| # | Company | Amount | Status |
|---|---|---|---|
| 1 | M/s Deejay System Consultants Private Limited, Gurgaon ₹27.3 L | - | |
| 2 | Qualified | Qualified | |
| 3 | Qualified | Qualified | |
| 4 | Qualified | Qualified |
Tender Value
Refer Docs
EMD Value
₹63,000
Closing Date
3 Dec 2022, 11:00 amClosed
Diptirekha Sahoo
Power Grid Corporation of India Ltd, Eastern Region-II, Odisha Projects, Plot No.4, Unit No.41, Niladri Vihar, Chandrashekharpur, Bhubaneswar-751 021
Carrying out Electrical Survey of OPTCL Substation for implementation of STAMS (State Transmission Asset Management System) project of OPTCL by POWERGRID as a consultant on Turnkey basis
ODP/BB/CnM-2999/LTE-61/RFx-5006003852/22-23
Limited
Architecture/Interior Design
Works
POWERGRID
₹63,000
9 Dec 2022
22 Nov 2022
3 Dec 2022
22 Nov 2022
3 Dec 2022
22 Nov 2022
Electrical Survey 400/220/132/33 KV
Electrical Survey 400/220/33 KV
Electrical Survey 220/132 KV
Electrical Survey 220/132/33 KV
Electrical Survey 220/33 KV
Electrical Survey 132/33 KV
Electrical Survey 132KV SWITCHING STATIONS
Item Description
Supply, Delivery & Demonstration of Corona Imaging Camera with all accessories and cable etc with software features conforming to POWERGRID Technical Specification enclosed at Volume-II
Carrying out Electrical Survey of OPTCL Substation for implementation of STAMS (State Transmission Asset Management System) project of OPTCL by POWERGRID as a consultant on Turnkey basis)
ODP/BB/C&M-2999/LTE-61/RFx-5006003852/22-23
General guidelines for filling up the Attachments
Fill up only green shaded cells in the relevent attachments.
Attachments Bid Form for 1st Envelope, 3(QR), Attach QR, 4, 5, 5 (A), 6, 7, 7A, 8, 9, 10, 11, 11-IP, 12, and 13 are included here.
Attachment 1 Bid Security : To be submitted as per proforma provided in the bidding document.
Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
Attachment 11 Integrity Pact : Not Applicable for this package
Attachment 7A: Scanned copies in respect of Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise etc. as applicable shall be uploaded,)
Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
Sole Bidder
2 or More
JV (Joint Venture)
2 or More
Attachment-3(JV)
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Other Partner-2
Printed Name :
Designation :
Attachment- 3 (QR)
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Attached copies of original documents of the Bidder in PDF format.
The constitution or legal status;
The principal place of business;
The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
GENERAL INFORMATION
Particulars
Name of the Firm
Head Office/ Registered Office Address
Telephone
Contact Person
Place of Incorporation/ Registration
Year of Incorporation/ Registration
Nationality
TECHNICAL REQUIREMENTS
Technical Experience
{Reference para I, Part -A of Annexure-A (BDS)}
Using the following format, each Bidder (individual firms ) is requested to list the contracts of a nature similar to the proposed contract for which the Bidder wishes to qualify, undertaken during the last seven (7) years. The information is to be summarised for each such contract separately.
Name of Contract Undertaken
Contract Reference No. & Date of Award
Name and Address of the Employer/Utility for whom the Contract was executed by the firm
Scope of work executed under the above contract (as in Sl No (i) of 2.1.1) (Tick only whichever is/are applicable)
If Contract was taken as JV partner scope of partner
Date of Completion of Contract
Details of documents furnished in the Bid, in support of the aforesaid data/ details/ information
Financial requirement
{Reference para II, Part -A of Annexure-A (BDS)}
(b) Bidder shall have liquid assets (L.A.) or/and evidence of access to or availability of credit facilities of not less than INR 2.27 Crores. The Letter/ certificate regarding availability of credit facilities (along with utilization) from the bank should have been issued not more than three months prior to the date of NIT publication.
In support of its ‘Financial Position’, in line with the above, the Bidder must provide the relevant information, alongwith documentary evidence, in the following formats A & B:
Average Annual Turnover details:
Financial year
Liquid Assets
LITIGATION HISTORY: Details of litigation History resulting from the contracts completed or under execution by the bidder over last five years.
Name of Client, cause of Litigation/Arbitration and matter of dispute
Technical Credentials: List of work regarding past experience indicating the execution of similar work successfully, schedule time of completion and actual time of completion, the present status of projects in hand along with presently envisaged completion dates, qualification and experience of key personnel proposed for carrying out the subject work. List of available T & P and Manpower available with the bidder is also to be enclosed
Works in Hand
Value of Outstanding projects
List of Tools, Equipments & Plants
Name of Machine
Qualification & Experience of key personal:
Designation
Printed Name :
Designation :
Attachment- 4
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Volume/ Clause
Printed Name :
Designation :
Vol./ Clause
Printed Name :
Designation :
Attachment- 5
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Volume/ Clause
Printed Name :
Designation :
Vol./ Clause
Printed Name :
Designation :
Attachment- 5(A)
ODISHA PROJECTS
Volume of Bidding document
NO DEVIATION IN THE PROVISION OF IMPORTANT/CRTICAL CONDITION OF THE TENDER IS ALLOWED
Printed Name :
Designation :
Vol./ Section
Printed Name :
Designation :
Attachment- 6
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Brief description of Information
The Bidder should accordingly upload the scanned copies of the relevant documents (Refer Clause 15.4 of ITB, Sec - I of bidding documents).
Printed Name :
Designation :
Brief description of Information
Printed Name :
Designation :
Attachment - 7
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Description of Work/ Activity
completion
Printed Name :
Designation :
Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Attachment-7A
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Deduction from Bill
Name of the Supplier/ Contractor in whose favour payment is to be made
Address with PIN Code and State
Status – Company/others
Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached. Please refer remarks at the end of attachment
If 3 (b) is ‘Yes’ please mention whether you are (Proprietary MSE/Partnership MSE/Private Limited Company) owned by SC/ST entrepreneurs
Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment order 2018 including subsequent amendment/notification/ order (Indicate Yes/No) Note: Documentary evidence is to be attached.
Permanent Account (PAN) No.
GSTN No.
Work Contract Tax No.
PF Registration No. of the Company
PF Regional Office covered (with Address)
Name of Contact Person
Telephone No(s)
Bank Details for Electronic Payment
Saving Account
9 digit MICR code printed at bottom in middle, next to cheque no.
IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
Printed Name :
Designation :
Attachment - 8
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Name of the person with designation in POWERGRID
Printed Name :
Designation :
Attachment - 8
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Name of the person with designation in POWERGRID
Printed Name :
Designation :
Attachment - 8
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Name of the person with designation in POWERGRID
Printed Name :
Designation :
Attachment-9
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Printed Name :
Designation :
Attachment-10
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Printed Name :
Designation :
Attachment-11
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Printed Name :
Designation :
The requisite format of Integrity Pact is getting generated automatically and displayed here below.
Take print out of first page on a non-judicial stamp paper of Rs. 100/- purchased in Bidder's name and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
For further details bidders may please refer ITB Clause 9.3 (n).
(Signature)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Page 1 of 8
POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC/PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID's Rules.
The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles during his participation in the tender process and during the contract execution :
(Signature)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Page 2 of 8
The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or the execution of the contract.
The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC/IPC Act.
The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same
The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Page 3 of 8
If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures, ban/blacklist the Bidder/Contrator in line with POWERGRID's policy for Black-Listing of Firms/Banning of Business". The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid.
If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section-III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other company, in any country, that may impinge on the Anti-Corruption principle.
(Signature)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Page 4 of 8
If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID's policies.
POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of IEMs have been indicated in the Bidding Documents.
The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Page 5 of 8
The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He/She reports to the Chairman-cum-Managing Director, POWERGRID.
The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his/her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
POWERGRID will provide to the IEM information as sought by him/her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on 'Non-Disclosure of Confidential Information' and of 'Absence of Conflict of Interest'. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case.
As soon as the IEM notices, or believes to notice, a violation of this agreement, he/she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC/IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Page 6 of 8
While representing any matter in relation to the Integrity Pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter.
The word ‘IEM’ would include both singular and plural.
This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
Changes and supplements as well as termination notices need to be made in writing. Side Agreements have not been made.
If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
(Signature)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Page 7 of 8
CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Office Seal)
Designation :
Witness 1 :
Designation :
Witness 2 :
Designation :
Page 8 of 8
Attachment- 12
POWER GRID CORPORATION OF INDIA LIMITED,
ODISHA PROJECTS
Name of Materials/Labour
Supply & Placement of Reinforcement Steel
High Speed Diesel coefficient
Labour coefficient
Ferrous Metals coefficient
For Concreting
High Speed Diesel, coefficient a =
Labour, coefficient l =
Cement & Lime, coefficient b =
Structural Clay Products coefficient
Printed Name :
Designation :
Attachment-13
ODISHA PROJECTS
PLOT NO.-4, UNIT-41, NILADRI VIHAR
Printed Name :
Designation :
Three
Seven
Eight
Eleven
Twelve
Thirteen
Fourteen
Fifteen
Sixteen
Seventeen
Eighteen
Nineteen
Twenty
Twenty One
Twenty Two
Twenty Three
Twenty Four
Twenty Five
Twenty Six
Twenty Seven
Twenty Eight
Twenty Nine
Thirty
Thirty One
Thirty Two
Thirty Three
Thirty Four
Thirty Five
Thirty Six
Thirty Seven
Thirty Eight
Thirty Nine
Forty
Forty One
Forty Two
Forty Three
Forty Four
Forty Five
Forty Six
Forty Seven
Forty Eight
Forty Nine
Fifty
Fifty One
Fifty Two
Fifty Three
Fifty Four
Fifty Five
Fifty Six
Fifty Seven
Fifty Eight
Fifty Nine
Sixty
Sixty One
Sixty Two
Sixty Three
Sixty Four
Sixty Five
Sixty Six
Sixty Seven
Sixty Eight
Sixty Nine
Seventy
Seventy One
Seventy Two
Seventy Three
Seventy Four
Seventy Five
Seventy Six
Seventy Seven
Seventy Eight
Seventy Nine
Eighty
Eighty One
Eighty Two
Eighty Three
Eighty Four
Eighty Five
Eighty Six
Eighty Seven
Eighty Eight
Eighty Nine
Ninety
Ninety One
Ninety Two
Ninety Three
Ninety Four
Ninety Five
Ninety Six
Ninety Seven
Ninety Eight
Ninety Nine
One Hundred
Bid Form 1st Envelope
FALSE
We are NSIC/MSME registered and exempted from submission of Bid Guarantee as per the provision of clause no. 13.7 of ITB, Section -IV, Vol-I of bidding documents. We have enclosed a copy of NSIC Certificate reference no. dated DD-MM-YYYY and the issued certificate is valid upto and inclusive of DD-MM-YYYY. It is to confirm that the equipment(s)/item(s)/material(s) quoted in our bid is in the list of items indicated in NSIC certificate enclosed.
Tick at least one Option (Yes/No)
NSIC Certificate No.
Carrying out Electrical Survey of OPTCL Substation for implementation of STAMS (State Transmission Asset Management System) project of OPTCL by POWERGRID as a consultant on Turnkey basis)
We, the undersigned Bidder, having read and examined in detail the specification and documents of the subject package including amendment, if any, do hereby propose for Carrying out Electrical Survey of OPTCL Substation for implementation of STAMS (State Transmission Asset Management System) project of OPTCL by POWERGRID as a consultant on Turnkey basis) as detailed in the specification and the bidding documents for the subject package.
Bank Guarantee
BID GUARANTEE/Earnest Money Deposit(EMD):
We have enclosed a Bid Guarantee in original and one copy in the form of Bank Guarantee (Bank Guarantee No.-, dated DD-MM-YYYY issued from ) for a sum of Rupees /-, Valid for a period of Three [03] Calender Months from the date of opening of bids i.e. upto and inclusive of DD-MM-YYYY.
If I/We fail to keep the tender open as aforesaid or make any modifications in the terms and conditions of the tender which are not acceptable to POWERGRID, I/we agree that the POWERGRID shall without prejudice to any other right or remedy, be at liberty to forfeit the said earnest money absolutely. Should this tender be accepted, I/we hereby agree to abide by and fulfill all the terms, conditions and provisions of the aforesaid documents.
If, after the tender is accepted and I/we fail to commence the execution of the works as provided in the conditions, I/we agree that the corporation shall without prejudice to any other right or remedy be at liberty to forfeit the said earnest money absolutely.
PRICES & VALIDITY :
We understand that all prices and price components stated in the bid shall remain firm and not subject to any price adjustment, in line with the bidding documents. All prices and other terms and conditions of this proposal are valid for a period of 03 (Three) months from the date of opening of the price bids. We further declare that prices stated in our proposal are in accordance with your bidding documents.
Further, we confirm that we have read all the provisions in the Invitation for Bid (IFB), Instructions to bidders (ITB), Conditions of Contract for Civil Works and that of Special Conditions of Contract (SCC) (inclusive of those regarding applicable taxes, duties and levies in relevant clauses), Technical specifications & other documents and have submitted the bid accordingly.
We do hereby confirm that our bid prices quoted in our Proposal include, all costs such as cost of necessary materials, their transportation to site, cost towards tools, equipment and machineries including cost of personnel that may be required for successful completion of the work/s as per the Technical Specifications, including cost of site arrangement, overheads, insurance, whatsoever, as stipulated in the bidding documents for the total scope of work/s and all applicable taxes, duties and levies for all transactions between us and our sub-contractors as well as for all transactions between us and POWERGRID. We understand that Owner shall not entertain any claim on account of any taxes, duties or other levies or any interest therein.
We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Goods, in and outside of India.
We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states from which we shall make our supply of goods.
We declare that items left blank in the Schedules will be deemed to have been included in other items. The total for each schedule and the total of grand summary shall be deemed to be the total price for executing the facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
BID PRICE:
We declare that our Total Bid Price for the entire scope of work specified in the bidding documents shall be as indicated in Summary Price Schedule. We further, declare that the prices stated in our proposal are in accordance with your Instructions to Bidders' included in Conditions of Contract, Volume-I of the bidding documents.
The prices and the price components of the various items are indicated in respective Price Schedules provided. Further, we also confirm that bid price is lump sum price for the complete scope of work as specified in the bidding documents and we confirm that no additional sum shall be payable, of whatsoever nature, provided the scope of work does not alter.
DEVIATIONS:
We declare that the Contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, all of which have been detailed out exhaustively in the following schedules, irrespective of whatever has been stated to the contrary anywhere else in our proposal.
Schedule of Commercial Deviations
Schedule of Cost of withdrawal of Deviations
Schedule of Technical Deviations
We confirm that specified stipulation of following critical clauses are acceptable to us and no deviations/exceptions are taken on any account whatsoever in the following clauses:
Bid Security/ Bid Guarantee
Terms of Payment
Contract Performance Guarantee/Performance Security
Liquidated Damages
Price & Price Basis
Guarantee & Defect Liability Period
Work schedule
In line with Clause 2.6 of Special Conditions of Contract, Volume I-A, we have declared the withdrawal price in Attachment – 5A for the deviations taken against the Clauses mentioned above and we undertake to execute the contract inline with the provisions of these clauses in case POWERGRID agree to bear the withdrawal cost.
Further, we agree that additional conditions, deviations, if any found in the proposal documents other than those stated in deviation Schedules, save that pertaining to any rebates offered, shall not be given effect to.
WORK SCHEDULE:
If this proposal is accepted by you, we agree to arrange site visit, submit Engineering data, provide services and complete the entire work from time to time in accordance with schedules indicated in the proposal. We fully understand that the time schedule stipulated in the proposal is the essence of the contract, if awarded. The completion schedule of the various major key phases of the Package is indicated.
CONTRACT PERFORMANCE GUARANTEE:
We further agree that if our proposal is accepted we shall provide an irrevocable Contract Performance Guarantee, within 28 days from LOA of value equivalent to three percent (03%) of the Contract Price valid upto the end of ninety (90) days after the end of the contract warranty period in the form of ......................................... (Please specify the form of Guarantee) ……………... in your favour and enter into a formal agreement with you within Twenty Eight (28) days from the date of issue of Letter of Award of Contract.
Information regarding Ex-employees of POWERGRID who had retired/resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us; any other information in addition to the information called for in the proposal sheets and checklist duly filled in is enclosed as per respective schedules/ attachments.
We hereby declare that only the persons or firms interested in this proposal as principal or principals are named herein and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if we are awarded the contract, that this proposal is made without any connection with any other person, firm or party like-wise submitting a proposal and that this proposal is in all respects for and in good faith, without collusion or fraud.
Printed Name :
Designation :
DESCRIPTION
Name of Zone
Name of Circle
Name of Division
Name of Substation/Grid
Type of Substation (AIS/GIS/HYBRID)
Nearest City/Landmark
Site Incharge/Co-ordinator
Mobile/Telephone No.
e-mail Address
Storage for Equipment at site (Space to be provided by OPTCL)
Space for Unloading at site (Space to be provided by OPTCL)
Access in S/S Control Room for Panel movement ( Control room Floor, Door size, staircase/Lifting hook)
Substation Drawings
Substation SLD including future planned bays
Substation switchyard Layout
Control room Layout
CRP Scheme drawings
LT system Scheme
Firefighting system
220VDCDB & Battery Charger
Availability of Air Conditioning System in Control Room ( Centralised/ Cassette/ Split AC
Availability of Air Conditioning System in Relay Room
Availability of Air Conditioning System in Tele Communication Room
Earth Conductor Type
Size of Earthing Conductor
Availibility of existing Earth Bar/Cable Near Proposed Panel location
Distance Existing Earth Bar/Cable
Distance New EarthPit Proposed location
Make and Model of SAS Gateways
Redundancy in SAS Gateways ( one or Two)
Data Transfer from these SAS gateways to any Remote Control Centers
Communication Protocol
Total no.of Ports available for Remote Communication in each Gateway
No.of Used ports for Remote Communication in each Gateway
No.of Spare Ports available for Remote Communication in each Gateway
Is Spare ports are configured for Remote Communication in each Gateway
Type of Spare Ports in each Gateway
Gateway Configuration file ( attach)
List of signals (BI/BO/AI) configured in SAS Gateway (attach Excel file)
Make and Model of RTU for Remote Operation, if any
Data Transfer from these RTU to any Remote Control Centers
Communication Protocol
Redundancy in RTU Gateways ( one or Two)
Total no.of Ports available for Remote Communication in each RTU
No.of Used ports for Remote Communication in each Gateway
No.of Spare Ports available for Remote Communication in each RTU
Is Spare ports are configured for Remote Communication in each RTU
Type of Spare Ports in each RTU
RTU Configuration file ( attach)
List of signals (BI/BO/AI) configured in RTU Gateway (attach Excel file)
Make and Model of GPS
Healthiness of GPS
Time Sync Protocol Supported
No.of Spare IRIG-B Ports
No.of Spare SNTP(Ethernnet) Ports
Healthiness of DVD unit (Digital Visual Display)
DESCRIPTION
Availability of space in existing CRP for mounting of CMR / Control Relay / TBs (Per Bay- CMR- 50 nos., Control Relay- 2 per CB, 2 per Iso, L/R Swicth- 1 per bay)
Check Sync Function used for Which Voltage Levels
No. of Bays Check Sync facility available/being used
Availabilty of Space for Installation of New Panels (2100X800X600). Attach Control room Layout with existing panels. Consider any plaaned panels earmarked for upcoming projects.
Availability of space for Cable Laying in existing trench
Requirement of Civil works for New Panel installation & cable Laying
Availability of space in existing CRP for mounting of MFT ( 1 per bay)
Space for Mounting of MFT on DIN RAIL (1 per bay)
Attach photos of each panel (Internal/Bottom Cable gland plate)
Feeder Name ( Line / ICT/Reactor etc)
Bay name with Voltage Level
Type (Static Relay/ Numerical Relays)
Camera make
Camera Number
Camera-1
Camera-2
Camera-3
Camera-4
Camera-5
Camera-6
DESCRIPTION
Type of Communication Link/Connectivity ( Substation to STAMS)
Communication provider (OPTCL/External agency)
Existing communication setup for SLDC ( Whether Same or separate equipment)
Existing communication setup for internal IT/SAP/Billing/Internet/Intranet
Spare Fibre core availability
Type of Telecom equipment
Technology Equipment
Existing Fiber Connectivity
Router Make/Model
Port Type
Telecom to Proposed Communication Panel distance
Cable Trenches or Cable Galleries (Available/Not available)
Distance of communication panels to Control room, if not located in same building
Spare communication ports available
DESCRIPTION
Protection/Control DC Nominal Voltage(s)
Communication (OPGW/PLCC) DC Nominal Voltage(s)
No.of Battery Chargers (Voltage vise)
Battery AH Rating
Battery AH Rating ____________VDC
Battery AH Rating ____________VDC
Battery AH Rating ____________VDC
Battery AH Rating ____________VDC
Existing DC Tranducer Battery Charger Current available?
Availability of Shunt for Battery Charger Tranducer (Rating……………… ohms,______Amps.)
Existing DC Tranducer Battery Bank Current Meas.
Availability of Shunt for Battery Bank Tranducer (Rating……………….)
Existing Spare Circuits Breakers (MCBs) in DCDB
Existing Space for new Circuits Breakers (MCB) IN DCDB
Existing DC Tranducer Battery Charger Current Meas
Availability of Shunt for Battery Charger Tranducer (Rating……………… ohms,______Amps.)
Existing DC Tranducer Battery Bank Current Meas.
Availability of Shunt for Battery Bank Tranducer (Rating……………….)
Existing Spare Circuits Breakers (MCBs)
Existing Space for new Circuits Breakers (MCB) Rating______, Nos.___________
Control Panel No.
Rating
Digital RTCC-1
DESCRIPTION
400KV (bays)
Total no.of Isolators
No.of Isolators Status Indication is available in Control Panel
No.of Isolators Operating from Control Panel
No. of Isolators in which Motorised Motor does not exists
No. of Isolators which could not be operated due to Cable issue but are motorised operated from local
No. of Isolators which are to be replaced.
No.of Isolators for which OEM support is required for operating from Control Room
Availability of Mechanical Interlock of Isolators
Total no.of Earth Switch
No.of Earth Switch Status Indication is available in Control Panel
Availability of Mechanical Interlock of Earth Switch
Total no.of Circuit Breakers
No.of Circuit Breakers Status Indication is available in Control Panel
No.of Circuit Breakers Operating from Control Panel
Voltage Level
Voltage Level
Voltage level
Voltage level
Status
Confirm the ACDB with facility of Dual source & bus Coupler, if not mention as requirement
Availability of required MCCB/MCB for field control AC Supply (mention the detail like number & rating)
Spare provision in the ACDB
Space availability for installation of main ACDB.
Volatge Level
Provide the requirement of Field ACDB cum BMK as one panel for 3 Bays ( 400KV)
Provide the requirement of Field ACDB cum BMK as one panel for 3 Bays ( 220KV)
Provide the requirement of Field ACDB cum BMK as one panel for 3 Bays ( 132KV)
Provide the requirement of Field ACDB cum BMK as one panel for 3 Bays ( 33KV)
Status
Confirm the DCDB with facility of Individual DC extension to each panel or not, if not mention as requirement or modify the system
Spare provision in the DCDB
Space availability for installation of main DCDB.
Bay name with Voltage Level
Panel No.
Proposed communication panel (Router, Switchtes, RAS Device, Gateway, etc to be delivered under project)
ACDB Panels
DCDB panel - 220 V
DCDB panel - 48V
DG Set
FF Room
FF Annunciation Panel
RTCC Panel 1
RTCC Panel 2
RTCC Panel …n
Control Panel 1 ( Name to be mentioned)
Control Panel 2 ( Name to be mentioned)
All control panels of each feeder (Voltage wise )
Relay Panel 1 ( Name to be mentioned)
All relay panels of each feeder (Voltage wise )
Camera location
Camera location
Exist and copied
Exist and copied
Exist and copied
Exist and copied
Exist and copied
Exist and copied
Fill-up the CT-VT Table
Requirement of civil work
Earthing point for panel Earthing
Whether control cable crossing power cable
Spare MCB for DC
Spare MCB for AC
FEEDER-2….................................................................
Signal Name
CB 3-PH OPENED / CLOSED
CB R-PH OPENED / CLOSED
CB Y-PH OPENED / CLOSED
CB B-PH OPENED / CLOSED
ISOLATOR OPENED / CLOSED
EARTH SWITCH OPENED / CLOSED
A/R IN AUTO / NONAUTO MODE
BCU IN LOCAL / REMOTE
I (R-PHASE)
I (Y-PHASE)
I (B-PHASE)
V (R-Y PHASE)
V (Y-B PHASE)
V (B-R PHASE)
FREQUENCY
ISOLATOR DC FAIL
ISOLATOR MOTOR FAULTY
ISOLATOR LOCAL/REMOTE
ISOLATOR AC FAIL
ISOLATOR PHASE DISCREPANCYY
CB MANUAL OPEN
CB MANUAL CLOSE
PD OPERATED
CB DC SUPPLY 1 FAIL
CB DC SUPPLY 2 FAIL
CB AC SUPPLY FAIL
CB SPRING DISCHARGE (As applicable)
CB LOW AIR PRESSURE (As applicable)
CB LOW HYDRAULIC PRESSURE (As applicable)
CB SF6 GAS PRESSURE FIRST STAGE LOW ALARM
CB SF6 LOCK OUT ALARM ( SECOND STAGE )
CB TC1 Faulty- R PH
CB TC1 Faulty- Y PH
CB TC1 Faulty- B PH
CB TC2 Faulty- R PH
CB TC2 Faulty- Y PH
CB TC2 Faulty- B PH
CB TROUBLE ALARM
CB MCB TRIPPED (Motor/Heating/Lighting)
CB INTERLOCK ENABLED
LBB PROTECTION OPERATED
CB OPERATION LOCKOUT
CB COMPRESSOR / PUMP ON (As applicable)
CONTROL SWITCH DEVICE BYPASSED
CONTROL SWITCH DEVICE TROUBLE
ISO INTERLOCK ENABLED
ES INTERLOCK ENABLED
MAIN-1 OPERATED
MAIN-1 ZONE1 TRIP
MAIN-1 ZONE2 TRIP
MAIN-1 ZONE3 TRIP
MAIN-1 REVERSE ZONE TRIP
MAIN-1 PSB DETECTED
MAIN-1 CVT FUSE FAILURE
MAIN-1 RELAY FAULTY
MAIN-1 DEF OPERATED
MAIN-1 SOTF OPERATED
MAIN-1 CARRIER SEND CH-1
MAIN-1 CARRIER SEND CH-2
MAIN-1 CARRIED RECD CH-1
MAIN-1 CARRIED RECD CH-2
MAIN-1 O/V STAGE-1 TRIP
MAIN-1 O/V STAGE-2 TRIP
MAIN-1 STUB PROTN OPERATED
MAIN-1 STUB_ENABLED
MAIN-1 CARRIER AIDED TRIP
MAIN-1 BROKEN CONDUCTOR ALARM
MAIN-1 A/R BLOCK
MAIN-1 CARRIER SWITCH IN OUT
MAIN-1 WEAK END INFEED OPTD.
MAIN-1 OVERVOLTAGE START
MAIN-2 OPERATED
MAIN-2 ZONE1 TRIP
MAIN-2 ZONE2 TRIP
MAIN-2 ZONE3 TRIP
MAIN-2 REVERSE ZONE TRIP
MAIN-2 PSB DETECTED
MAIN-2 CVT FUSE FAILURE
MAIN-2 RELAY FAULTY
MAIN-2 DEF OPERATED
MAIN-2 SOTF OPERATED
MAIN-2 CARRIER SEND CH-1
MAIN-2 CARRIER SEND CH-2
MAIN-2 CARRIED RECD CH-1
MAIN-2 CARRIED RECD CH-2
MAIN-2 O/V STAGE-1 TRIP
MAIN-2 O/V STAGE-2 TRIP
MAIN-2 STUB PROTN OPERATED
MAIN-2 STUB_ENABLED
MAIN-2 CARRIER AIDED TRIP
MAIN-2 BROKEN CONDUCTOR ALARM
MAIN-2 A/R BLOCK
MAIN-2 CARRIER SWITCH IN OUT
MAIN-2 WEAK END INFEED OPTD.
MAIN-2 OVERVOLTAGE START
DIRECT TRIP SEND CHANNEL 1
DIRECT RECEIVED CHANNEL 1
DIRECT TRIP SEND CHANNEL 2
DIRECT RECEIVED CHANNEL 2
CARRIER FAIL CH-1
CARRIER FAIL CH-2
DC SOURCE-1 FAIL
DC SOURCE-2 FAIL
A/R IN BLOCK MODE
AUTORECLOSE LOCKOUT
AUTORECLOSE OPERATED
AUTORECLOSE UNSUCCESFUL
CB NOT READY FOR A/R
CB IN LOCAL/REMOTE
MAIN-1 LINE DIFF PROT OPERATED
MAIN-1 LINE DIFF PROT OPERATED R-PH
MAIN-1 LINE DIFF PROT OPERATED Y-PH
MAIN-1 LINE DIFF PROT OPERATED B-PH
MAIN-1 LINE DIFF COMM FAIL LOCAL
MAIN-1 LINE DIFF COMM FAIL REMOTE
MAIN-1 LINE DIFF PROT BLOCKED
MAIN-1 DIFFERENTIATED RESTRAIN TRIP
MAIN-1 DIFFERENTIATED UNRESTRAIN TRIP
MAIN-1 DIFFERENTIAL RELAY UNHEALTHY
MAIN-2 LINE DIFF PROT OPERATED
MAIN-2 LINE DIFF PROT OPERATED R-PH
MAIN-2 LINE DIFF PROT OPERATED Y-PH
MAIN-2 LINE DIFF PROT OPERATED B-PH
MAIN-2 LINE DIFF COMM FAIL LOCAL
MAIN-2 LINE DIFF COMM FAIL REMOTE
MAIN-2 LINE DIFF PROT BLOCKED
MAIN-2 DIFFERENTIATED RESTRAIN TRIP
MAIN-2 DIFFERENTIATED UNRESTRAIN TRIP
MAIN-2 DIFFERENTIAL RELAY UNHEALTHY
AUXILIARY RELAY FAULTY
CT LOSS SF6 R PH
CT LOSS SF6 Y PH
CT LOSS SF6 B PH
CT SF6 PR LOCKOUT
df/dt OPERATION
SPS Operated
86A TRIP RELAY OPERATED
86B TRIP RELAY OPERATED
86A TRIP RELAY FAULTY
86B TRIP RELAY FAULTY
BCU UNHEALTHY
BCU TIME SYNC ERROR
MAIN-1 BB PU UNIT FAULTY
MAIN-2 BB PU UNIT FAULTY
MAIN-1 BB PROTECTION OPTD
MAIN-2 BB PROTECTION OPTD
RESET 96A TRIP RELAY
RESET 96B TRIP RELAY
CB 3-PH OPEN / CLOSE COMMAND
ISOLATOR OPEN / CLOSE COMMAND
A/R/IN AUTO/NONAUTO COMMAND
BYPASS CMD FOR CNTRL SWITCH DEVICE
RESET A/R LOCKOUT RELAY
RESET 86A TRIP RELAY
RESET 86B TRIP RELAY
FEEDER-2 : ….............................................
Signal Name
CB 3-PH OPENED / CLOSED
CB R-PH OPENED / CLOSED
CB Y-PH OPENED / CLOSED
CB B-PH OPENED / CLOSED
ISOLATOR OPENED / CLOSED
EARTH SWITCH OPENED / CLOSED
A/R IN AUTO / NONAUTO MODE
BCU IN LOCAL / REMOTE
I (R-PHASE)
I (Y-PHASE)
I (B-PHASE)
V (R-Y PHASE)
V (Y-B PHASE)
V (B-R PHASE)
FREQUENCY
ISOLATOR DC FAIL
ISOLATOR MOTOR FAULTY
ISOLATOR LOCAL/REMOTE
ISOLATOR AC FAIL
ISOLATOR PHASE DISCREPANCYY
CB MANUAL OPEN
CB MANUAL CLOSE
PD OPERATED
CB LOCAL/REMOTE
CB DC SUPPLY 1 FAIL
CB DC SUPPLY 2 FAIL
CB AC SUPPLY FAIL
CB SPRING DISCHARGE(As Applicable)
CB LOW AIR PRESSUREAs Applicable)
CB LOW HYDRAULIC PRESSURE(As Applicable)
CB SF6 GAS PRESSURE FIRST STAGE LOW ALARM
CB SF6 LOCK OUT ALARM ( SECOND STAGE )
CB TC1 Faulty- R PH
CB TC1 Faulty- Y PH
CB TC1 Faulty- B PH
CB TC2 Faulty- R PH
CB TC2 Faulty- Y PH
CB TC2 Faulty- B PH
CB TROUBLE ALARM
CB MCB TRIPPED (Motor/Heating/Lighting)
CB INTERLOCK ENABLED
LBB PROTECTION OPERATED
CB OPERATION LOCKOUT
CB COMPRESSOR / PUMP ON (As Applicable)
CONTROL SWITCH DEVICE BYPASSED
CONTROL SWITCH DEVICE TROUBLE
ISO INTERLOCK ENABLED
ES INTERLOCK ENABLED
A/R IN BLOCK MODE
AUTORECLOSE LOCKOUT
AUTORECLOSE OPERATED
AUTORECLOSE UNSUCCESFUL
CB NOT READY FOR A/R
CT LOSS SF6 R PH
CT LOSS SF6 Y PH
CT LOSS SF6 B PH
CT SF6 PR LOCKOUT
MAIN-1 BB PU UNIT FAULTY
MAIN-2 BB PU UNIT FAULTY
MAIN-1 BB PROTECTION OPTD
MAIN-2 BB PROTECTION OPTD
86A TRIP RELAY OPERATED
86B TRIP RELAY OPERATED
86A TRIP RELAY FAULTY
86B TRIP RELAY FAULTY
AUXILIARY RELAY FAULTY
BCU UNHEALTHY
BCU TIME SYNC ERROR
CB 3-PH OPEN / CLOSE COMMAND
ISOLATOR OPEN / CLOSE COMMAND
A/R/IN AUTO/NONAUTO COMMAND
BYPASS CMD FOR CNTRL SWITCH DEVICE
CB CHECK SYNC BYPASS COMMAND
RESET A/R LOCKOUT RELAY
RESET 86A TRIP RELAY
RESET 86B TRIP RELAY
RESET 96A TRIP RELAY
RESET 96B TRIP RELAY
Signal Name
CB 3-PH OPENED / CLOSED
CB R-PH OPENED / CLOSED
CB Y-PH OPENED / CLOSED
CB B-PH OPENED / CLOSED
ISOLATOR OPENED / CLOSED
EARTH SWITCH OPENED / CLOSED
BCU IN LOCAL / REMOTE
I (R-PHASE)
I (Y-PHASE)
I (B-PHASE)
V (R-Y PHASE)
V (Y-B PHASE)
V (B-R PHASE)
FREQUENCY
HVWTI TEMP
IVWTI TEMP
LVWTI TEMP
OTI TEMP
TAP POSITION
DGA MOISTURE VALUE
DGA H2 VALUE
DGA C2H2 VALUE
DGA CO VALUE
DGA CO2 VALUE
DGA CH4 VALUE
DGA C2H6 VALUE
DGA C2H4 VALUE
DGA N2 VALUE
ISOLATOR DC FAIL
ISOLATOR MOTOR FAULTY
ISOLATOR LOCAL/REMOTE
ISOLATOR AC FAIL
ISOLATOR PHASE DISCREPANCYY
CB LOCAL/REMOTE
CB MANUAL OPEN
CB MANUAL CLOSE
PD OPERATED
CB DC SUPPLY 1 FAIL
CB DC SUPPLY 2 FAIL
CB AC SUPPLY FAIL
CB SPRING DISCHARGE (as applicable)
CB LOW AIR PRESSURE (as applicable)
CB LOW HYDRAULIC PRESSURE (as applicable)
CB SF6 GAS PRESSURE FIRST STAGE LOW ALARM
CB SF6 LOCK OUT ALARM ( SECOND STAGE )
CB TC1 Faulty- R PH
CB TC1 Faulty- Y PH
CB TC1 Faulty- B PH
CB TC2 Faulty- R PH
CB TC2 Faulty- Y PH
CB TC2 Faulty- B PH
CB TROUBLE ALARM
CB MCB TRIPPED (Motor/Heating/Lighting)
CB INTERLOCK ENABLED
LBB PROTECTION OPERATED
CB OPERATION LOCKOUT
CB COMPRESSOR / PUMP ON (as applicable)
CONTROL SWITCH DEVICE BYPASSED
CONTROL SWITCH DEVICE TROUBLE
ISO INTERLOCK ENABLED
ES INTERLOCK ENABLED
CT LOSS SF6 R PH
CT LOSS SF6 Y PH
CT LOSS SF6 B PH
CT SF6 PR LOCKOUT
LOW OIL LEVEL ALARM
BUCHHOLZ ALARM
BUCHHOLZ TRIP
OTI ALARM
OTI TRIP
WTI ALARM-HV
WTI ALARM-IV
WTI ALARM-LV
WTI TRIP
PRV-1 TRIP
PRV-2 TRIP
SUDDEN PRESSURE RELAY TRIP
OSR-1 Trip
OSR-2 Trip
FIRE IN REACTOR/ICT
DELUGE VALVE OPTD
DC SOURCE-1 FAIL
DC SOURCE-2 FAIL
SHUT OFF VALVE OPERATED
OLTC PRV TRIP OPTD
OLTC OIL LEVEL ALARM
OLTC DRIVE MOTOR FAULTY
DIRECT WDG TEMP MONITORING TRIP
FANS FAIL TO START BANK A
FANS FAIL TO START BANK B
PUMPS FAIL TO START BANK A
PUMPS FAIL TO START BANK B
OIL FLOW LOW ALARM BANK
BACKUP IMPEDANCE TRIP Z1
BACKUP IMPEDANCE TRIP Z2
BACKUP IMPEDANCE TRIP Z3
BACKUP IMPEDANCE TRIP Z4
POWER SWING BLOCKING
HV - BACKUP O/C OPTD
HV - BACKUP E/F OPTD
LV - BACKUP O/C OPTD
LV - BACKUP E/F OPTD
LV - OVERFLUX ALARM
LV - OVERFLUX OPTD
HV-OVERFLUX ALARM
HV OVERFLUX TRIP
NEUTRAL O/C PROTECTION OPTD
NEUTRAL O/C RELAY UNHEALTHY
COMMON THERMAL O/L ALARM
COMMON THERMAL O/L TRIP
INTERTRIP OPTD.
BACKUP O/C E/F RELAY UNHEALTHY HV
BACKUP O/C E/F RELAY UNHEALTHY LV
REF OPERATED
REF BLOCK
DIFFERENTIAL RELAY OPTD.
BACKUP IMPEDANCE OPTD
DIFF RELAY UNHEALTHY
REF RELAY UNHEALTHY
BACKUP IMPEDANCE RELAY UNHEALTHY
AUXILIARY RELAY FAULTY
MAIN-1 BB PU UNIT FAULTY
MAIN-2 BB PU UNIT FAULTY
MAIN-1 BB PROTECTION OPTD
MAIN-2 BB PROTECTION OPTD
86A TRIP RELAY OPERATED
86B TRIP RELAY OPERATED
86A TRIP RELAY FAULTY
86B TRIP RELAY FAULTY
BCU UNHEALTHY
BCU TIME SYNC ERROR
CB 3-PH OPEN / CLOSE COMMAND
ISOLATOR OPEN / CLOSE COMMAND
BYPASS CMD FOR CNTRL SWITCH DEVICE
RESET 86A TRIP RELAY
RESET 86B TRIP RELAY
RESET 96A TRIP RELAY
RESET 96B TRIP RELAY
Bus Reactor-2 :…....................................
Signal Name
I (R-PHASE)
I (Y-PHASE)
I (B-PHASE)
V (R-Y PHASE)
V (Y-B PHASE)
V (B-R PHASE)
FREQUENCY
WTI TEMP
OTI TEMP
DGA MOISTURE VALUE
DGA H2 VALUE
DGA C2H2 VALUE
DGA CO VALUE
DGA CO2 VALUE
DGA CH4 VALUE
DGA C2H6 VALUE
DGA C2H4 VALUE
DGA N2 VALUE
CB 3-PH OPENED / CLOSED
CB R-PH OPENED / CLOSED
CB Y-PH OPENED / CLOSED
CB B-PH OPENED / CLOSED
ISOLATOR OPENED / CLOSED
EARTH SWITCH OPENED / CLOSED
BCU IN LOCAL / REMOTE
CB LOCAL/REMOTE
CB MANUAL OPEN
CB MANUAL CLOSE
PD OPERATED
CB DC SUPPLY 1 FAIL
CB DC SUPPLY 2 FAIL
CB AC SUPPLY FAIL
CB SPRING DISCHARGE(As applicable)
CB LOW AIR PRESSURE(As applicable)
CB LOW HYDRAULIC PRESSURE(As applicable)
CB SF6 GAS PRESSURE FIRST STAGE LOW ALARM
CB SF6 LOCK OUT ALARM ( SECOND STAGE )
CB TC1 Faulty- R PH
CB TC1 Faulty- Y PH
CB TC1 Faulty- B PH
CB TC2 Faulty- R PH
CB TC2 Faulty- Y PH
CB TC2 Faulty- B PH
CB TROUBLE ALARM
CB MCB TRIPPED (Motor/Heating/Lighting)
CB INTERLOCK ENABLED
LBB PROTECTION OPERATED
CB OPERATION LOCKOUT
CB COMPRESSOR / PUMP ON(As applicable)
CONTROL SWITCH DEVICE BYPASSED
CONTROL SWITCH DEVICE TROUBLE
ISO INTERLOCK ENABLED
ES INTERLOCK ENABLED
CT LOSS SF6 R PH
CT LOSS SF6 Y PH
CT LOSS SF6 B PH
CT SF6 PR LOCKOUT
df/dt OPERATION
SPS Operated
86A TRIP RELAY OPERATED
86B TRIP RELAY OPERATED
86A TRIP RELAY FAULTY
86B TRIP RELAY FAULTY
AUXILIARY RELAY FAULTY
BCU UNHEALTHY
BCU TIME SYNC ERROR
LOW OIL LEVEL ALARM
BUCHHOLZ ALARM
BUCHHOLZ TRIP
OTI ALARM
OTI TRIP
WTI ALARM-HV
WTI ALARM-IV
WTI ALARM-LV
WTI TRIP
PRV-1 TRIP
PRV-2 TRIP
SUDDEN PRESSURE RELAY TRIP
OSR-1 Trip
OSR-2 Trip
FIRE IN REACTOR/ICT
DELUGE VALVE OPTD
DC SOURCE-1 FAIL
DC SOURCE-2 FAIL
SHUT OFF VALVE OPERATED
REACTOR COOLING SYSTEM TROUBLE
REF OPERATED
REF BLOCK
DIFFERENTIAL RELAY OPTD.
BACKUP IMPEDANCE OPTD
DIFF RELAY UNHEALTHY
MAIN-1 BB PU UNIT FAULTY
MAIN-2 BB PU UNIT FAULTY
MAIN-1 BB PROTECTION OPTD
MAIN-2 BB PROTECTION OPTD
REF RELAY UNHEALTHY
BACKUP IMPEDANCE RELAY UNHEALTHY
TEED PROTECTION OPTD
TEED RELAY FAULTY
CB 3-PH OPEN / CLOSE COMMAND
ISOLATOR OPEN / CLOSE COMMAND
BYPASS CMD FOR CNTRL SWITCH DEVICE
RESET 86A TRIP RELAY
RESET 86B TRIP RELAY
RESET 96A TRIP RELAY
RESET 96B TRIP RELAY
Signal Name
M1 BB Z1 OPERATED
M2 BB Z1 OPERATED
M1 BB Z2 OPERATED
M2 BB Z2 OPERATED
M1 BB Z1 OUT OF SERVICE
M2 BB Z1 OUT OF SERVICE
M1 BB Z2 OUT OF SERVICE
M2 BB Z2 OUT OF SERVICE
Main-1 BB RELAY HEALTHY
Main-2 BB RELAY HEALTHY
M1 BB Z1 BLOCK (Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M2 BB Z1 BLOCK (Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M1 BB Z2 BLOCK (Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M2 BB Z2 BLOCK (Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M1 BB Z1 CT TROUBLE
M2 BB Z1 CT TROUBLE
M1 BB Z2 CT TROUBLE
M2 BB Z2 CT TROUBLE
MAIN-1 ZONE X AND ZONE Y MERGED/INTERCONNECTED
MAIN-2 ZONE X AND ZONE Y MERGED/INTERCONNECTED
VOLTAGE R-Y PHASE (BUS-1)
VOLTAGE Y-B PHASE (BUS-1)
VOLTAGE B-R PHASE (BUS-1)
FREQUENCY (BUS-1)
VOLTAGE R-Y PHASE (BUS-2)
VOLTAGE Y-B PHASE (BUS-2)
VOLTAGE B-R PHASE (BUS-2)
FREQUENCY (BUS-2)
Signal Name
ACDB INCOMER-1 OPEN/CLOSE
ACDB BUS COUPLER OPEN/CLOSE
ACDB INCOMER-2 OPEN/CLOSE
MSB-1 CB OPEN/CLOSE
MSB-2 CB OPEN/CLOSE
MSB BUS COUPLER BREAKER OPEN/CLOSE
TERTIARY-EARTH SWITCH OPEN/CLOSE
TERTIARY-CB OPEN /CLOSE
TERTIARY-ISO OPEN /CLOSE
DG SET BREAKER OPEN/CLOSE
220V BATTERY CHARGER -1 ON FLOAT/BOOST MODE
220V BATTERY CHARGER -2 ON FLOAT/BOOST MODE
48V BATTERY CHARGER -1 ON FLOAT/BOOST MODE
48V BATTERY CHARGER -2 ON FLOAT/BOOST MODE
HVW ELECTRIC PUMP ACB ON /OFF
SUBSTATION IN LOCAL/REMOTE
MSB-1 VOLTAGE (R-Y PHASE)
MSB-1 VOLTAGE (Y-B PHASE)
MSB-1 VOLTAGE (B-R PHASE)
MSB-1 CURRENT (R-PHASE)
MSB-1 CURRENT (Y-PHASE)
MSB-1 CURRENT (B-PHASE)
MSB-1 ACTIVE POWER(KW)
MSB-1 REACTIVE POWER(KVAR)
MSB-2 VOLTAGE (R-Y PHASE)
MSB-2 VOLTAGE (Y-B PHASE)
MSB-2 VOLTAGE (B-R PHASE)
MSB-2 CURRENT (R-PHASE)
MSB-2 CURRENT (Y-PHASE)
MSB-2 CURRENT (B-PHASE)
MSB-2 ACTIVE POWER(KW)
MSB-2 REACTIVE POWER(KVAR)
ACTIVE POWER(KW)
REACTIVE POWER(KVAR)
VOLTAGE (R-Y PHASE)
VOLTAGE (Y-B PHASE)
VOLTAGE (B-R PHASE)
CURRENT (R-PHASE)
CURRENT (Y-PHASE)
CURRENT (B-PHASE)
220V DCDB -1 VOLTAGE
220V BATTERY SET-1 CURRENT
220V DCDB -2 VOLTAGE
220V BATTERY SET-2 CURRENT
48V DCDB -1 VOLTAGE
48V BATTERY SET-1 CURRENT
48V DCDB -2 VOLTAGE
48V BATTERY SET-2 CURRENT
220V BATTERY CHARGER-1 CURRENT
220V BATTERY CHARGER-2 CURRENT
48V BATTERY CHARGER-1 CURRENT
48V BATTERY CHARGER-2 CURRENT
FIRE FIGHTING PRESSURE MONITORING
CONTROL ROOM TEMPRATURE
BATTERY ROOM TEMPRATURE
AMBIENT TEMPERATURE OUTDOOR
AMBIENT RELATIVE HUMIDITY OUTDOOR
ACDB INCOMER-1 U/V PROTN. RLY OPTD
ACDB INCOMER-2 U/V PROTN. RLY OPTD
ACDB BC SUPERVISION OF CONTROL SUPPLY
AUX. TRAFO-1 BUCHHOLZ ALARM
AUX. TRAFO-1 WTI ALARM
AUX. TRAFO-1 OTI ALARM
AUX. TRAFO-1 BUCHHOLZ TRIP
AUX. TRAFO-1 WTI TRIP
AUX. TRAFO-1 OTI TRIP
I/C-1 O/C PROTECTION RELAY TRIP
I/C-1 E/F PROTECTION RELAY TRIP
MSB BUS-1 U/V OPTD
MSB-1 PHASE SEQUENCE NEGATIVE ALARM
AUX. TRAFO-2 BUCHHOLZ ALARM
AUX. TRAFO-2 WTI ALARM
AUX. TRAFO-2 OTI ALARM
AUX. TRAFO-2 BUCHHOLZ TRIP
AUX. TRAFO-2 WTI TRIP
AUX. TRAFO-2 OTI TRIP
I/C-2 O/C PROTECTION RELAY TRIP
I/C-2 E/F PROTECTION RELAY TRIP
MSB BUS-2 U/V OPTD
MSB-2 PHASE SEQUENCE NEGATIVE ALARM
MSB_BC SUPERVISION OF CONTROL SUPPLY
TERTIARY-CB INTERLOCK ENABLED
TERTIARY-ISO INTERLOCK ENABLED
TERTIARY-CB TRIPPED ON PROTN
ALTERNATOR ON
CHARGER 1 ON
CHARGER 2 ON
ENGINE OVERHEATING
HIGH COOLING WATER TEMP.
LOW OIL PRESSURE TRIP
DG SET FAILED TO START IN 30 SEC
LACK OF FUEL
LOW LEVEL IN DAILY SERVICE FUEL TANK
HIGH SPEED DIESEL TANK LEVEL LOW
OVERSPEED TRIP
DG I/C PROTN OPTD(ALT FAULT,DIFF ETC)
CONTROL SUPPLY FAIL
DG PROTECTION OPERATED (O/C, E/F, DIFF.)
DG PROTECTION U/V OPERATED
AMF PANEL REMOTE SWITCH INDICATION
DG OVERLOAD
PHASE SEQUENCE NEGATIVE ALARM
ALTERNATOR FAULT
220V DCDB -1 EARTH FAULT
220V DCDB -2 EARTH FAULT
220V BATTERY CHARGER-1 TROUBLE
220V BATTERY CHARGER-2 TROUBLE
48V BATTERY CHARGER-1 TROUBLE
48V BATTERY CHARGER-2 TROUBLE
ELECTRIC MOTOR FIRE WATER PUMP RUNNING
ELECTRIC MOTOR FIRE WATER PUMP FAILS TO START
ELECTRIC PUMP IN AUTO MODE
EPUMP CONTROL SUPPLY FAIL
DIESEL ENGINE FIRE WATER PUMP FAILS TO START
DIESEL ENGINE FIRE WATER PUMP RUNNING
DIESEL ENGINE PUMP IN AUTO MODE
DIESEL ENGINE BATTERY CHARGER-1 ON
DIESEL ENGINE BATTERY CHARGER-2 ON
DIESEL ENGINE FUEL LEVEL LOW
DPUMP CONTROL SUPPLY FAIL
DIESEL PUMP OVER SPEED TRIP
DIESEL PUMP LOW OIL PRESSURE TRIP
DIESEL ENGINE HIGH TEMPERATURE ALARM
CONTROL ROOM ZONE-1 FIRE DETECTED
CONTROL ROOM ZONE-2 FIRE DETECTED
CONTROL ROOM ZONE-3 FIRE DETECTED
CONTROL ROOM ZONE-4 FIRE DETECTED
765KV KIOSK-1 FIRE DETECTED
400kV KIOSK-1 FIRE DETECTED
WATER STORAGE TANK-1 WATER LEVEL LOW
WATER STORAGE TANK-2 WATER LEVEL LOW
FIRE FIGHTING TANK HEADER PRESSURE LEVEL LOW
FIRE ANNAUNCIATION PANEL FAULTY
COMMON FIRE ALARM
JOCKEY PUMP-1 RUNNING
JOCKEY PUMP-1 FAILS TO START
JPUMP-1 SUPERVISION OF CONTROL SUPPLY
JOCKEY PUMP-2 RUNNING
JOCKEY PUMP-2 FAILS TO START
JPUMP-2 SUPERVISION OF CONTROL SUPPLY
TIME SYNCH. SIGNAL ABSENT
EFS SWITCH STATUS (applicable for all switches)
EFS SWITCH DC FAIL
Panel AC Supply Fail(applicable for all Panels)
BMK AC Fail (applicable for all BMK)
220V BATTERY CHARGER -1 TO FLOAT MODE
220V BATTERY CHARGER -1 TO BOOST MODE
220V BATTERY CHARGER -2 TO FLOAT MODE
220V BATTERY CHARGER -2 TO BOOST MODE
BAY NUM.
Device
ISOLATOR
Isolator
Isolator
Isolator
Earth Switch
Earth Switch
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Main-1 Distance
Busbar Relay
Busbar Relay
Busbar Relay
Busbar Relay
Master Trip
Master Trip
Master Trip
Master Trip
Master Trip
Master Trip
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Line Differential Relay
Reactor
Reactor Differential
Backup Impedance
Backup Impedance
Backup Impedance
Buchholz
Buchholz
Fire Protection
Fire Protection
Fire Protection
TEED Protection
TEED Protection
Busbar Relay
Busbar Relay
Busbar Relay
Busbar Relay
Master Trip
Master Trip
Master Trip
Master Trip
Master Trip
Master Trip
ICT (Primary)
Differential
Overflux
Overflux
Backup O/C and E/F
Backup O/C and E/F
Backup O/C and E/F
Backup O/C and E/F
Busbar Relay
Busbar Relay
Busbar Relay
Busbar Relay
Buchholz
Buchholz
Cooling System
Cooling System
Cooling System
Cooling System
Cooling System
Fire Protection
Fire Protection
Fire Protection
Neutral O/C
Neutral O/C
Backup Impedance
Backup Impedance
Backup Impedance
Backup Impedance
Backup Impedance
Backup Impedance
Backup Impedance
Busbar Relay
Busbar Relay
Busbar Relay
Busbar Relay
Master Trip
Master Trip
Master Trip
Master Trip
Master Trip
Master Trip
ICT (Secondary)
Overflux
Backup O/C and E/F
Backup O/C and E/F
Backup O/C and E/F
Master Trip
Master Trip
Master Trip
Master Trip
Busbar Relay
Busbar Relay
Busbar Relay
Busbar Relay
Bus Bar
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
GIS Bay additional Signals
BCHRG & DCDB
BATCHRG220V-1
BATCHRG220V-2
BATCHRG220V-2
BATCHRG48V-1
BATCHRG48V-1
BATCHRG48V-2
BATCHRG48V-2
220V_DCDB-1
220V_DCDB-2
BATCHRG220V-1
BATCHRG220V-2
BATCHRG48V-1
BATCHRG48V-2
DGSET
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
DGSET-1
LTSUP
ACDB-BC
ACDB-BC
ACDB-BC
MSB_BC
MSB_BC
MSB_BC
TERTIARY
TERTIARY
TERTIARY
TERTIARY
TERTIARY
TERTIARY
TERTIARY
TERTIARY
TERTIARY
EPUMP
EPUMP
EPUMP
EPUMP
EPUMP
EPUMP
EPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
DPUMP
SMOKE ALARM
SMOKE ALARM
SMOKE ALARM
SMOKE ALARM
SMOKE ALARM
SMOKE ALARM
FIREPROTN
FIREPROTN
FIREPROTN
FIREPROTN
FIREPROTN
FIREPROTN
JPUMP-1
JPUMP-1
JPUMP-1
JPUMP-2
JPUMP-2
JPUMP-2
SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
AUX_SYSTEM
COMMON
AIRCON
F_KIOSK_1
GATEWAY
LOCAL_HMI
LOCAL_HMI
BAY NO
Description
ASDU Common Address
Common Address Size of ASDU
Information object Address Structure
Frame Max Length
MV Periodic Cycle
Binary Time Stamp Size
T0: Connection Time Out
T1: APDU Time Out
T2: Acknowledge Time Out
T3: Test Frame Time Out
K: Send Acknowledgement Frames (APDU)
W: Acknowledgement Received Frame (APDU)
Time Synchronisation
Cause of Transmission
Discription
Debouncing Time
Filtering Delay
Discription ES TO BE TAKEN AS SIGNAL ALSO
Circuit Breaker (ON/OFF)
Circuit breaker (Check synch bypass)
Isolator
Trip Relay & L/O Relays reset
Control Switching Device (CSD) BYPASS COMMAND & Status
Fire fighting tank Water level, Manual Open/Close status (One SPS for each level)
Auto/Manual, Local/Remote
Description
Analog
Description
Single Point Status (SPS)
Double Point Status (DPS)
Measurement Value (MV) or Analog Value (AI)
Double Point Control (DPC)
Single Point Control (SPC)
ISOLATOR SIGNALS
SIGNAL NAME
CB 3-PH OPENED / CLOSED
CB R-PH OPENED / CLOSED
CB Y-PH OPENED / CLOSED
CB B-PH OPENED / CLOSED
CB MANUAL OPEN
CB MANUAL CLOSE
PD OPERATED
CB DC SUPPLY 1 FAIL
CB DC SUPPLY 2 FAIL
CB AC SUPPLY FAIL
CB SPRING DISCHARGE (As applicable)
CB LOW AIR PRESSURE (As applicable)
CB LOW HYDRAULIC PRESSURE (As applicable)
CB SF6 GAS PRESSURE FIRST STAGE LOW ALARM
CB SF6 LOCK OUT ALARM ( SECOND STAGE )
CB TC1 Faulty- R PH
CB TC1 Faulty- Y PH
CB TC1 Faulty- B PH
CB TC2 Faulty- R PH
CB TC2 Faulty- Y PH
CB TC2 Faulty- B PH
CB TROUBLE ALARM
CB MCB TRIPPED (Motor/Heating/Lighting)
CB INTERLOCK ENABLED
CB OPERATION LOCKOUT
CB COMPRESSOR / PUMP ON (As applicable)
CONTROL SWITCH DEVICE BYPASSED
CONTROL SWITCH DEVICE TROUBLE
CB IN LOCAL/REMOTE
LINE DIFFERENTIAL PROTECTION SIGNALS (NO LINE DIFFERENTIAL) - Not applicable but provision considered.
SIGNAL NAME
MAIN-1 OPERATED
MAIN-1 ZONE1 TRIP
MAIN-1 ZONE2 TRIP
MAIN-1 ZONE3 TRIP
MAIN-1 REVERSE ZONE TRIP
MAIN-1 PSB DETECTED
MAIN-1 CVT FUSE FAILURE
MAIN-1 RELAY FAULTY
MAIN-1 DEF OPERATED
MAIN-1 SOTF OPERATED
MAIN-1 CARRIER SEND CH-1
MAIN-1 CARRIER SEND CH-2
MAIN-1 CARRIED RECD CH-1
MAIN-1 CARRIED RECD CH-2
MAIN-1 O/V STAGE-1 TRIP
MAIN-1 O/V STAGE-2 TRIP
MAIN-1 STUB PROTN OPERATED
MAIN-1 STUB_ENABLED
MAIN-1 CARRIER AIDED TRIP
MAIN-1 BROKEN CONDUCTOR ALARM
MAIN-1 A/R BLOCK
MAIN-1 CARRIER SWITCH IN OUT
MAIN-1 WEAK END INFEED OPTD.
MAIN-1 OVERVOLTAGE START
LBB PROTECTION OPTD
DIRECT TRIP SEND CHANNEL 1
DIRECT RECEIVED CHANNEL 1
DIRECT TRIP SEND CHANNEL 2
DIRECT RECEIVED CHANNEL 2
CARRIER FAIL CH-1
CARRIER FAIL CH-2
DC SOURCE-1 FAIL
DC SOURCE-2 FAIL
Auxiliary Relay Faulty (applicable for all type of relays exists as per site condition)
CT LOSS SF6 B PH
CT SF6 PR LOCKOUT
SIGNAL NAME
A/R IN AUTO / NONAUTO MODE
A/R IN BLOCK MODE
AUTORECLOSE LOCKOUT
AUTORECLOSE OPERATED
AUTORECLOSE UNSUCCESFUL
CB NOT READY FOR A/R
SIGNAL NAME
A/R/IN AUTO/NONAUTO COMMAND
RESET A/R LOCKOUT RELAY
ICT/REACTOR PROTECTION SIGNALS
SIGNAL NAME
LOW OIL LEVEL ALARM
BUCHHOLZ ALARM
BUCHHOLZ TRIP
OTI ALARM
OTI TRIP
WTI ALARM (HV)
WTI ALARM (IV)
WTI ALARM (LV)
WTI TRIP
PRV-1 TRIP
PRV-2 TRIP
SUDDEN PRESSURE RELAY TRIP
OSR-1 Trip
OSR-2 Trip
FIRE IN REACTOR/ICT
DELUGE VALVE OPTD
DC SOURCE-1 FAIL
DC SOURCE-2 FAIL
SHUT OFF VALVE OPERATED
OLTC PRV TRIP OPTD
OLTC OIL LEVEL ALARM
OLTC DRIVE MOTOR FAULTY
DIRECT WDG TEMP MONITORING TRIP
FANS FAIL TO START BANK A
FANS FAIL TO START BANK B
PUMPS FAIL TO START BANK A
PUMPS FAIL TO START BANK B
OIL FLOW LOW ALARM BANK
REACTOR COOLING SYSTEM TROUBLE
DGA C2H6 VALUE
DGA C2H4 VALUE
DGA N2 VALUE
BUS BAR PERIPHERAL UNITS- BAY WISE
SIGNAL NAME
M1 BB Z1 OPERATED
M2 BB Z1 OPERATED
M1 BB Z2 OPERATED
M2 BB Z2 OPERATED
M1 BB Z1 OUT OF SERVICE
M2 BB Z1 OUT OF SERVICE
M1 BB Z2 OUT OF SERVICE
M2 BB Z2 OUT OF SERVICE
Main-1 BB RELAY HEALTHY
Main-2 BB RELAY HEALTHY
M1 BB Z1 BLOCK (Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M2 BB Z1 BLOCK(Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M1 BB Z2 BLOCK(Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M2 BB Z2 BLOCK(Circuitry fault, out of service, fibrecom and any other conditions etc to be grouped)
M1 BB Z1 CT TROUBLE
M2 BB Z1 CT TROUBLE
M1 BB Z2 CT TROUBLE
M2 BB Z2 CT TROUBLE
MAIN-1 ZONE X AND ZONE Y MERGED/INTERCONNECTED
MAIN-2 ZONE X AND ZONE Y MERGED/INTERCONNECTED
VOLTAGE R-Y PHASE
VOLTAGE Y-B PHASE
VOLTAGE B-R PHASE
FREQUENCY
DG SET SIGNALS
SIGNAL NAME
ACDB INCOMER-1 OPEN/CLOSE
ACDB INCOMER-1 U/V PROTN. RLY OPTD
