Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.3 LAdmitted-Finance 5TH FLOOR PUNJA BUILDINGS ABOVE SRIRAM SANITARY MG ROAD DHAKSHINA KANNADA DAKSHINA KANNADA KARNATAKA 575003 | DAKSHINA KANNADA | KARNATAKA | 575003 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PETROCON ENGINEERS AND CONSULTANTS L1 |
|---|---|---|---|---|
| .10PRE-POST TIE-UP | ||||
| 1.00 | PRE-BID & POST BID TIE-UP THROUGH MOU WITH ENGINEERING ASSOCIATE/ CONSULTANT FOR CARRYING OUT DESIGN AND DETAIL ENGINEERING FOR CONSTRUCTION OF REFRIGERATED DOUBLE WALL STORAGE TANK (DWST} FOR DEBOTTLENECKING & AUGMENTATION OF CRYOGENIC FACILITIES AT BPCL'S URAN LPG TERMINAL
THE PRE BID ENGINNERING INVOLVES PROVIDING DETAILED BOQ INLINE WITH CLIENT's TENDER REQUIREMENT.
THE POST BID ENGINEERING INVOLVES CARRYING OUT DETAILED DESIGN AND DETAIL ENGINEERING FOR CONSTRUCTION OF REFRIGERATED DOUBLE WALL STORAGE TANK (DWST} FOR DEBOTTLENECKING & AUGMENTATION OF CRYOGENIC FACILITIES AT BPCL'S URAN LPG TERMINAL | 1 | L.S | 59,27,500 ₹59,27,500 Lowest |
| 2.00"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST." | ||||
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
17 May 2022, 5:00 pmClosed
General Manager(Engg.)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
PRE-BID and POST BID TIE-UP THROUGH MOU WITH ENGINEERING ASSOCIATE/ CONSULTANT FOR CARRYING OUT DESIGN AND DETAIL ENGINEERING FOR CONSTRUCTION OF REFRIGERATED D.W.S.T. FOR DEBOTTLENECKING and AUGMENTATION OF CRYOGENIC FACILITIES AT BPCL LPG TERMINAL,
2022_BandR_687463_1
BandR/ERE/BD-136/ BPCL /DWTANK/D and E/NIT/01
Open Tender
Miscellaneous Works
Works
543 days
BPCL LPG TERMINAL, URAN
As Per Tender Document
14 documents required · 14 mandatory
₹1,000
Yes
Bridge and Roof Co.India Ltd
₹1 L
Yes
31 May 2022
6 May 2022
18 May 2022
6 May 2022
17 May 2022
6 May 2022
Amount
PRE-POST TIE-UP
PRE-BID & POST BID TIE-UP THROUGH MOU WITH ENGINEERING ASSOCIATE/ CONSULTANT FOR CARRYING OUT DESIGN AND DETAIL ENGINEERING FOR CONSTRUCTION OF REFRIGERATED DOUBLE WALL STORAGE TANK (DWST} FOR DEBOTTLENECKING & AUGMENTATION OF CRYOGENIC FACILITIES AT BPCL'S URAN LPG TERMINAL THE PRE BID ENGINNERING INVOLVES PROVIDING DETAILED BOQ INLINE WITH CLIENT's TENDER REQUIREMENT. THE POST BID ENGINEERING INVOLVES CARRYING OUT DETAILED DESIGN AND DETAIL ENGINEERING FOR CONSTRUCTION OF REFRIGERATED DOUBLE WALL STORAGE TANK (DWST} FOR DEBOTTLENECKING & AUGMENTATION OF CRYOGENIC FACILITIES AT BPCL'S URAN LPG TERMINAL
"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .