Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | L1 | Accepted-AOC Work Awarded | |
| 2 | L2₹6.7 L+₹1.3 L (24.2%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹6.9 L+₹1.5 L (27.4%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹7.1 L+₹1.6 L (30.0%)Rejected-Finance HPSEBL THALOUT | KANGRA | HIMACHAL PRADESH | 176201 | L4 | Rejected-Finance Rejected |
Tender Value
₹7.6 L
EMD Value
₹15,230
Closing Date
6 Aug 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Jal Shakti Division, Arki.
Executive Engineer, Jal Shakti Division, Arki.
Restoration of rain damages of GWSS Giana in G.P Giana Tehsil Arki Distt. Solan HP (SH- Construction of RCC DOM main storage tank of 100000 liters capacity (Under PMKKKY) (DMFT).
2022_HPIPH_63207_1
6075-6130 dated 28-07-2022
Open Tender
Civil Works
Item Rate
90 days
Giana
Please refer Tender documents.
7 documents required · 7 mandatory
₹250
Yes
₹15,230
Yes
26 Nov 2024
29 Jul 2022
6 Aug 2022
29 Jul 2022
6 Aug 2022
29 Jul 2022
29 Jul 2022 - 6 Aug 2022
120 days
Amount
Excavation in foundation, trenches etc. earth work in all type of soil such as pick work, jumper work, blasting work kankar,mooram singles including decomposed soft and hard rock etc. upto all heights stacking the excavated earth not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths and sides of foundation etc.consolidating each deposited layer by raming and watering and then disposing of all surplus excavated earth upto all leads and lifts as directed by the Engineer in charge complete in all respects.
Providing and laying cement concrete 1:3:6(1 Cement :3 Sand : 6 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in foundation and plinth including all carriage of materials upto all leads and lifts complete in all respects.
Providing and laying CC 1:1:2 (1Cement: 1 Sand : 2 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement in :-
Foundation ,footing, base of columns and the like & mass concrete including carriage of materials upto all leads and lifts complete in all respects.
walls (any thickness but not exceeding 0.1 meters thickness ) including attached pillasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level including carriage of materials upto all leads and lifts complete in all respects. from top of foundation level upto floor two level including carriage of materials upto all leads and lifts complete in all respects.
Providing form work with mild steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu reinforced concrete work and plain concrete work in :-
Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects.
Providing form work of ordinary timber plankings so as to give a rough finish including centering, shuttering, struting & propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu rereinforced concrete and plain concrete work in:
Arches beyond 6.00 meters span including carriage of materials upto all leads and lifts complete in all respects.
Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in.
Suspended floor, roofs landings shelves and their supports, balconies, beams, girders, bressumers and cantilevers up to floor two level including carriage of materials with in all leads and lifts, complete in all respects.
Arches upto floor two level including carriage of materials upto all leads and lifts complete in all respects.
Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level including cost of binding wires and carriage of materials upto all leads and lifts complete in all respects.
Steel work welded in built up sections including cutting, hoisting, fixing, in position and applying a priming coat of red lead paint :
In grating framed guard, bars, ledders, railing, brackets and similar works including carriage of materials upto all leads and lifts complete in all respects.
Laying and Jointing 100 mm dia GMS tube (Light class) for scour , over flow, outlet , inlet , ventilating pipe including all carriage of materials upto all leads and lifts complete in all respects.
Manufacturing, supplying & fixing of M.S frame 35x35x5mm with M.S sheet man hole cover 1.66mm thick made of M.S Angle 25x25x5mm with locking arrangement with lock and painting with red oxide complete in all respects as per drawing & design with in all leads & lifts complete & as per the direction of the Engineer-in Charge.
Chetan Thakur
Anoop Kumar Sharma Govt. Contractor
inder singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .