Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹61.1 L+₹73,089.52 (1.21%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹61.1 L+₹73,883.98 (1.22%)Rejected-Finance PLOT NO 3 YOGANAND CO OP HOUSING SOCIETY BEHIND BIJAN HOSPITAL NEAR MALPANNI HOSPITAL VIGHA MALA CANADA CORNER COLLEGE ROAD NASHIK | NASHIK | NASHIK | MAHARASHTRA | L3 | Rejected-Finance L3 | |
| 4 | L4₹61.8 L+₹1.5 L (2.45%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹62.3 L+₹2.0 L (3.26%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹79.4 L
EMD Value
₹79,445
Closing Date
1 Dec 2020, 3:00 pmClosed
Executive Engineer, NHM,NASHIK Circle, NASHIK
DDHS,SANDARBH SEVA RUGNALY CAMPUS, SHALIMAR NASHIK
Labour Room Upgradation And Extension of ward, Solar System supply and Staff Quarter Repair and Renovation at Rural Hospital Sangamner, Tal Sangamner, Dist- Ahmednagar
2020_NHM_621711_1
NHM/IDW/EE/5/20-21
Open Tender
Civil Works
Percentage
270 days
sangamner
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,120
₹79,445
9 May 2022
3 Nov 2020
2 Dec 2020
3 Nov 2020
1 Dec 2020
3 Nov 2020
eProcurement System Government of Maharashtra Created By: Ankush Patil Created Date/Time: 21-Jan-2021 12:40 PM Tender Title: RH SANGAMNER LR 13TH FC Tender ID: 2020_NHM_621711_1
Tender Inviting Authority: Executive Engineer, National Health Mission,Nashik Circle, Nashik
Name of Work: Labour Room Upgradation And Extension of ward, Solar System supply and Staff Quarter Repair and Renovation at Rural Hospital Sangamner,Dist- Ahmednagar
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s B M Infrastructures(GSTN-27AASFB9559P1Z8) 7944514.00 -22.17 6183215.25 Sixty One Lakh Eighty Three Thousand Two Hundred and Fifteen
2.00 shri. sudhir vitthalrao katore(GSTN-27AIXPK9040M1ZE) 7944514.00 -16.32 6648152.04 Sixty Six Lakh Fourty Eight Thousand One Hundred and Fifty Two
3.00 SHREE BALDEV CONSTRUCTION(GSTN-27AGAPP1015G1ZV) 7944514.00 -12.12 6981638.90 Sixty Nine Lakh Eighty One Thousand Six Hundred and Thirty Eight
4.00 Krushna Infrastructure(GSTN-27AALFK0177B1ZJ) 7944514.00 -21.55 6232471.23 Sixty Two Lakh Thirty Two Thousand Four Hundred and Seventy One
5.00 balasahebvishwanathdighe(GSTN-27ABJPD6138L1ZF) 7944514.00 -21.11 6267427.09 Sixty Two Lakh Sixty Seven Thousand Four Hundred and Twenty Seven
6.00 Manish Kulkarni(GSTN-27AGCPK5155C1ZP) 7944514.00 -23.11 6108536.81 Sixty One Lakh Eight Thousand Five Hundred and Thirty Six
7.00 M/s Kranti Construction(GSTN-27AAGFK6763J1ZV) 7944514.00 -23.10 6109331.27 Sixty One Lakh Nine Thousand Three Hundred and Thirty One
8.00 M/S Dinesh Jadhav(GSTN-27AGCPJ3557F1ZI) 7944514.00 -21.10 6268221.55 Sixty Two Lakh Sixty Eight Thousand Two Hundred and Twenty One
9.00 Asawa Constructions(GSTN-NA) 7944514.00 -24.03 6035447.29 Sixty Lakh Thirty Five Thousand Four Hundred and Fourty Seven
10.00 S.D.GHOLAP(GSTN-NA) 7944514.00 -16.00 6673391.76 Sixty Six Lakh Seventy Three Thousand Three Hundred and Ninty One
Lowest Amount Quoted BY: Asawa Constructions(6035447.29)
BOQ Summary Details Tender Title: RH SANGAMNER LR 13TH FC Tender ID: 2020_NHM_621711_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Asawa Constructions 6035447.29 L1
2 Manish Kulkarni 6108536.81 L2
3 M/s Kranti Construction 6109331.27 L3
4 M/s B M Infrastructures 6183215.25 L4
5 Krushna Infrastructure 6232471.23 L5
6 balasahebvishwanathdighe 6267427.09 L6
7 M/S Dinesh Jadhav 6268221.55 L7
8 shri. sudhir vitthalrao katore 6648152.04 L8
9 S.D.GHOLAP 6673391.76 L9
10 SHREE BALDEV CONSTRUCTION 6981638.90 L10
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .