Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | -32.33% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 L+₹2,955.97 (0.50%)Admitted-Finance | -31.99% | ₹5.9 L+₹2,955.97 (0.50%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹7,129.10 (1.21%)Admitted-Finance | -31.51% | ₹6.0 L+₹7,129.10 (1.21%) | L3 | Admitted-Finance |
| 4 | L4₹6.4 L+₹52,772.68 (8.97%)Admitted-Finance | -26.26% | ₹6.4 L+₹52,772.68 (8.97%) | L4 | Admitted-Finance |
| 5 | L5₹6.7 L+₹79,115.55 (13.4%)Admitted-Finance | -23.23% | ₹6.7 L+₹79,115.55 (13.4%) | L5 | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹17,400
Closing Date
1 Jun 2026, 6:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALILA POKARAN
Construction of tin shed at govt. Savtantarta senani govind singh parihar govt Sr sec. School pokaran
2026_DLB_559742_1
RO NO 100 DATE 12-05-2026
Open Tender
Civil Works
Percentage
60 days
POKARAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
E.O NAGAR PALIKA POKARAN
₹17,400
Yes
12 Jun 2026
15 May 2026
2 Jun 2026
15 May 2026
1 Jun 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m | - | Cum | 229.5 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | Cum | 4,330 | ₹4,325.67 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | 5,510 | ₹5,504.49 |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :foundations, footings, bases of columns, etc. for mass concrete. | 43.2 | Sqm | 236.5 | ₹10,216.8 |
| 5 | Structural steel work riveted, bolted or welded in built up sections,
trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | - | Kg | 114.5 | - |
| 6 | Supply & installation of precoated galvanized iron profile sheets (size, shape and pitch of corrugation as approved by Engineer- ncharge) 0.50 mm +/- 5% total coated thickness (TCT), Zinc coating 120gsm as per IS: 277 in 240mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns
minimum to avoid scratches while transportation and should be supplied in single length upto 12 metre or as desired by Engineer- ncharge. The sheet shall be fixed using self drilling /self tapping
screws of size (5.5x 55mm) with EPDM seal or with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete upto any pitch in horizontal/ vertical or curved surfaces excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | - | Sqm | 673 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_996431.xls
BOQ • 0.22 MB
Provisions.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .