Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Accepted-Technical | Accepted-Technical OK |
| 3 | Accepted-Technical | Accepted-Technical OK |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
13 Jun 2026, 4:00 pmClosed
EO NP BHARAT BHARI
EO NP BHARAT BHARI
12 NAGAR PANCHAYAT BHARAT BHARI, SIDDHARTHNAGAR ME AVSTHIT SHIV MANDIR ME AVSTHAPNA SUVIDHAON KE VIKAS KA KARYA.
2026_DOLBU_1157873_12
159(I-IV) /N.P.BHARAT BHARI 2026-27 DATE 05.06.2026
Open Tender
Civil Works
Percentage
180 days
BHARAT BHARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
EO NP BHARAT BHARI
₹1.4 L
15 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clearence | 1 | JOB | 15,000 | ₹15,000 |
| 2 | Excavation in foundation in ordinary soil(loom
clay or sand) including lift upto 1.50meter and
llead upto 30 meter and including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and sides of foundation trenches or
into the plinth and removal and disposal of
|surface earth as directed by the E/l upto a
distance of 30meter from the foundation | 44.4 | CUM | 120 | ₹5,328 |
| 3 | |Plain cement concrete l:4:8 nominal mix in
|foundation with crushed brick ballast
|aggregate 40 mm nominal size mechanically
mixed, placed in foundation and compacted by
vibration including | 8.55 | CUM | 4,255 | ₹36,380.25 |
| 4 | Class 150 sub class-A brick work in 1:4
Cement and fine sand of 1.25 F.M, Mortar in
super strucure as per analysis SI No.305 +SI
No.309 for proper completion of work.
Total Wall Length
Bottom
DED FOR DOOR AND Windows
DED FOR DOOR AND Windows
DED FOR Wall
Ded Total column | 123.14 | CUM | 5,055 | ₹6,22,454.5 |
| 5 | Laying R.C.C. work with 1:1.5:3 with core
sand & 20mm stone gritt &alletc. SI NO 284A
Plinth Beam
Plinth,Lintel Beam
|Plinth,Lintel Beam
Plinth,Lintel Beam
C
C
C
C
Awning | 100.43 | CUM | 8,800 | ₹8,83,812.16 |
| 6 | Mild steel or Iron work in R.C.C. including
cutting at 1.5% of R.C.C. QTY SI NO 504 | 55.77 | QT | 7,150 | ₹3,98,785.53 |
| 7 | 12 mm thick plaster l:3 cement mortar &all
etc. complete in walls SI NO 582
Ded Door & Windosws, ventilator | 670.24 | SQM | 160 | ₹1,07,238.4 |
| 8 | Providing and applying white cement based
Iputty of average thickness 1 mm, of approved
brand and manufacturer, over the plastered
wall surface to prepare the surfacc even and
smooth complete." as per DSR 13.8 | 405 | SQM | 123.84 | ₹50,155.2 |
| 9 | Providing & Applying white cement and two
coat oil paint of average thickness I mm & all
lcomolte etc. Si No 23 NBO 18:57+18.57 (24) | 1,300 | SQM | 155 | ₹2,01,500 |
| 10 | Earth work filling for plimth area cartage eath
with 5km SI NO 253 | 804.35 | CUM | 312.4 | ₹2,51,279.88 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_2170228.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .