Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | ₹12.9 L | L1 | Accepted-AOC Twenty nine point eight eight percentage less than the department value |
| 2 | L2₹13.2 LRejected-AOC | ₹13.2 L | L2 | Rejected-AOC Twenty eight point zero zero percentage less than the department value |
| 3 | L3₹14.4 LRejected-AOC | ₹14.4 L | L3 | Rejected-AOC Twenty one point six one percentage less than the department value |
| 4 | L4₹14.6 LRejected-AOC 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | ₹14.6 L | L4 | Rejected-AOC Twenty point five zero percentage less than the department value |
| 5 | L6₹15.9 LRejected-AOC | ₹15.9 L | L6 | Rejected-AOC Thirteen point five zero percentage less than the department value |
Tender Value
₹18.4 L
EMD Value
₹10,000
Closing Date
18 Aug 2026, 3:00 pmClosed
The EE,TWAD, Sewerage Division, Pollachi
The EE,TWAD, Sewerage Division, Pollachi, No. 15, ASD Puram, Mahalingapuram Post, Pollachi - 642002
Automatic Servo Transformer (Oil cooled) and Flow diversion arrangements in Aliyar river under CWSS to Suleeswaranpatti, Kinathukadavu and Periyanegamam TPs and 52 habs in Pollachi North,South and Kinathukadavu Unions in CBE Dist under SDRF
2026_TWAD_693101_1
IFB_02_DR_Suleeswaranpatti
Open Tender
Civil Works - Others
Lump-sum
30 days
Vadugapalayam, Thamaraikulam, Ambarampalayam
Refer Bid Document
4 documents required · 4 mandatory
₹0
₹10,000
25 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
11 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rectification of voltage fluctuations by installation of Automatic Servo Transformer (Oil cooled) and Flow diversion arrangements in Aliyar river under CWSS to Suleeswaranpatti, Kinathukadavu and Periyanegamam Town Panchayats and 52 habitations in Pollachi North, Pollachi South and Kinathukadavu Unions in Coimbatore District under State Disaster Response Fund (SDRF) for the year 2026-2027 (Construction Period: 30 Days and Free Maintenance Period: 2 Months) | |||||
| 1.01 | Providing servo transformer for Booster Stations with 5 years guarantee and warranty | - | - | - | - |
| 1.02 | Design, manufacture, delivery, installation, testing and commissioning of automatic server transformer, including oil cooled floor mounted type weather terminated dust proof powder coated oil tank with MV automatic control panel board of 14 SWG M.S sheet and MS angle with enclosure, required No's of copper multi strand wire winding with required current ratings including user interface LED display, Low voltage and High voltage cutoff, Auto re-start with time delay, overload relay, single phase preventer and required no's of 8 pin bottle type persistence relays for controlling of safety measures with required number of on/off switches, indication lamps for indicating present position and 96 mm x 96 mm Voltmeter digital type and 96 mm x 96 mm Ammeter digital type and internal panel wiring suitable for low voltage operation at the wide range of 245 V to 500 V of connected induction to load (with 5 years guarantee and warranty) | - | - | - | - |
| 1.03 | 125 KVA /125 A Rating Automatic control servo Transformer at Vadugapalayam Booster Station | 1 | No | 7,42,900 | ₹7,42,900 |
| 1.04 | 100 KVA /100A Rating Automatic control servo Transformer at Thamaraikulam I Booster Station | 1 | No | 6,44,000 | ₹6,44,000 |
| 1.05 | Flow diversion arrrangements for Aliyar river at Headworks | - | - | - | - |
| 1.06 | Providing sand bags in the eroded berms including cost and conveyance of sand, supply of empty bags, loading and unloading, filling in bags with sand, shifting them and placing at eroded berms as directed by department officers etc., complete. (for river flow diversion) | 2,697 | Bags | 53.5 | ₹1,44,289.5 |
| 1.07 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete. | - | - | - | - |
| 1.08 | Poclain | 10 | Hours | 2,544 | ₹25,440 |
| 1.09 | Free Maintenance of the project executed under this scope successfully for a period of 2 (Two) Months from the successful commissioning of the project including all costs towards labour, spares, consumables, chemicals, repairs and renewals etc., complete (but excluding Electrical Energy charges payable to TNEB which will be borne by TWAD Board) as directed by TWAD Board Officers | 2 | Months | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_833347.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.11 MB
IFB02PollachiSuleeswaranpattiDR.pdf
Tender Documents • 4.10 MB
TBSuleeswaranpattiDR.pdf
Tender Documents • 1.10 MB
FlowDiagramPollachiSuleeswaranpattiDR.pdf
Additional Documents • 0.13 MB
BOQ_833347.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].