ACDB BUS COUPLER OPEN/CLOSE
ACDB BC SUPERVISION OF CONTROL SUPPLY
MSB-1 CB OPEN/CLOSE
AUX. TRAFO-1 BUCHHOLZ ALARM
AUX. TRAFO-1 WTI ALARM
AUX. TRAFO-1 OTI ALARM
AUX. TRAFO-1 BUCHHOLZ TRIP
AUX. TRAFO-1 WTI TRIP
AUX. TRAFO-1 OTI TRIP
I/C-1 O/C PROTECTION RELAY TRIP
I/C-1 E/F PROTECTION RELAY TRIP
MSB BUS-1 U/V OPTD
MSB-1 PHASE SEQUENCE NEGATIVE ALARM
MSB-1 VOLTAGE (R-Y PHASE)
MSB-1 VOLTAGE (Y-B PHASE)
MSB-1 VOLTAGE (B-R PHASE)
MSB-1 CURRENT (R-PHASE)
MSB-1 CURRENT (Y-PHASE)
MSB-1 CURRENT (B-PHASE)
MSB-1 ACTIVE POWER(KW)
MSB-1 REACTIVE POWER(KVAR)
MSB BUS COUPLER BREAKER OPEN/CLOSE
MSB_BC SUPERVISION OF CONTROL SUPPLY
TERTIARY-EARTH SWITCH OPEN/CLOSE
TERTIARY-CB OPEN /CLOSE
TERTIARY-ISO OPEN /CLOSE
TERTIARY-CB INTERLOCK ENABLED
TERTIARY-ISO INTERLOCK ENABLED
TERTIARY-CB TRIPPED ON PROTN
EFS SWITCH STATUS (applicable for all switches)
EFS SWITCH DC FAIL
Panel AC Supply Fail(applicable for all Panels)
BMK AC Fail (applicable for all BMK)
220V BATTERY CHARGER -2 ON FLOAT/BOOST MODE
48V BATTERY CHARGER -1 ON FLOAT/BOOST MODE
48V BATTERY CHARGER -2 ON FLOAT/BOOST MODE
220V DCDB -1 EARTH FAULT
220V DCDB -2 EARTH FAULT
ACDB INCOMER-1 OPEN/CLOSE COMMAND
ACDB BC OPEN/CLOSE COMMAND
MSB INCOMER-1 OPEN/CLOSE COMMAND
MSB BC OPEN/CLOSE COMMAND
TERTIARY-CB OPEN /CLOSE COMMAND
TERTIARY-ISO OPEN /CLOSE COMMAND
48V DCDB -1 VOLTAGE
48V BATTERY SET-1 CURRENT
48V DCDB -2 VOLTAGE
48V BATTERY SET-2 CURRENT
220V BATTERY CHARGER-1 CURRENT
220V BATTERY CHARGER-2 CURRENT
48V BATTERY CHARGER-1 CURRENT
48V BATTERY CHARGER-2 CURRENT
220V BATTERY CHARGER -1 TO FLOAT MODE
220V BATTERY CHARGER -1 TO BOOST MODE
220V BATTERY CHARGER -2 TO FLOAT MODE
220V BATTERY CHARGER -2 TO BOOST MODE
Differential Relay
BAY NO
52BBR-RPh
52BBR-YPh
52BBR-Bph
MASTER TRIP RST
BAY NO
BAY NUM.
BUS-X VT
BUS-X VT
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
BAY NUM.
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
BAY NUM.
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
Description
ASDU Common Address
Common Address Size of ASDU
Information object Address Structure
Frame Max Length
MV Periodic Cycle
Binary Time Stamp Size
T0: Connection Time Out
T1: APDU Time Out
T2: Acknowledge Time Out
T3: Test Frame Time Out
K: Send Acknowledgement Frames (APDU)
W: Acknowledgement Received Frame (APDU)
Time Synchronisation
Cause of Transmission
Discription
Debouncing Time
Filtering Delay
Discription
Circuit Breaker (ON/OFF)
Circuit breaker (Check synch bypass)
Isolator
Tap Changer status & RAISE/LOWER control command
Trip Relay & L/O Relays reset
Control Switching Device (CSD) BYPASS COMMAND & Status
Fire fighting tank Water level, Manual Open/Close status (One SPS for each level)
Control Authority Transfer signals (NTAMC/BNTAMC/RTAMC)
Auto/Manual, Local/Remote
Other signals
Description
Tap Position (1- 25)
MW, MVAR, Current, Freq, Volatge
Temperature, Humidity
Fire fighting System Water pressure
DC Supply Volatge /Current
DG set & FF engine Battery volatge
Description
Analog
Analog spontaneous transmission
Description
Single Point Status (SPS)
Double Point Status (DPS)
Measurement Value (MV) or Analog Value (AI)
Double Point Control (DPC)
Single Point Control (SPC)
Station ID shall be a unique number for each substation to be provided by NTAMC Control Center
A Dummy Circuit Breaker to be provided in the Aux BCU Panel in Substation Control Room to test healthiness of the communication link including Substation Gateway / RTU from NTAMC control center. The associated control & monitoring indication to be hard wired to Aux BCU for the same.
BAY NUM.
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
765kV BUS-X
AUXBCU
AUXBCU
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
STATCOM AUX
BAY NUM.
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
WIND SPEED
WIND DIRECTION
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
BAY NUM.
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
WIND SPEED
WIND DIRECTION
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
STATCOM
Voltage Level (kV)
Meramundali
Mendhasal
Lapanga
New Duburi
Meramundali-B
Tarkera
Aska New
Balasore
Bargarh New
Bhadrak
Bhanjanagar
Bidanasi
Budhipadar
Chandaka
Chandaka-B
Cuttack
Duburi
Gunupur
Jayanagar
Jayapatana
Katapali
Kesinga
Narendrapur
New Bolangir
Paradeep
Pratapsasan
Samagara
Therubali
Balimela
Barkote
Bonai
Deogarh
Godisahi
Govindpalli
Infocity-II
Kasipur
Keonjhar
Lephripada
Malkangiri
Narasinghpur
Nayagarh
Rengali
Laxmipur
Telkoi
Agarpada
Akhusingh
Anandpur
Angul
Argul
Bahugram
Balugaon
Bangiriposi
Banki
Barbil
Bargarh
Baripada
Barpali
Basta
Berhampur
Betanati
Bhawanipatna
Bhogarai
Bhubaneswar
Birmaharajpur
Brajabiharipur
Brajarajnagar
Boinda
Bolangir
Boudh
Chandbali
Chainpal
Chandikhole
Chandpur
Chhatrapur
Chhend
Chikiti
Choudwar
Dabugaon
Daitari
Dhenkanal
Dhenkikote
Digapahandi
G. Udaygiri
Ganjam
Ghens
Gondia
Hinjili
Hirakud
Jagatsinghpur
Jajpur Road
Jajpur Town
Jaleswar
Jharsuguda
Junagarh
Kalarangi
Kalunga
Kamakhyanagar
Kantabanji
Karanjia
Kendrapara
Kesura
Khajuriakata
Kharagprasad
Khariar
Khuntuni
Khurda
Konark
Kuchinda
Mancheswar-B
Maneswar
Mania
Marshaghai
Muniguda
Mohana
Nabarangpur
Nimapara
Nuapara
Nuapatna
Olavar
Padampur
Palasponga
Paralakhemundi
Patangi
Patnagarh
Pattamundai
Phulbani
Phulnakhara
Podagada
Purusottampur
Rairakhole
Rairangpur
Rajgangpur
Rajnagar
Ranasinghpur
Rayagada
Rourkela
Saintala
Salipur
Sambalpur
Satasankha
Shamuka
Somanathpur
Sonepur
Sunabeda
Sundargarh
Tentulikhunti
Thuapalli
Tirtol
Tusura
Udala
Umerkote
ABREL
Arati Steels
Arya Iron
Aryan-Viraj
B C Mohanty & Sons
Bee Kay Steel
Bhubaneswar Power
Bolani
Brahmani River Pellets Ltd.
Global
Grid Steel
Jabamayee Ferro Alloys
JSWCL
RAMCO
Rungta Mines Ltd.
TSAlloys
Shree Ganesh Metaliks
Shyam DRI
SMC Power
Vedant Alumina
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
GeM_Availability_Report.pdf
pdf • 0.21 MB
Attachment 20- Affidavit for self-certification.DOCX
docx • 0.02 MB
Attachment-27.doc
doc • 0.04 MB
Bill of Material.xlsx
xlsx • 0.07 MB
First Envelope and Bid Forms.xlsx
xlsx • 0.66 MB
Non-Disclosure Agreement.doc
doc • 0.05 MB
Thumbs.db
db • 0.11 MB
Annex-III_Survey format.xlsx
xlsx • 0.21 MB
Annex-II_Typical Signal List.xlsx
xlsx • 0.65 MB
Annex-I_OPTCL SS.xls
xls • 0.04 MB
Scope of Work.pdf
pdf • 0.23 MB
01 IFB.docx
docx • 0.19 MB
02 GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
02 Section - II ITB SSTE S&I Rev 5-DCB.pdf
pdf • 1.95 MB
03 SCC - Revised.doc
doc • 0.50 MB
03A ANNEX-B (SCC) BG format for EMD.docx
docx • 0.04 MB
03B ANNEX-C (SCC) BG format for CPG.docx
docx • 0.04 MB
03D ANNEX-D (SCC) SA 8000 2008.pdf
pdf • 0.16 MB
Extension_I.docx
docx • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .