Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹51.6 L
EMD Value
₹1.0 L
Closing Date
25 Nov 2026, 5:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, MI DIVISION, KODERMA
Construction of P.C.C Road and Drain from Doiandih Main Road to Shamshan Ghat at Village-Doiandih, Panchayat-Jhumri Under Koderma Block.
2026_WRD_121190_1
SPUF/MID/KODERMA/F2-08/2026-27
Open Tender
Civil Works
Percentage
90 days
KODERMA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.0 L
19 Nov 2026
19 Nov 2026
27 Nov 2026
19 Nov 2026
25 Nov 2026
19 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. BCD. 5.1.1 | 606.42 | M3 | 239.02 | ₹1,44,946.51 |
| 2 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) BCD. 5.1.10 | 18.32 | M3 | 697.24 | ₹12,773.44 |
| 3 | Granular Sub-Base with Graded Material (Table:- 400-1)
(B)By Mix in Place Method
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
(iii) Rate per cum for grading-III Material. RCD 4.01 B (iii) | 217.68 | M3 | 1,846.9 | ₹4,02,033.19 |
| 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. BCD. 5.6.3 | 240.42 | M2 | 475.78 | ₹1,14,387.03 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1.5.3(1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) BCD. 5.3.1.1 | 265.17 | M3 | 6,490.26 | ₹17,21,022.24 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) BCD. 5.3.9.1 | 103.67 | M3 | 6,836.13 | ₹7,08,701.6 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for foundation footing , base of Column etc. for mass concrete. BCD. 5.3.17.1 | 1,246.23 | M2 | 254.4 | ₹3,17,040.91 |
| 8 | Providing tor steel reinforcement of 8mm dia rods as per approved design and drawing with cutting ,bending and binding with annealed wire with cost of wire removal of rust , placing the rods in position ( including carrage of bar at work site) all complete as per building specification and direction of E/I. (TMT coil Fe 500) ( only valid for TATA (TISCON), SAIL, JSPL, ELECTROSTEEL STEELS Ltd. BOKARO and VIZAG (RINL). BCD. 5.5.4 | 2.24 | MT | 83,896.48 | ₹1,87,928.12 |
| 9 | Proiding tor steel reinforcement of 10mm, 12mm & 16mm dia bars as per approved design and drawing with cutting ,bending and binding with annealed wire with cost of wire removal of rust , placing the rods in position ( including carrage of bar at work site) all complete as per building specification and direction of E/I. (a) 10mm (TMT coil Fe 500) ( only valid for TATA (TISCON), SAIL, JSPL, ELECTROSTEEL STEELS Ltd. BOKARO and VIZAG (RINL). BCD. 5.5.5 (a) | 3.31 | MT | 81,767.74 | ₹2,70,651.22 |
| 10 | Proiding tor steel reinforcement of 10mm, 12mm & 16mm dia bars as per approved design and drawing with cutting ,bending and binding with annealed wire with cost of wire removal of rust , placing the rods in position ( including carrage of bar at work site) all complete as per building specification and direction of E/I. (b) 12mm (TMT coil Fe 500) ( only valid for TATA (TISCON), SAIL, JSPL, ELECTROSTEEL STEELS Ltd. BOKARO and VIZAG (RINL). BCD. 5.5.5 (b) | 0.08 | MT | 80,247.21 | ₹6,419.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
TENDER_DOCUMENTS_8.pdf
Tender Documents • 14.88 MB
BOQ_163992.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .