 75-A, BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge | 1,771.04 | SQ.M. | - | - |
| - | Providing designation 75-B, one BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge | 18.01 | SQ.M | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| - | 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 296.47 | CU.M | - | - |
| - | 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone
aggregate 20 mm nominal size) | 5.51 | CU.M | - | - |
| - | Providing and filling BRICK BATS in toilet sunken slab after waterproofing treatment of slab and beam sides including all taxes all complete. | 188.56 | CU.M | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_155067.xls
BOQ • 0.79 MB
SBD31.pdf
Tender Documents • 11.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .