Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC JHETA JAMBONI MOHOBONI WESTMEDINIPUR WESTBENGAL | HOOGHLY | WEST BENGAL | 712122 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹3.3 L+₹34,440 (11.7%)Rejected-Finance G 2 BIDHAN NAGAR P O MIDNAPUR P S KOTWALI DIST PASCHIM MEDINIPUR PIN 721101 | MIDNAPUR | PASCHIM MEDINIPUR | WEST BENGAL | 721101 | L2 | Rejected-Finance Higher bidder | |
| 3 | L3₹3.7 L+₹75,360 (25.6%)Rejected-Finance B 16 280 KALYANI KALYANI NEAR KALYANI MUNICIPALITY NADIA WEST BENGAL 741235 | NADIA | WEST BENGAL | 741235 | L3 | Rejected-Finance Higher bidder | |
| 4 | L4₹3.7 L+₹79,800 (27.1%)Rejected-Finance 33 PEMANTLE STREET KOLKATA 700016 | KOLKATA | KOLKATA | WEST BENGAL | 700016 | L4 | Rejected-Finance Higher bidder | |
| 5 | L5₹4.0 L+₹1.0 L (34.4%)Rejected-Finance 242 1 SAHARA SUKANTA NAGAR KOL | L5 | Rejected-Finance Higher bidder |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
23 Nov 2020, 1:00 pmClosed
Executive Engineer Paschim Med. Elecl. Div. PWDte
Office of the Executive Engineer, Paschim Medinipur Electrical Division, P.W.Dte. Paschim Medinipur.
Annual comprehensive maintenance of Split model/ Concealed Split (1.5 T /2.0 T/ 7.5T/ 5.0T capacity) Air Conditioner machines at different sites under Midnapore Electrical Section-I, P.W.Dte. W.e.f. 01.12.2020 to 30.11.2021.
2020_WBPWD_304759_1
WBPWD/EE/PMED/NIQ-31/e-T /2020-2021
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Medinipur, Paschim Medinipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,000
29 Aug 2022
11 Nov 2020
25 Nov 2020
11 Nov 2020
23 Nov 2020
11 Nov 2020
Amount
Annual comprehensive maintenance of split model (1.5 T/2.0T capacity) Room Air conditioner machines at different sites under Midnapur Electrical Section-I, PW Dte. As per the details & terms & conditions spelt below:- Total Nos of AC machines :-
i) 1.5 ton split model- 16 nos.
ii) 2.0 ton split model- 150 nos.
iii) 5.0 ton conceraled split AC Machine-- 1no.
iv) 7.5 ton conceraled split AC Machine-- 11 nos.
Allocation : 1) D M Bunglow- 13 Nos. (13Nos 2 TR Split) 2) AD M (DEV)Bunglow)- 04 Nos. (4 Nos. 2.0 TR Split A.C.) 3) AD M (Panchyet)Bunglow.- 02 Nos. ( 1 No 1.5 TR Split A.C. 1 No 2 TR Split) 4) AD M(G)Bunglow- 04 Nos. (04 Nos. 2.0 TR Split ) 5) AD M(L& R)Bunglow - 01 ( 1 Nos. 1.5 TR Split A.C) 6) M V section- 07 Nos. (7 No. 2.0TR Split) 7)Development office-05 ( 5 Nos. 1.5 TR Split A.C) 8)Old DM Building-09(( 02 No 1.5 TR Split A.C. 7 No 2 TR Split) 9) D M meeting hall old-05 Nos 2 TR Split 10) Nazir Khana-01 (1 No (Nos 2 TR Split AC)
11) Tresuary office-5 Nos(1 No 2TR Split,4 Nos 1.5 TR Split) 12) NDC Office-01 No. 2.0 TR Split A.C. 13) Vigilance Office- 01 No. 2.0 TR Split A.C. 14) RTC Department-03 Nos 2 TR Split 15) DPRDO- 02 Nos. 2 TR Split AC. 16) Exise Deperment- 02 Nos. 2.0 TR Split A.C 17) S.D.O. Office- 02 Nos. 2.0 TR Split A.C 18) Minority Office- 24 Nos. 2.0 TR Split A.C. 19) LA Building-11 Nos. 2.0 TR Split A.C. 20) New Administrative-35 Nos. 2.0 TR Split A.C. 21)Multipurpose Bldg-7 Nos. 2.0 TR Split A.C. 22) DL&LRO (Keranitala)- 22 Nos(19 Nos 2.0 TR Split A.C.& 3 Nos 1.5 TR Split)
Multipurpose Office building: 23) Meeting hall 3 rd floor-4 Nos 7.5 ton 24) NREGA Cell 2nd floor-3 Nos 7.5 ton,1 Nos 5.0 ton 25) SHG Office 1 st floor-4 Nos 7.5 ton
SCOPE OF WORK AND TERMS & CONDITION:- A) Routine checking and servicing (Preventive maintenance). i) Checking & servicing of all mechanical & electrical parts of the A.C.Machine, refrigerant system, condenser & cooling system etc. twice in each month. ii) Checking of performance of each machine, grill temperature¸ room temperature etc. once in a month & these shall be noted, in Log Book. All entries be countersigned by the Agency and the concerned Junior Engineer in the Log Book. iii) All machine shall be numbered according to their location, made and as per direction of E.I.C & Log book be maintained accordingly. iv) Cleaning of filters twice in each month. v) Lubricating the motor bearings & all other moving parts as and when required. vi) Checking the electrical incoming lines incl. starter, switches etc. in each month. Any fault located should be brought to the notice of the Asstt. Engineer & Junior Engineer immediately. vii) Checking & repairing of all parts which have not been specified but necessary to keep the machine satisfactory running condition.
B) Overhauling: i) Through overhauling of the machine part by part once in a year. ii) Cleaning & painting of the machine body, base tray etc. once in a year. iii) Cleaning & discalling of condenser unit, cooling coil etc. and gas leak test once & when required in a year. iv) Overhauling shall preferably be done during winter season and must be noted in the Log Book.
C) Supply & Repairing: i) Supply of refrigerant shall be made as & when required by the Agency in his own cost. ii) Replacement capacitor (P2 type) incl. of all spare parts, including compressors, shall be made by the Agency for smooth running of the machine at his cost. iii) Filters be changed except nylon filter once in a year & the new once shall be approved by the EIC. iv) No major parts shall be removed without permission of concerned Asstt. Engineer. Challan shall be obtained from Junior Engineer while taking away machine or parts from site for repairing and materials shall be returned/ repaireed within three days to worksite in Co’s challan.
D) Attendance of break down: i) Break downs to be attended by experienced AC machines immediately after receiving initiation from the Junior Engineer, Asstt. Engineer and the authority concerned. ii) AC machine maintenance person must be provided with cell phone with contact no. iii) In case of major break down, the Agency shall replace the faulty machine by his own working machine (loan machine) until & unless the original machine is repaired & reinstalled at site. The cooling service at site shall not be interrupted for more than 24 hrs. iv) Nature of break down with date shall be recorded in the Log Book.
E) TERMS & CONDITION. i) All payments shall be made as per Govt. rules. ii) Agency may raise bills for quarterly payment. He shall submit service challan duly countersigned by the Junior Engineer & Asstt. Engineer mentioning therein the performance of the machine with grill temperature, room temperature at the time of servicing along with the log book duly signed by the JE & AE concerned. iii) No extra payment shall be made for repairing & replacement of machine parts, compressor or refrigerant. iv) The Log Book shall be kept upto-date & ready at Junior Engineer Chamber for verification by higher authority at any time & to be produced whenever demanded by the EIC for verification. v) The Executive Engineer reserves the right to terminate the contract at any time with one month notices. vi) If the Agency fails to make a break down machine operational with in 24 Hrs. or fails to provide replacement of the machine from his own working machine (loan machine), deduction from the bill will be made @`.20/- for each day in excess of 24 Hrs.
F) SPECIAL TERMS CONDITION. a) Each and every AC machine / Units shall be undergo routine servicing twice a month including checking of grill temperature, current drawn and overall efficiency to be recorded in the respective log book. b) In the event of major breakdown / malfunctioning of the machine / unit requiring a restoration time of more than 12 Hrs. in non-critical areas, and 6Hrs. in critical areas, the agency shall provide a substitute machine/ system at no extra cost to the department failing which recovery will be effected at double the agreement rate calculated on per day basis without any prejudice to the Engineer-in-Charge’s right to terminate the contract on a shorter notice than usual. c) However the recovery against malfunctioning / breakdown not properly addressed shall be limited to 10% of the contract value.
M/S JOGMAYA ENTERPRISE
REFRICON
MILLENNIUM AIRCON
SAHARA ENTERPRISE
WEATHER MAKERS INDIA
Lyric International
CARRION AIR COOLING
SKY DECORATIONS PRIVATE LIMITED
YOUNG ENGINEERING ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .