Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -0.50% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹1,371.33 (0.50%)Admitted-Finance | +0.00% | ₹2.7 L+₹1,371.33 (0.50%) | L2 | Admitted-Finance |
| 3 | L2₹2.7 L+₹1,371.33 (0.50%)Admitted-Finance | +0.00% | ₹2.7 L+₹1,371.33 (0.50%) | L2 | Admitted-Finance |
Tender Value
₹2.7 L
EMD Value
₹5,480
Closing Date
11 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_316530_23
e-NIT No. 55 REW UDHAMPUR of 2026-27 Dated 17-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹5,480
Yes
20 Aug 2026
20 Jul 2026
12 Aug 2026
20 Jul 2026
11 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of Sign board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earth work in trench excavation 80 % all kinds of soil and 20 % OR | 7.67 | Cum | 568.4 | ₹4,359.63 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1 | cum | 4,826.5 | ₹4,826.5 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 9.5 | cum | 5,733.6 | ₹54,469.2 |
| 5 | P/L Brick work in 1:6 mix | 0.76 | Cum | 9,027.2 | ₹6,860.67 |
| 6 | 15 mm thick plaster in 1:6mix | 8.63 | Sqm | 306.85 | ₹2,648.12 |
| 7 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 57.43 | Sqm | 286.35 | ₹16,445.08 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes
etc.) trusses etc., including cutting , hoisting , fixing in position and
applying a priming coat of approved steel primer, including welding and
bolted with special shaped washers etc. complete. | 97.31 | Kg | 156.95 | ₹15,272.8 |
| 9 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete. Welded | 531.2 | Kg | 138.2 | ₹73,411.84 |
| 10 | Providing and fixing G.I. chain link fabric fencing of required width in
mesh size 25x25 mm made of G.I. wire of dia 3 mm including
strengthening with 2 mm dia wire or nuts, bolts and washers as required
complete as per the direction of Engineer-in-charge. | 55.76 | Sqm | 929.35 | ₹51,820.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1032481.xls
BOQ • 0.24 MB
extensionfinal.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .