Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 2 ZUBER COMPLEX 4 AERODROME CIRCLE KOTA 324007 | KOTA | KOTA | RAJASTHAN | 324007 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16.8 L
EMD Value
₹33,640
Closing Date
3 Jul 2025, 6:00 pmClosed
Unit Head
Senior Regional Manager RIICO EPIP Sitapura Jaipur
Regular door to door Collection of Garbage, Cleaning of ROW and regular cleaning of drains at Industrial Area EPIP Sitapura, Jaipur.
2025_RIICO_481500_1
08/EPIP Sitapura/2025-26/571/2
Open Tender
Civil Works
Item Wise
365 days
Industrial Area EPIP Sitapura
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
RIICO Ltd
₹33,640
8 Jul 2025
23 Jun 2025
4 Jul 2025
23 Jun 2025
3 Jul 2025
23 Jun 2025
Collection of domestic waste, garbage, non industrial solid waste generated from allottees of industrial area EPIP spread on about 360.83 acres and having road length of about 16 kms on daily basis from door to door of allottees by suitable commercial vehicle with hopper arrangement. The work shall also include the regular cleaning and upkeeping of ROW of roads of industrial area by way of engaging man power machineries tools and plants excluding the drains but including the jungle clearance and disposal of solid waste lying in ROW of road. The waste so collected will be transported and disposed of in proper manner by the agency at its own level and cost to the designated place of local bodies or as per directions of engineer in charge. Terms and conditions enclosed.
Desilting cleaning of existing effluent storm water carrying drainage system all types of section of drains of Industrial area EPIP Sitapura . The scope of work includes cleaning of drains approaches and cross drainage works up to bed level of the drain culvert CD work complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes the proper disposal of Sludge Silt Garbage etc and transportation of the same with all due care to a suitable ultimate disposal to a designated place or outside the Industrial area with all lead and lift as per the direction of Engineer incharge The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge Silt Garbage etc The work of cleaning of drain shall be completed within three months from the date of work order. 40% payment towards the quantum of work done shall be made after complete cleaning of the drainage system i.e. after completion of first quarter. Remaining 60% payment shall be made in three equal parts in the remaining period i.e. after completion of each quarter. During the remaining period, smooth flow through the cleaned drains shall be ensured by the contractor. No extra measurement will be paid for these quarter only the measurement will be paid for the work done during the first qtr.Terms and Conditions enclosed
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .