Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC | L1 | Accepted-AOC accepted as techno commercially evaluated L1 Bidder | |
| 2 | L2₹19.8 L+₹1.9 L (10.4%)Rejected-Finance | L2 | Rejected-Finance REJECTED AS L2 BIDDER | |
| 3 | L3₹21.5 L+₹3.6 L (20.0%)Rejected-Finance | L3 | Rejected-Finance REJECTED AS L3 BIDDER | |
| 4 | L4₹27.8 L+₹9.9 L (55.2%)Rejected-Finance | L4 | Rejected-Finance REJECTED AS L4 BIDDER |
Tender Value
₹30.2 L
EMD Value
₹37,800
Closing Date
18 Jan 2024, 5:00 pmClosed
Staff Officer(Mining), Orient Area, MCL
Mining Department, Office of the General Manager, Orient Area, MCL, Brajrajnagar, Jharsuguda, Odisha
Recovery,Salvaging of Belt,Belt structure,Track line,Pipe line 2inch dia,marching of 2 nos LHD,01 no UDM,Shifting of 01 no Auxiliary fan and electric circuit with their cables from 43LN dist Sec-C1 and transportation of same to 45LN dist Sec-C at HBM
2024_MCL_297743_1
MCL/GM/OA/SO(M)/2024/NIT-216/ 008
Open Tender
Civil Works - Others
Item Rate
90 days
Hirakhand Bundia Mine, RSA, Orient Area
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹37,800
7 Feb 2024
5 Jan 2024
19 Jan 2024
8 Jan 2024
18 Jan 2024
8 Jan 2024
8 Jan 2024 - 11 Jan 2024
Amount
Carriage of material from 45L/33DN (Sec-C1) to 45L/7DN(Sec-C1) and transportation of the same to 46L/4DN-6DN (Sec-C) (Track line Lead-0-1 Km. Manual Lead 0-50M)
Cutting and dismantling of rail in U/G mine (only labour rate)
Transportation of rail from 43LN dist. (Sec-C1) to 46L/4DN-6DN ( Sec-C) (Track line Lead-0-1 Km. Manual Lead 0-50M).
Transportation of Silly from 43LN dist to 46L/4DN-6DN (Sec-C) (Track line Lead- 0-1 Km, Manual Lead 0-50M).
Dismantling of pipes (external work) including stacking of pipes within 50m lead above 40mm nominal bore.
Transportation of (2" dia) MS/G.I pipes from 43LN dist. (Sec-C1) to 46L/4DN-6DN (Sec- C1).(Track line lead - 0.00-1.00 Km)
Marching of LHD/UDM from from one district to another district( 43LN Sec-C1 to 45LN Sec-C)
Shifting of single electric circuit with their cables and support of cables ( for 02 nos LHD, 01 no UDM )
Shifting of Auxiliary fan along with stater & Air duct
Total impact of GST for the purpose of CTC
DEBASISH SAHOO
RAMESH CHANDRA SETHI
Akash Agrawal
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .