Loading…
Loading…
Tender ID
Tender Value
₹166.7 Cr
EMD Value
₹1.8 Cr
Closing Date
25 Jun 2026, 11:00 amClosed
Civil Division
Civil Division
Construction work of Proposed 38 nos. Hotel Blocks Phase II for Nalanda University including all services Buildings and Structures including necessary infrastructure development works (comprising all Civil, Structural, Finishing Work, all wired, piped services and Related Infrastructure Facilities, miscellaneous works), Rain Water collection system in Hostel parcel Development of Internal Roads, Walkways areas as well etc. for Nalanda University NU Project.
NU/Enggcivil/2026-27/01
NU/Enggcivil/2026-27/01
Open Tender-Domestic
Civil Works General
Civil Division
₹17,700
₹1.8 Cr
25 Jun 2026
2 May 2026
25 Jun 2026
2 May 2026
25 Jun 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
FINAL NIT NALANDA Hostel Blocks.pdf
Tender Document
NALANDA TECHNICAL SPECIFICATIONS PARTI.pdf
Tender Document
NALANDA_REVISED_TECHNICAL_SPECIFICATIONS_PART-II.pdf
Tender Document
Revised_NU_Hostel_Make_List.pdf
Tender Document
STP Technical Specifications MBBR System.pdf
Tender Document
BOQ_Summary.pdf
Tender Document
CS_cover_2_BoQ_Final.xlsx
Tender Document
BOQ_Details.pdf
Tender Document
corrigendum-112-Corrigendum 06.pdf
pdf • 0.07 MB
corrigendum-110-Corrigendum05.pdf
pdf • 0.37 MB
corrigendum-109-Corrigendum04.pdf
pdf • 0.28 MB
corrigendum-108-Corrigendum03.pdf
pdf • 0.28 MB
corrigendum-107-Corrigendum 02.pdf
pdf • 0.29 MB
addendum-e9bc7d7562d0-Addendum.pdf
pdf • 0.06 MB
corrigendum-104-Pre bid query reply.pdf
pdf • 0.66 MB
corrigendum-101-Corrigendum.pdf
pdf • 0.06 MB
addendum-2c6cda0ea4cf-Addedum.pdf
pdf • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .