| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Below Estimate |
| 2 | L2₹1.3 Cr+₹6.4 L (5.03%)Rejected-Finance 3 AMARJOTHI PATTATHARASI AMMAN GARDEN RAKKIYAPALAYAM KANGEYAM ROAD TIRUPPUR 641 606 | TIRUPPUR | TAMIL NADU | 641606 | ₹1.3 Cr+₹6.4 L (5.03%) | L2 | Rejected-Finance Maduraa Engineering contractor has given the highest tender. So his tender was rejected |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
30 Jun 2023, 3:00 pmClosed
Executive Officer
SHOLUR TOWN PANCHAYAT, Sholur Post, The Nilgiris
IMPROVEMENTS OF THODLINGI TO BOKKAPURAM TEMPLE ROAD, THARNADUMANDU ROAD, MARIYAMMAN TEMPLE TO IYAN TEMPLE ROAD IN SHOLUR TOWN PANCHAYAT
2023_DTP_331313_1
193/2023
Open Tender
Civil Works
Works
120 days
SHOLUR TOWN PANCHAYAT
Please refer Tender Documents
3 documents required · 3 mandatory
₹0
₹1.5 L
Yes
SHOLUR TOWN PANCHAYAT
11 Jul 2025
23 Jun 2023
30 Jun 2023
23 Jun 2023
30 Jun 2023
23 Jun 2023
23 Jun 2023 - 30 Jun 2023
24 Jun 2023
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning, levelling including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion SS-for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder RS- using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material,labour charges ,rentals for machinery ,fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 46.28 kgs of VG30 / VG40 bitumen and 4.02Kgs of Shredded plastics for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Maduraa Engineering
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .