Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
20 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
4, m.g. road howrah - 711101
Operation and maintenance of 8 nos Portable Stationary Compactors and 4 nos. Hook Loader for five years
2026_MAD_1044296_2
48/Cons/26-27
Open Tender
Miscellaneous Works
EOI
HMC
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,500
₹30 L
5 Oct 2026
5 Oct 2026
23 Oct 2026
5 Oct 2026
20 Oct 2026
5 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Daily wages of Station Staff for 1st year | 2,920 | Man-day | - | - |
| 2 | Daily wages of Guards for 1st year | 1,460 | Man-day | - | - |
| 3 | Daily wages of Mechanics for 1st year | 730 | Man-day | - | - |
| 4 | Daily wages of Electric Mechanics for 1st year | 730 | Man-day | - | - |
| 5 | Daily wages of Hook Loader Helpers for 1st year | 1,460 | Man-day | - | - |
| 6 | Daily wages of Hook Loader Drivers for 1st year | 1,460 | Man-day | - | - |
| 7 | Monthly routine and preventive maintenance of the Portable Stationary Compactor for 1st year,which shall include complete inspection, servicing and repair of the compactor body, frame, hopper, doors, hinges, locking system and structural components. Maintenance shall cover the complete hydraulic system, including pump, motor, cylinders, valves, hoses, fittings, seals and hydraulic oil. All mechanical and compaction components, including ram/platen, bearings, bushes, pins, rollers and moving parts, shall be inspected, lubricated and serviced. The electrical, control and safety systems, including control panel, sensors, switches, limit switches, wiring and emergency stop, shall be checked and tested. The scope shall include all necessary spare parts, lubricants, grease, consumables, welding, fabrication and minor repair works. All required labour, tools, tackles, cleaning, testing, transportation and associated costs shall be included to ensure the compactor remains safe, reliable and operational. | 96 | No./Month | - | - |
| 8 | Hook Loader monthly Routine and Preventive maintenance cost of all components for 1st year,which include cost of all frequently used spare parts, overall spare parts in servicing, all types of lubricant consumable and all necessary welding and fabrication works relating to the all components of body, engine, axle and chassis, including labour charges and all associated costs, including washing ,painting and supply of tools. | 48 | No./Month | - | - |
| 9 | Insurance, PUC, Fitness & Statutory Compliance of all machinery for 1st year | 12 | No./Year | - | - |
| 10 | Sweeping & Cleaning of Compactor Stations for 1st year | 4 | Station/Year | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
8compactor.pdf
Additional Documents • 0.32 MB
TENDERBOOK.pdf
Tender Documents • 6.10 MB
BOQ_2561489.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .