Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.4 LAccepted-AOC | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹41.6 L+₹31,290 (0.76%)Rejected-Finance | L2 | Rejected-Finance NOT BEING LOWEST | |
| 3 | L3₹41.9 L+₹64,931 (1.57%)Rejected-Finance | L3 | Rejected-Finance NOT BEING LOWEST | |
| 4 | L4₹43.7 L+₹2.4 L (5.92%)Rejected-Finance 32 FATEH ENCLAVE OFFICERS ENCLAVE PHASE II PATIALA 147001 PB | PATIALA | PATIALA | PUNJAB | 147001 | L4 | Rejected-Finance NOT BEING LOWEST | |
| 5 | L5₹47.4 L+₹6.1 L (14.7%)Rejected-Finance | L5 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | Arneja Builders L8 | RAVI INDER SINGH L1 | FAVOURITE ENGINEERS L9 | m/s panchmukhi builders L5 | Buttar Construction Co. L10 | DELTA CONSTRUCTION CO L7 | HARJIT CONTRACTS L2 | Jawandha Enterprises L12 | SWAMI ENGINEERS L4 | J S ENTERPRISES L3 | ANIL KUMAR AND CO L11 | SHIVAM ENGINEERS & FABRICATORS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning of sludge in under ground sewage network including manholes obstruction free by removing any type of blockage in any kind of manhole or lines including removing blockage inside the building from EWC/WC/floor trap/gully trap etc in old cantt area by deploying adequate manpower and suitable T&P so as to avoid damage to the line/structure complete all as specified and as directed.
Note:-
(i) Sewage network under new cantt area consists various dia of pipe lines varying from 10mm dia to 450mm dia.
(ii) Contractor or his rep will report daily at complaint cell of old cantt at 9.00 AM for collection of complaints from the concerned JE's Incharge, on failure a penalty of Rs. 500/- per day in addition to delay in attending the complaints will be charged. A seperate muster roll register will be maintained in AGE office.
(iii) Immediately after lodging daily complaints by the users or directed by the EIC consequent to his routine check, the concerned JE shall intimate/hand over the complaint to the contractor or his rep for attending complaints to the satisfaction of user / Engineer-in-charge within 24 Hrs. In case of failure to attend the complaint within specified period, a penalty of Rs.100/- per day per complaint shall be imposed on the contractor for the period the work remains incomplete. After 03 days from the date of handing over of complaint, the unattended complaints shall be got completed from any other agency at the risk and cost of the contractor without any notice to the contractor.
(iv) In case of disputes as to delay happened in attending the complaint or inadequate period, decision of Accepting Officer shall be final, conclusive and binding.The number of person provided by contractor is 3 nos.
(v) During cleaning of deep manholes or pipe lines, for precautions, contractor will also arrange oxyzen cylinder of suitable size, rope/chain to the workmen and cost there of shall be included under this item. | 11 | Each Month | 65,000 ₹7,15,000 | 10,000 ₹1,10,000 | 50,000 ₹5,50,000 | 74,000 ₹8,14,000 | 25,000 ₹2,75,000 | 35,000 ₹3,85,000 | 38,000 ₹4,18,000 | 70,000 ₹7,70,000 | 58,000 ₹6,38,000 | 9,000 ₹99,000 Lowest | 65,000 ₹7,15,000 | 50,000 ₹5,50,000 |
| 2.00 | Cleaning of soakage pits, septic tanks of any dia depth and in any location etc by taking out complete sludge water and solids mechanically by HCV mounted suction discharge machine having flow back facility with sludge tank of adequate capacity removing & disposing the entire retrieved material to a distance not exceeding 1000 meter outside the periphery of defence land and covering the entire sludge with local earth complete all as directed by the engineer-in-charge.
Note :- 1. The suction cum jetting machine and fuel provided by department for jetting only. however the small repairs if occurs will be done by contractor through his own expenses.
2. Depth of sludge in the pit shall be measured from the bottom of pit to the existing water/effluent lever prior to ordering the cleaning in the presence of EIC. | 250 | Cum | 270 ₹67,500 | 200 ₹50,000 | 500 ₹1,25,000 | 60 ₹15,000 Lowest | 150 ₹37,500 | 250 ₹62,500 | 100 ₹25,000 | 100 ₹25,000 | 180 ₹45,000 | 100 ₹25,000 | 250 ₹62,500 | 150 ₹37,500 |
| 3.00 | Excavation in trenches in soft/loose soil not exceeding 1.50 Mtr wide and not exceeding 1.50 Mtr in depth and getting out in soft/loose soil complete all as specified and directed Engineer-in-Charge | 500 | Cum | 135 ₹67,500 | 300 ₹1,50,000 | 100 ₹50,000 | 90 ₹45,000 | 150 ₹75,000 | 90 ₹45,000 | 250 ₹1,25,000 | 150 ₹75,000 | 80 ₹40,000 | 50 ₹25,000 Lowest | 250 ₹1,25,000 | 50 ₹25,000 Lowest |
| 4.00 | All as per Serial item No. 3 herein before but exceeding 1.5 Mtr and not exceeding 3.00 Mtr depth
Note :- The rate quoted should include provision of oxygen cylinder , safety belts and helmet in case of deep earth work as and when necessary. | 100 | Cum | 200 ₹20,000 | 150 ₹15,000 | 300 ₹30,000 | 99 ₹9,900 | 200 ₹20,000 | 120 ₹12,000 | 300 ₹30,000 | 200 ₹20,000 | 15 ₹1,500 Lowest | 100 ₹10,000 | 450 ₹45,000 | 60 ₹6,000 |
| 5.00 | Demolition of Brickwork or stone/boulder masonry, build in cement mortar including all quoins, arches, pillars etc, but excluding ashlars facings, dressed stonework and precast concrete articles complete all specified and directed by Engineer-in-Charge | 92 | Cum | 200 ₹18,400 | 100 ₹9,200 | 200 ₹18,400 | 100 ₹9,200 | 100 ₹9,200 | 100 ₹9,200 | 700 ₹64,400 | 250 ₹23,000 | 70 ₹6,440 Lowest | 80 ₹7,360 | 500 ₹46,000 | 80 ₹7,360 |
| 6.00 | M&L Brick work using Sub Class "B" brick, designation 100, straight or curved on plan not exceeding 6 Mtr means radius built in CM 1:4 complete all specified and directed by Engineer-in-Charge | 75 | Cum | 4,500 ₹3,37,500 | 3,500 ₹2,62,500 | 5,000 ₹3,75,000 | 4,200 ₹3,15,000 | 4,500 ₹3,37,500 | 4,800 ₹3,60,000 | 4,500 ₹3,37,500 | 4,000 ₹3,00,000 | 3,500 ₹2,62,500 | 5,000 ₹3,75,000 | 6,000 ₹4,50,000 | 3,000 ₹2,25,000 Lowest |
| 7.00 | All as per item no 6 above but using old Bricks complete all as specified and as directed by engr in charge. | 17 | Cum | 2,000 ₹34,000 | 1,000 ₹17,000 | 3,000 ₹51,000 | 2,200 ₹37,400 | 2,500 ₹42,500 | 1,200 ₹20,400 | 1,000 ₹17,000 | 2,500 ₹42,500 | 1,500 ₹25,500 | 1,500 ₹25,500 | 3,000 ₹51,000 | 500 ₹8,500 Lowest |
| 8.00 | Taking down cement plaster on brick walls built in cement mortar including raking out joints and concrete surfaces as in wall or ceiling etc. including hacking for key, scrubbing down with water etc complete all as specified and directed. | 100 | Sqm | 10 ₹1,000 | 20 ₹2,000 | 20 ₹2,000 | 25 ₹2,500 | 15 ₹1,500 | 7 ₹700 Lowest | 10 ₹1,000 | 15 ₹1,500 | 10 ₹1,000 | 7 ₹700 Lowest | 10 ₹1,000 | 10 ₹1,000 |
| 9.00 | M&L Cement plaster 15mm thick on fair faces of brick wk in cement mortar 1:4 and finished even and smooth without using extra cement with/without WPC complete all as specified and directed by Engr-in-Charge (WPC where required shall be measured and paid separately) | 250 | Sqm | 250 ₹62,500 | 150 ₹37,500 | 250 ₹62,500 | 230 ₹57,500 | 180 ₹45,000 | 165 ₹41,250 | 180 ₹45,000 | 150 ₹37,500 | 130 ₹32,500 | 200 ₹50,000 | 250 ₹62,500 | 120 ₹30,000 Lowest |
| 10.00 | M&L Applying 02 coats of cement base paint by using roller to wall surfaces complete all as specified and directed. | 120 | Sqm | 30 ₹3,600 | 30 ₹3,600 | 25 ₹3,000 | 35 ₹4,200 | 35 ₹4,200 | 35 ₹4,200 | 10 ₹1,200 Lowest | 50 ₹6,000 | 25 ₹3,000 | 10 ₹1,200 Lowest | 60 ₹7,200 | 10 ₹1,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
8 Jul 2026, 6:00 pmClosed
MAJ MOHAMMED AQIL AZEEM
GE NORTH PATIALA MILITARY ENGINEER SERVICES SANGRUR ROAD PATIALA CANTT
CERTAIN REPAIRS OF SEWAGE SYSTEM UNDER AGE BR-I OF GE(N) PATIALA
2026_MES_763739_1
GE (N)/TOKEN-11/2026-2027
Open Tender
Civil Works
Item Rate
330 days
PATIALA
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹500
GE N PATIALA
₹90,000
Yes
13 Aug 2026
6 May 2026
10 Jul 2026
6 May 2026
8 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of sludge in under ground sewage network including manholes obstruction free by removing any type of blockage in any kind of manhole or lines including removing blockage inside the building from EWC/WC/floor trap/gully trap etc in old cantt area by deploying adequate manpower and suitable T&P so as to avoid damage to the line/structure complete all as specified and as directed.
Note:-
(i) Sewage network under new cantt area consists various dia of pipe lines varying from 10mm dia to 450mm dia.
(ii) Contractor or his rep will report daily at complaint cell of old cantt at 9.00 AM for collection of complaints from the concerned JE's Incharge, on failure a penalty of Rs. 500/- per day in addition to delay in attending the complaints will be charged. A seperate muster roll register will be maintained in AGE office.
(iii) Immediately after lodging daily complaints by the users or directed by the EIC consequent to his routine check, the concerned JE shall intimate/hand over the complaint to the contractor or his rep for attending complaints to the satisfaction of user / Engineer-in-charge within 24 Hrs. In case of failure to attend the complaint within specified period, a penalty of Rs.100/- per day per complaint shall be imposed on the contractor for the period the work remains incomplete. After 03 days from the date of handing over of complaint, the unattended complaints shall be got completed from any other agency at the risk and cost of the contractor without any notice to the contractor.
(iv) In case of disputes as to delay happened in attending the complaint or inadequate period, decision of Accepting Officer shall be final, conclusive and binding.The number of person provided by contractor is 3 nos.
(v) During cleaning of deep manholes or pipe lines, for precautions, contractor will also arrange oxyzen cylinder of suitable size, rope/chain to the workmen and cost there of shall be included under this item. | 11 | Each Month | 10 | ₹110 |
| 2 | Cleaning of soakage pits, septic tanks of any dia depth and in any location etc by taking out complete sludge water and solids mechanically by HCV mounted suction discharge machine having flow back facility with sludge tank of adequate capacity removing & disposing the entire retrieved material to a distance not exceeding 1000 meter outside the periphery of defence land and covering the entire sludge with local earth complete all as directed by the engineer-in-charge.
Note :- 1. The suction cum jetting machine and fuel provided by department for jetting only. however the small repairs if occurs will be done by contractor through his own expenses.
2. Depth of sludge in the pit shall be measured from the bottom of pit to the existing water/effluent lever prior to ordering the cleaning in the presence of EIC. | 250 | Cum | 22 | ₹5,500 |
| 3 | Excavation in trenches in soft/loose soil not exceeding 1.50 Mtr wide and not exceeding 1.50 Mtr in depth and getting out in soft/loose soil complete all as specified and directed Engineer-in-Charge | 500 | Cum | - | - |
| 4 | All as per Serial item No. 3 herein before but exceeding 1.5 Mtr and not exceeding 3.00 Mtr depth
Note :- The rate quoted should include provision of oxygen cylinder , safety belts and helmet in case of deep earth work as and when necessary. | 100 | Cum | 1 | ₹100 |
| 5 | Demolition of Brickwork or stone/boulder masonry, build in cement mortar including all quoins, arches, pillars etc, but excluding ashlars facings, dressed stonework and precast concrete articles complete all specified and directed by Engineer-in-Charge | 92 | Cum | 10 | ₹920 |
| 6 | M&L Brick work using Sub Class "B" brick, designation 100, straight or curved on plan not exceeding 6 Mtr means radius built in CM 1:4 complete all specified and directed by Engineer-in-Charge | 75 | Cum | 22 | ₹1,650 |
| 7 | All as per item no 6 above but using old Bricks complete all as specified and as directed by engr in charge. | 17 | Cum | - | - |
| 8 | Taking down cement plaster on brick walls built in cement mortar including raking out joints and concrete surfaces as in wall or ceiling etc. including hacking for key, scrubbing down with water etc complete all as specified and directed. | 100 | Sqm | -22 | - |
| 9 | M&L Cement plaster 15mm thick on fair faces of brick wk in cement mortar 1:4 and finished even and smooth without using extra cement with/without WPC complete all as specified and directed by Engr-in-Charge (WPC where required shall be measured and paid separately) | 250 | Sqm | -44 | - |
| 10 | M&L Applying 02 coats of cement base paint by using roller to wall surfaces complete all as specified and directed. | 120 | Sqm | -66 | - |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_855466.xls
BOQ • 0.37 MB
TENDERDOCUMENTS.pdf
Tender Documents • 2.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .