| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.4 LAccepted-AOC | ₹17.4 L | 1 | Accepted-AOC Lowest amount quated |
| 2 | 2₹17.7 L+₹24,900 (1.43%)Rejected-AOC | ₹17.7 L+₹24,900 (1.43%) | 2 | Rejected-AOC Highest amount quated |
| Sl No | Description | Qty | Unit | S.Balasubramaniam L1 | Manimaran L2 |
|---|---|---|---|---|---|
| 1.00Name of Work:1.Construction of 30000 litre OHT Tank 12.00m stage near Library building @ Arasampalayam H/o Arasampalayam panchayat. | |||||
| 2.00 | Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, In hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravely stoney earth and earth mixed with small sized boulders and hard gravelly soil First depth of 2m From 0 to 2 m below GL | 46.31 | cum | 263.7 ₹12,211.95 Lowest | 270 ₹12,503.7 |
| 3.00 | Second depth of 2m From 2m to 4 m below GL | 9.22 | cum | 263.7 ₹2,431.31 Lowest | 270 ₹2,489.4 |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 2.3 | cum | 5,355.7 ₹12,318.11 Lowest | 5,400 ₹12,420 |
| 5.00 | RCC 1:1.5:3 (One cement, one and half sand and three agreegates) using 20mm HBG stone excluding cost of reinforce ment, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishsing, curing etc., complete.1.50m to 4.50m below G.L.Below 1.5m from GL | 10.37 | Cum | 8,978.4 ₹93,106.01 Lowest | 9,000 ₹93,330 |
| 6.00 | 0m to 1.50m below GL | 1.75 | Cum | 8,978.4 ₹15,712.2 Lowest | 9,000 ₹15,750 |
| 7.00 | 0m to 4.50m above GL | 2.83 | Cum | 9,395.8 ₹26,590.11 Lowest | 9,400 ₹26,602 |
| 8.00 | 4.50 m to 7.32 m above GL | 2.23 | Cum | 9,397.4 ₹20,956.2 Lowest | 9,400 ₹20,962 |
| 9.00 | 7.32 m to 10.98 m above GL | 2.53 | Cum | 9,675.2 ₹24,478.26 Lowest | 9,700 ₹24,541 |
| 10.00 | 10.98 m to 14.64 m above GL | 11.41 | Cum | 9,953.8 ₹1,13,572.86 Lowest | 10,000 ₹1,14,100 |
Tender Value
₹18.3 L
EMD Value
₹18,300
Closing Date
24 Feb 2026, 3:00 pmClosed
Block development officer vp
Panchayat office Arasampalayam
Construction of 30000 litre OHT Tank 12 m stage near Library building at ArasampalayamHo Arasampalayampt
2026_RDTN_662163_1
1044/2023/A4/13/02/2026
Open Tender
Civil Works
Works
90 days
Arasampalayam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹18,300
Yes
6 Jul 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work:1.Construction of 30000 litre OHT Tank 12.00m stage near Library building @ Arasampalayam H/o Arasampalayam panchayat. | - | - | - | - |
| 2 | Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, In hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravely stoney earth and earth mixed with small sized boulders and hard gravelly soil First depth of 2m From 0 to 2 m below GL | - | cum | - | - |
| 3 | Second depth of 2m From 2m to 4 m below GL | - | cum | - | - |
| 4 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 1 | cum | - | - |
| 5 | RCC 1:1.5:3 (One cement, one and half sand and three agreegates) using 20mm HBG stone excluding cost of reinforce ment, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishsing, curing etc., complete.1.50m to 4.50m below G.L.Below 1.5m from GL | 1 | Cum | - | - |
| 6 | 0m to 1.50m below GL | - | Cum | - | - |
| 7 | 0m to 4.50m above GL | - | Cum | - | - |
| 8 | 4.50 m to 7.32 m above GL | - | Cum | - | - |
| 9 | 7.32 m to 10.98 m above GL | 1 | Cum | - | - |
| 10 | 10.98 m to 14.64 m above GL | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_794922.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
BOQ_794922.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .