| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -39.94% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.3 LAdmitted-Finance | -35.17% | ₹6.3 L | L2 | Admitted-Finance |
| 3 | L3₹6.5 LAdmitted-Finance | -33.64% | ₹6.5 L | L3 | Admitted-Finance |
| 4 | L4₹6.5 LAdmitted-Finance | -32.89% | ₹6.5 L | L4 | Admitted-Finance |
| 5 | L5₹6.9 LAdmitted-Finance | -29.11% | ₹6.9 L | L5 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹19,460
Closing Date
9 Feb 2026, 6:00 pmClosed
EXECUTIVE OFFICER LAXMANGARH SIKAR
LAXMANGARH SIKAR
construction of cc road from arjun lal to shyam hostel and nemichand dhaka back side to mahendra ke ghar tah ward 9
2026_DLB_531963_1
ETENDER/3567-69
Open Tender
Civil Works - Roads
120 days
LAXMANGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EXECUTIVE OFFICER LAXMANGARH SIKAR
₹19,460
Yes
16 Feb 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
9 Feb 2026
28 Jan 2026
Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.
Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone, boulders, gravelly material Earth up to 3 Km
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km)
Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery,lighting, guarding and maintenance ofdiversion
Raising precast circular manhole cover and frame by taking out existing precast frame and cover, providing and fixing precast SFRC circular spacer of required height, re-fixing existing manhole cover frame and cover with cement sand mortar (1:3), including making good the damage, complete as directed by Engineer.
Providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate notexceeding 25 mm, mixed in a batchingand mixing plant as per approved mix design, transported to site,laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction,expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant,debonding strip, dowel bar,tie rod, admixtures as approved, curing compound, finishing to linesand grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.PCC M-20
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_948103.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid