Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.0 LAdmitted-Finance | -21.97% | ₹39.0 L | L1 | Admitted-Finance |
| 2 | L2₹40.7 L+₹1.7 L (4.40%)Admitted-Finance | -18.54% | ₹40.7 L+₹1.7 L (4.40%) | L2 | Admitted-Finance |
| 3 | L3₹41.0 L+₹2.0 L (5.07%)Admitted-Finance | -18.01% | ₹41.0 L+₹2.0 L (5.07%) | L3 | Admitted-Finance |
| 4 | L4₹43.1 L+₹4.1 L (10.5%)Admitted-Finance | -13.74% | ₹43.1 L+₹4.1 L (10.5%) | L4 | Admitted-Finance |
| 5 | L5₹44.4 L+₹5.4 L (13.9%)Admitted-Finance | -11.14% | ₹44.4 L+₹5.4 L (13.9%) | L5 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
29 Jul 2026, 6:00 pmClosed
COMMISSIONER MUNICIPAL COUNCIL CHITTORGARH
COMMISSIONER MUNICIPAL COUNCIL CHITTORGARH
NIT NO. 09 S.NO. 25
2026_DLB_575788_25
NIRMAN/2026-27/3940-44 DATED 14.04.2026
Open Tender
Civil Works
Percentage
300 days
CHITTORGARH
2 documents required · 2 mandatory
₹500
500 COMM. MC CHITTORGARH 500 MD RISL JAIPUR
₹1 L
Yes
5 Aug 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
29 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 736.31 | P.Cum | 229.5 | ₹1,68,983.15 |
| 2 | Earth work in excavation in open area, STP, WTP, Pumping station with mechanical means including dressing of sides and ramming of bottoms, including getting out the excavated material, disposal ofexcavated material lead upto 1000m at suitable site as per as per drawing and as per direction of Engineer. (Measurements for payment to be done as per standard drawings In ordinary rock Upto 3.0 m depth | 165.38 | P.Cum | 229.5 | ₹37,954.71 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | P.Cum | 4,575 | - |
| 4 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand | 318.94 | P.Cum | 4,860 | ₹15,50,048.4 |
| 5 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand Extra for random rubble masonry with hard stone in superstructure
above plinth level and upto two stories. | 219.38 | P.Cum | 5,830 | ₹12,78,985.4 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantileve | 200 | P.Sqm | 426 | ₹85,200 |
| 7 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Hot rolled deformed bars | 2,530 | P.Kg | 83.3 | ₹2,10,749 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 18 | P.Cum | 5,101 | ₹91,818 |
| 9 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | - | P.Cum | 6,300 | - |
| 10 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 1,050 | P.Kg | 144.5 | ₹1,51,725 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
TERMSANDCONDITION.pdf
Tender Documents • 3.82 MB
BOQ_1023962.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .