Loading…
Loading…
Tender Value
₹91.0 L
EMD Value
₹1.8 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Bifurcation of elementary section and modification of umbrella structures at SKPT,YPR ,HUP, GBD,REPI,SSPN,BSPL and MKJ stations
B-TRD-29-2026-27-OT-06
B-TRD-29-2026-27-OT-06
Open
10 Months
Unknown (Unspecified Location)
₹0
₹1.8 L
14 May 2026
14 May 2026
22 May 2026
01-Section-1(General)
02-Non-SOR Items
Item Breakup - 01-Section-1(General)
1(a)-Preparation o f d e s i g n s a n d drawings for Per overhead equipment a n d v e r i fi c a t i o n of Track purchaser's pegging plan. KM
11(b)-Supply w itho ut Insulator o f 25 Insulator
11(b)- erection of 25 kV Post Insulator
31(a)-Transfer of equipment from one mast or Each support to another.
31(a)-Erection of equipment from one mast or Each support to another.
31(gz)-Dismantling Assembly.
31(gz)-Erection of a Section Insulator Assembly.
31(i)-Dismantling of an Isolator.
32/11(b)-erection of 25 kV Post Insulator - extra on Each erection rate for work under a power block
32/31(a)-Transfer of equipment from one mast or Each support to another - extra on erection rate for work under a power block
32/31(gz)-Dismantling of a Section Insulator Each Assembly- extra on erection rate for work under a power block
32/31(i)-Dismantling of an Isolator- extra erection rate for work under a power block Total 511267.00 Item- 02 Schedule-1 Section-2(Concrete) S No. Item Description of Item Unit Qty Rate Amount No
2(az)(ii)-Supply of Concrete for foundation and cum plinth in rocky soil
Erection of Concrete for foundation and plinth in cum rocky soil
2(bz)-Concrete for foundation and plinth in other cum than hard soil and rock
2(bz)-Erection of Concrete for foundation and cum plinth in other than hard soil and rock Total 1112562.00 Item- 03 Schedule-1 Section-3(Ferrous) S No. Item Description of Item Unit Qty Rate Amount No
3(b)(ii)-Supply of Structure steel (traction masts) MT fabricated and galvanized of all Type : B-Series Mast.
3(b)(ii)-Erection of Structure steel (traction masts) MT fabricated and galvanized of all Type : B-Series Mast.
3(b)(iii)-Supply galvanized steel structures other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii). BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
3(b)(iii)-Erection of special fabricated and MT galvanized steel structures other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii).
3( c)-Supply only of fabricated steel other than MT masts
3(e)(i)-Supply of a Guy Rod Assembly
3(e)(i)- erection of a Guy Rod Assembly
3(i)-Supply of 25kV Caution Board /Plate
3(i)- erection of 25kV Caution Board /Plate
4(a)(i)-Supply without insulator of Single bracket Each assembly.
4(a)(i)-Erection of Single bracket assembly.
9(a)-Supply without Insulator of anticreep with Each galvanized steel wire.
9(a)- erection of anticreep with galvanized steel Each wire.
16(a)(i)-Supply of a structure bond.
16(a)(i)- erection of a structure bond.
32/3(b)(ii)- erection of Structure steel (traction MT masts) fabricated and galvanized of all Type : B- Series Mast - extra on erection rate for work under a power block
32/3(b)(iii)-erection of special fabricated and MT galvanized steel structures other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii) - extra on erection rate for work under a power block
32/'3(e)(i)- erection of a Guy Rod Assembly- extra Each on erection rate for work under a power block
32/4(a)(i)- erection of Single bracket assembly- Each extra on erection rate for work under a power block
32/9(a)-erection of anticreep with galvanized steel Each wire- extra on erection rate for work under a power block
33/3(b)(ii)- erection of Structure steel (traction MT masts) fabricated and galvanized of all Type : B- Series Mast -extra on erection rates for steel work manually
33/3(b)(iii)-erection of special fabricated and MT galvanized steel structures other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii) -extra on erection rates for steel work manually Total 4477512.96 Item- 04 Schedule-1 Section-4(Non-Ferrous) S No. Item Description of Item Unit Qty Rate Amount No
12(az)-Supply without insulator assembly
12(az)-erection of a section insulator assembly
13(a)-Supply without Insulator of a 25 kV single Each pole isolator without earth contact assembly.
13(a)-erection of a 25 kV single pole isolator Each without earth contact assembly.
15(e)-Supply of materials of Large copper jumper Each 160 Sq. mm between cross feeder and OHE
15(e)-erection of Large copper jumper 160 Sq. mm Each between cross feeder and OHE
26(a) (ii) -Supply of Solid copper bus-bars 18mm
26(a) (ii) -erection of Solid copper bus-bars 18mm Metre BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
26(c) connectors:- Bus terminal (RI-6310)
26(c) connectors:- Bus terminal (RI-6310)
32/12(az)-erection of a section insulator assembly- Each extra on erection rate for work under a power block
32/13(a)-erection of a 25 kV single pole isolator Each without earth contact assembly- extra on erection rate for work under a power block
32/15(e )-erection of Large copper jumper 160 Sq. Each mm between cross feeder and OHE- extra on erection rate for work under a power block
32/26(a)(ii)- erection of Solid copper bus-bars Metre 18mm- extra on erection rate for work under a power block
32/26(c)(i)-erection connectors:- Bus terminal (RI-6310)-extra on erection rate for work under a power block Total 1735526.00 Item- 05 Schedule-1 Section-5(Insulators) S No. Item Description of Item Unit Qty Rate Amount No
4(ax)(i)-Supply of Insulators for items 4(a)(i) & Each 4(a)(iii) Stay Arm Porcelain (CD-1050 mm)
4(ax)(iv)-Supply of Insulators for items 4(a)(i) & Each 4(a)(iii) Bracket Porcelain (CD-1050 mm)
9(ax)(i)-Supply of 9-Tonne insulators for items Set 9(a), (b), (c), (d) & ( e) Porcelain (CD-1050 mm)
11(bx)-Supply of 25 kV Post Insulator for Item 11 Each (b)
12(ax)(i)-Supply of 9 Tonne and Sectioning Set Insulators for item No.12(a) Porcelain 9-Tonne (CD-1050 mm) & Sectioning Insulator
13(ax)-Supply of Post & Operating rod insulators Set for item 13(a) Total 899802.00
Item Breakup - 02-Non-SOR Items
Preparation of Traction Working Rule Diagram Each along with working Instructions Total 102761.82 Item- 02 E2-Supply and Installation of Traction working Rule Diagram Boards S No. Item Description of Item Unit Qty Rate Amount No
Supply and Installation of Traction working Rule Square 216.00 Diagram Boards Foot Total 264103.20
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
I_CT_GCC-
ATTACHMENT
ACS12345678910and11forGCC.pdf ACS 12345678910 and 11 for GCC
ATTACHMENT
06PREAMBLE_1.pdf
ATTACHMENT
06Priceandpayment_1.pdf
ATTACHMENT
06FormsofTender.pdf
ATTACHMENT
06InstructionstoTenderer.pdf
ATTACHMENT
06Generalconditionsofcontract.pdf 06 General conditions of contract
ATTACHMENT
06ExplanatoryNote.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22_2.pdf
ATTACHMENT
ACS12345678910and11forGCC.pdf
ATTACHMENT
06Generalconditionsofcontract.pdf
ATTACHMENT
Download all tender documents and submit your bid