Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹53.7 L
EMD Value
₹53,700
Closing Date
21 May 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC GONDA
EDC GONDA
129/EDC(G)/2023-24
2024_MVVNL_924383_1
NVS-129-131/EDC(G)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
EDC GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
SE EDC GONDA
₹53,700
Yes
EDC GONDA
25 May 2024
8 May 2024
22 May 2024
8 May 2024
21 May 2024
8 May 2024
13 May 2024
Amount
All these below items/materials from S.N. 1.01 to 1.35 will be given and errected by the contractor on his own cost as per estimate/Resspo Norms.
CLAMP FOR TOP, DROPPER AND T-OFF
LT CLAMP
M.S. NUT & BOLT
V TYPE X-ARM HOLDING CLAMP
Stone Pad
EYE HOOK
G.I. Pipe 6" Dia
11 KV TPMO WITH COMPLETE FITTINGS
33 KV TPMO WITH COMPLETE FITTINGS
D.O. FUSE SET (WITH CHANNEL AND CLAMP)
Earthing Complete
AL-LUG 400 SQMM
AL-LUG 240 SQMM
AL-LUG 120 SQMM
COPPER L - PIECE 62X250X12MM
COPPER L - PIECE 50X50X6MM
Dead - end Clamp
Pearsing Connector
I Hook WITH Holding Clamp
Suspension Clamp
33 KV FUSE SET
11 KV FUSE SET
LT Side FUSE SET
DISTRIBUTION BOX 3 PHASE
DISTRIBUTION BOX clamp
F- Bracket
EARTH ROD
MOG OTI & WTI Temp Indicator
PG CLAMP FOR LINE ISOLATOR
SUNDRIES (sand brick etc.)
GI STRIP
33 KV CABLE HOLDING CHANNEL
TAILRESS FUSE UNIT 300A,650V COMPLETE SET
COPPER BUS BAR 750*50*6 MM
MS ANGLE FOR RESTING TAILRESS UNIT
Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.35) from Electricity Store Centre, Gonda to the work site/dump site (Distance up to 60 km)
PCC Pole 8.5 METER
ST POLE 11 METER
25 KVA T/F
63/100 KVA T/F
250/400 KVA T/F
ABC CABLE 3×50
ABC CABLE 3×95
ABC CABLE 3×120
ACSR Weasel Conductor
11 KV V-Type X-Arm
MS ANGLE
TOP CHANNEL
DROPER CHANNEL
SUB STATION BASE
PIN INSULATER WITH PIN and NUT
DISC INSULATER WITH FITTING
STAY SET COMPLETE
LT XLPE CABLE 3 × 70
LT XLPE CABLE 3.5 × 150
11 KV XLPE CABLE 3 × 185
LT XLPE Cable 2x240 AL
LT XLPE Cable 1x400 AL
11 KV JOINTING KIT I/D FOR 3 × 185
11 KV straight through 3 × 185
Stay Wire
T-OFF CHANNEL
33 KV LINE ISOLATOR
33 KV LIGHTNING ARRESTER
33 KV Transformer Control Pannel For SINGLE TRANSFORMER
33 KV BREAKER CONTROL PANEL
stay insulator
stay CLAMP
G I WIRE 7/10 SWG
33 KV Vacume Circuit Brakar 1250 Amp.
Other material
Erection of single PCC/STP Poles (8.5/11 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site (All decentralize material shall be given by the contractor on his own cost.)
Erection of sectional double pole sectional PCC/STP Poles (8.5/11 Mtr Long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. (All decentralize material shall be given by the contractor on his own cost.)
Earthing with complete fitting
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost.
Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories.
25 KVA T/F
63/100 KVA T/F
250/400 KVA T/F
Dismounting of following capacity T/F and Loading, Unloading and safe cartage of the following materials from the work site/dump site to Electricity Store Centre, Gonda (Distance up to 40 km)
10/16/25 KVA T/F
63/100/160 KVA T/F
250/400 KVA T/F
Laying, Stringing & Sagging of ABC Cable up to proper sag for the following size cable as per estimate/resspo norms
ABC CABLE 3×50
ABC CABLE 3×95
ABC CABLE 3×120
Laying Stringing sagging & Binding of All size XLPE cable wher is required as per estimate/Resspo norms.
LT XLPE CABLE 3 × 70
LT XLPE CABLE 3.5 × 150
11 KV XLPE CABLE 3 × 185
LT XLPE Cable 2x240 AL
LT XLPE Cable 1x400 AL
Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required)
Installtion/Errection/Laying/stringing of the following items with complete fitting as per estimate/resspo norms.
11 KV JOINTING KIT I/D FOR 3 × 185
11 KV straight through 3 × 185
33 KV LINE ISOLATOR
33 KV LIGHTNING ARRESTER
33 KV Transformer Control Pannel For SINGLE TRANSFORMER
33 KV BREAKER CONTROL PANEL
33 KV Vacume Circuit Brakar 1250 Amp.
G.I. Pipe 6" Dia
11 KV TPMO WITH COMPLETE FITTINGS
33 KV TPMO WITH COMPLETE FITTINGS
D.O. FUSE SET (WITH CHANNEL AND CLAMP)
AL-LUG 400 SQMM
AL-LUG 240 SQMM
AL-LUG 120 SQMM
COPPER L - PIECE 62X250X12MM
COPPER L - PIECE 50X50X6MM
33 KV FUSE SET
11 KV FUSE SET
LT Side FUSE SET
DISTRIBUTION BOX 3 PHASE
TAILRESS FUSE UNIT 300A,650V COMPLETE SET
COPPER BUS BAR 750*50*6 MM
CONSTRUCTION OF PLINTH as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
CONSTRUCTION OF FENCING with Gate as well as standard painting as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Repairing of Plinth including dismounting and mounting of T/F from system and reinstallation as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Chemical type Earthing (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Boaring type Pipe Earthing (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
BORE TYPE DELTA EARTHING depth 40 feet for control room with GI strip as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Earthing of 11 KV Panel (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Earthing for line isolator (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Earthing 33 KV cable (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Construction of cable trench as per Estimate/ Resspo Norms. (All the required material shall be given by contractor on his own cost.)
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job)
Dismentaling of Burnt and damage VCB and carrage to store
Carrage of scrap/conductor from site to store
Dismentaling old material
Dismentaling old line
Guarding of line
S.R. Infraconstruction Pvt Ltd
M/s Aghoreshwar Kripa Construction Co.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .