Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,820
Closing Date
27 Feb 2020, 3:00 pmClosed
Executive Engineer Constt Div III Edu Deptt Jammu
Directorate of Samagra Shiksha, Channi Rama, Jammu
CONSTRUCTION OF BOUNDARY WALL AT M.S. MALHAR, ZONE UDHAMPUR, DISTRICT UDHAMPUR (3rd call)
2020_RMSA_92744_1
FRESH E NIT No 316 of 2019-20 DIV III
Open Tender
Civil Works
Fixed-rate
90 days
CONSTRUCTION OF BOUNDARY WALL AT M.S. MALHAR, ZONE
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Executive Engineer Constt Div III Edu Deptt Jammu
₹7,820
3 Mar 2020
14 Feb 2020
28 Feb 2020
14 Feb 2020
27 Feb 2020
14 Feb 2020
14 Feb 2020 - 27 Feb 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 4 : 8)1 cement 4 coasre sand 8 stone aggregate grade , with 40mm nominal size . crushed (including all lead lift and carriages)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 3 : 6 ) with 20% boulders 1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size .crushed (including all lead lift and carriages)
Brick work with common burnt clay F.P.S (Non-modular) brick of class designation 75 in foundation and plinth in 1:6 (1 cement : 6 coarse sand) (including all lead lift and carriages)
Extra for brick work in Super structure above plinth level upto floor V level (By manual means)
Centering and shittering including strutting propping etc and removal of form work Foundation footing bases of columns etc
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers •. abutments, pillars, posts, struts, butteresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills,sunken floors fillets etc. upto floor five level, excluding the cost of centring, shuttering and finishing. 1:1.5:3(1 cement: 1.5 coarse sand :3 graded stone aggregate 20mm nominal size) (Crushed) (including all lead lift and carriages)
12 mm cement plaster on the rough side of single or half brick wall of mix 1:6 ( 1 cement 6 fine sand ) (including all lead lift and carriages)
Strctural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (including all lead lift and carriages)
Finishing walls with water proofing cement paint of requried shade New work(one or more coat )applied @2.20.kg/10 sqm over priming coat of primer applied @0.80 litres/10 sqm complete including cost of priming coat
Suman Lata
Radhika Rani
vivek bajaj
SURAJ PRAKASH
Nitin Kant
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .