Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 BAMANAI LUHETA HATHRAS HATHRAS UTTAR PRADESH 204101 | HATHRAS | UTTAR PRADESH | 204101 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 01 NAUJARPUR BASAI KAJI SASNI HATHRAS UTTAR PRADESH 202150 | ALIGARH | UTTAR PRADESH | 202150 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
27 Mar 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, ESWC, ALIGARH
ALIGARH
ESWCA-08/2024-25
2024_DVVNL_983713_1
ESWCA-08/2024-25
Open Tender
Electrical Works
Turn-key
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL WEBSITE (dvvnl.org)
₹3,000
3 Apr 2025
15 Dec 2024
27 Mar 2025
15 Dec 2024
27 Mar 2025
15 Dec 2024
Amount
Safe Carriage of following Centralized Items from ESC- Aligarh to praposed site Inclouding loading & unloading at both ends.
33 KV Double Transformer Control Panel.
33 KV VCB 800A, 750 MVA
33 KV CT, 200/100/1-1-1A
11 K.V. XLPE AL 3x300 Sq. mm.
11 KV Jointing Kit 3x300 Sq. mm Indoor
11 KV Jointing Kit 3x300 Sq. mm Outdoor
Supply/Providing of follwoing materials (Decentralized materials) by contractor from Sr. No. 1 to 2
Control Cable 4x2.5 Sq. mm.Cu. xlpe
Control Cable 2x2.5 Sq. mm.Cu. Xlpe
Erection of following Material & Miscellaneous Electrical Works. (As Per RESPO Norms) :-
Plinth for 33 KV V.C.B.
Construction of plinth for the structure of 33 KV VCB & C.T.’s as per details for . (All required materials provided/Supply by the contractor own his cost) :- Excavation of earth of size 2x(2.0x2.0x1.0)m pits for construction of plinth.
Brick Ballast ratio (1:4:8) (cement, sand & brick ballast) for foundation work 2x(2.0x2.0x0.5)m plinth.
R.C.C. work in ratio 1:2:4 (cement, coarse sand & stone grit) of 20m size for making plinth of size 2x(2.0x2.0x1.0)m and grouting of foundation bolts 04 Nos. for 33 KV VCB.
12mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side
Earthing of Power T/F, details as given below:-
Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 3mm into the ground at 20 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the G.I.Earth strip size 50x6mm will be welded to the G.I. pipe and neutral earthing support & other installed equipment in switchyard. All required material provided / supply by the contractor own his cost.
Removal of existing 05 MVA Transformer and other accessories equipments.
Disconnecting HT cable connection from 33KV side & 11KV side of 5 MVA Power transformers for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
Disconnecting Earthing strip from body of 5 MVA Power transformer.
Safe Shifting of 5 MVA Power transformer from existing plinth to safe place in the 33/11 KV substation switchyard.
H.T. Power Cable Laying (11 KV 3X300sqmm):
Laying 11 KV, (3x300) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
Preparation of 11 KV Power Cable Jointing Kits:
Making of 11 KV XLPE Heat shrinkable Indoor/outdoor jointing kits 3x300Sq.mm/3x70Sq.mm after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs
Laying of Control Cables (2x2.5)mm2/ (4x2.5)mm :
Laying of different size of (2x2.5)mm2/ (4x2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT’s to CT’s Junction Box, 33 KV CT, 33 KV PT, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment.
Painting of Structures :
Painting of the all structures with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect.
Installation of 33 KV VCB :
Assembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required.
Installation of 33 KV Double T/F Control Panel.
Carefully and safely shifting of 33 KV Double T/F control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment.
Installation of 33 KV C.T.’s:
Installation of 3 Nos. C.T.’s on the C.T’s structure Steel structure material will be provided by contrector. The work includes fabrication for proper fixing, if required to complete the work.
33 KV CT’s Junction Box:
Providing & fixing of junction box of size (400x400x150) mm made of G.I. sheet of 16 SWG in between 33 KV CT’s & control panel. The work also include making proper connection on the junction box and making all connection in between CT’s and control panel complete as per manufacture’s panel drawing including testing and commissioning of work etc. complete the work.
Providing and Fabrication os erection of cable support made of two pieces of M.S. Angle 65x65x6 mm 3.5 Mtr. Long Joined to each other by means of 5 Nos. M.S. angle 65x65x6 mm pices of size 3 feet long each by welding at equal intervals as per drawing and grouting in a block of size 300x300x700 mm complete and pinting with one coat of ready mixed primer and two coats of aluminium paints this includes providing the cable including nuts & bolts.
10 MVA Power Transformer.
Making of HT cable connection from 33KV side & 11KV side of 10 MVA Power transformers for after proper shutdown.
Proper Welding of Earthing strip from Power transformer neutral & body Earthing.
VINAYAK ELECTRICALS (BID ID -5059379)
SHARMA ELECTRIC WORKS (BID ID -5083580)
P K ENTERPRISES (BID ID -5083590)
Bobby Electricals (BID ID -5059526)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .