Loading…
Loading…
Tender Value
₹11.6 Cr
EMD Value
₹5.8 L
Closing Date
25 Jun 2026, 6:00 pmClosed
Chief Engineer Metro PIU
Metro PIU 7th floor New MMRDA Building BKC
Design, Manufacture, Supply, Installation, Testing and Commissioning of Signage, Graphics And station furniture for 6 Elevated Stations of Metro Line 5 Corridor Thane-Bhiwandi-Kalyan of Mumbai Metro Rail Project of MMRDA
2026_MMRDA_1295210_1
MMRDA/MPIU/ML5/CA-311
Open Tender
Civil Works
Percentage
Thane
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,540
₹5.8 L
MMRDA BKC
19 Aug 2026
15 Apr 2026
30 Jun 2026
15 Apr 2026
25 Jun 2026
15 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Schedule A - Design,
Manufacturing, Supply
and Installation of
Signage and Graphics | - | Nos | - | - |
| 1.02 | Schedule B -
Supply, Installation and
Placing in posistion of
Station Elements | - | Nos | - | - |
| 1.03 | Schedule C -
PROVISIONAL SUM | - | - | - | - |
| 1.04 | Schedule D - Supply,
installation, and placing
in position of steps made
of Fiberglass Reinforced
Plastic (FRP) moulded
grating | - | Nos | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_2225453.xls
BOQ • 0.39 MB
Tender_CA311.rar
Tender Documents • 19.90 MB
Reply_to_pre-bid_queries.pdf
PDF • 0.30 MB
Addendum1.pdf
PDF • 4.63 MB
corrigendum_5.pdf
PDF • 0.10 MB
corrigendum4.pdf
PDF • 0.10 MB
corrigendum_3.pdf
PDF • 0.10 MB
corrigendum_2.pdf
PDF • 0.10 MB
corrigendum_1.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .