Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹8.3 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | M RAMARAJ L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Reinforced cement concrete works including all initial lead and lift etc complete. | 1 | m3 | 4,307 ₹4,307 Lowest |
| 2.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 161 | m3 | 113 ₹18,193 Lowest |
| 3.00 | Plain Cement concrete 1:4:8 mix (one cement, four sand, eight metal) using 40mm size Hard Broken stone etc complete | 17 | m3 | 5,338 ₹90,746 Lowest |
| 4.00 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29m high for plane surfaces for drain, culverts etc., using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.5cm spaced at about 90cm centre to centre and supported by Casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete as directed. | 418 | m2 | 281 ₹1,17,458 Lowest |
| 5.00 | Plain concrete 1:3:6 (one cement, two sand and four aggregate) using 20mm ISS HBG metal including cost and conveyance of all material to work site and labor charges for mixing,laying,compacting and curing etc, complete as per ss | 78 | m3 | 5,659 ₹4,41,402 Lowest |
| 6.00 | Plastering with cement mortar 1:3 (one cement and three sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications | 81 | m2 | 306 ₹24,786 Lowest |
| 7.00 | Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist andlanding slabs landing beams, canopy etc., in all floor with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm X 25 X 3mm for boarding laid over country wood joinsts of size 10cm X 6.50 cm spaced at about 90cm C/Cand supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123 | 48 | m2 | 1,045 ₹50,160 Lowest |
| 8.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 3.2 | m3 | 7,345 ₹23,504 Lowest |
| 9.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 1.3 | m3 | 6,680 ₹8,684 Lowest |
| 10.00 | Supply and Fixing of SFRA Man Hole Cover 900mm x 900mm | 2 | Nos | 3,244 ₹6,488 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
12 Aug 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
New Construction of Storm Water Drain and Culvert at Indra Nagar West Side near Public Toilet in Ward no 34 of West Zone.
2025_MAWS_589766_38
E3/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
2 Apr 2026
8 Aug 2025
13 Aug 2025
8 Aug 2025
12 Aug 2025
8 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
SWD.pdf
Tender Documents • 0.67 MB
BOQ_705237.xls
BOQ • 0.32 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .