Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 251 A KARAKATHIKOTTAI MANAMELKUDI TALUK PUDUKKOTTAI 614 619 | PUDUKKOTTAI | TAMIL NADU | 614619 | Admitted-Finance |
Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Project Director,
DRDA, Pudukkottai
Construction of Cremation Shed and other infrastructure facilities to Samathuva Burial ground_1 nos. in AGAMT-II-2021-22 Village panchayats of Manamelkudi Block in Pudukkottai District in Package no. 44
2022_RDTN_243560_1
PUDUKKOTTAI DISTRICT - AGAMT II - 2021-2022
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
23 Aug 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
Amount
Improvements to Burial Ground (Cremation Shed,Compound Wall 17m ,CC Pavement 19m and Pipe Line Extension) at Chellanendal Merkku in Keelamanjakkudi Panchayat
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Refilling the basement with excavated earth other than sand complying standard specification
Supplying and filling with M.sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete For Cement Pavement
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete
Emulsion Painting two coats including cost of lime blue powder,fevicol type gums,brushes,scaffolding charges etc,. Complete
Sub Estimate - Pipe Line Arrangements
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc
Supply and delivery of following PVC Pipes 63mm OD 4 KSC PVC Pipes
Conveyance of the following rigd PVC pipes, lowering to trenches and laying to proper grade and alignment etc Complete as per TWAD Schedule of rate 11d ii
Refilling with excavated earth including all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PL R AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .