Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.6 L+₹775 (0.17%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.6 L+₹2,918 (0.64%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ABHISHEK CONSTRUCTION L1 | M/S SUBHASH TRADERS L2 | M/S Shukla Traders L3 |
|---|---|---|---|---|---|---|
| 1.00CARTAGE OF STORE ITEMS FORM ESC, RAEBARELI TO DUMP SITE AND WORK SITES ALONG WITH LOADING, UN-LOADING AND PROPER STACKING | ||||||
| 1.01 | Loose line material ABC 3X50 AND ACSR CONDUCTOR INCLUDING 11KV PIN INSULATOR WITH PIN,11KV DISC FITTING 45KN, 11KV INSULATOR 45KN, TOP CHHANEL, M.S. T-OFF CHANEL, STAY COMPLETE, S/S BASE ANGAL, G.I. WIRE 6SWG, M.S. DROPER ANGAL, M.S. GUARDING ANGAL etc. | 2 | Job | 18,450 ₹36,900 | 18,400 ₹36,800 | 12,500 ₹25,000 Lowest |
| 1.02 | PCC POLE 8.5 METER LONG | 14 | Nos | 950 ₹13,300 Lowest | 955 ₹13,370 | 1,250 ₹17,500 |
| 1.03 | 11 KV POLYMERIC PIN INSULATER | 21 | Nos | 30 ₹630 | 31 ₹651 | 9 ₹189 Lowest |
| 1.04 | MS CHANNEL 125X65X1300 MM(T-OFF) | 7 | Nos | 10 ₹70 Lowest | 11 ₹77 | 30 ₹210 |
| 1.05 | 11 KV POLYMIRIC DISC INSULATOR 45 KN | 21 | Nos | 10 ₹210 Lowest | 11 ₹231 | 10 ₹210 Lowest |
| 1.06 | 11 KV DISC FITTING 45 KN | 21 | Nos | 10 ₹210 Lowest | 11 ₹231 | 10 ₹210 Lowest |
| 1.07 | 11/0.4 KV T/F 100 KV | 3 | Nos | 7,200 ₹21,600 | 7,250 ₹21,750 | 5,250 ₹15,750 Lowest |
| 1.08 | 11/0.4 KV T/F 63 KV | 12 | Nos | 6,700 ₹80,400 | 6,750 ₹81,000 | 4,750 ₹57,000 Lowest |
| 1.09 | EARTHING COMPLETE | 16 | Nos | 20 ₹320 Lowest | 21 ₹336 | 20 ₹320 Lowest |
Tender Value
₹4.6 L
EMD Value
₹5,000
Closing Date
11 Sept 2025, 6:00 pmClosed
SE EDC-I RAEBARELI
SE EDC-I RAEBARELI
WORK MENSION IN BOQ (BP 2025-26)
2025_MVVNL_1069714_1
47/EDC-I,R/2025-26
Open Tender
Electrical Works
Item Wise
30 days
UNDER EDD TRIPULA RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EXECUTIVE ENGINEER C AND MC
₹5,000
19 Sept 2025
30 Aug 2025
12 Sept 2025
30 Aug 2025
11 Sept 2025
30 Aug 2025
Amount
CARTAGE OF STORE ITEMS FORM ESC, RAEBARELI TO DUMP SITE AND WORK SITES ALONG WITH LOADING, UN-LOADING AND PROPER STACKING
Loose line material ABC 3X50 AND ACSR CONDUCTOR INCLUDING 11KV PIN INSULATOR WITH PIN,11KV DISC FITTING 45KN, 11KV INSULATOR 45KN, TOP CHHANEL, M.S. T-OFF CHANEL, STAY COMPLETE, S/S BASE ANGAL, G.I. WIRE 6SWG, M.S. DROPER ANGAL, M.S. GUARDING ANGAL etc.
PCC POLE 8.5 METER LONG
11 KV POLYMERIC PIN INSULATER
MS CHANNEL 125X65X1300 MM(T-OFF)
11 KV POLYMIRIC DISC INSULATOR 45 KN
11 KV DISC FITTING 45 KN
11/0.4 KV T/F 100 KV
11/0.4 KV T/F 63 KV
EARTHING COMPLETE
STAY COMPLETE
ABC (3X50+1X35+1X16SQMM)
M.S TOP CHANNEL 125X65X2240MM
M.S TOP CHANNEL(DROPPER) 100X50X2028MM FOR FUSE SET
M.S SUB STATION ANGLE
LT PVC CABLE 3.5X150/70 SQMM
Stone Pad
ERRECTION
Erection of D/P by PCC Pole 8.5 Mtr. including digging of Pits & fitting of All accessories. (Double Pole)
Digging of pits, fixing nozzling & grouting of stay rods as per RESSPO norms including grouting materials.
Grouting of Poles as per RESSPO norms with grouting materials.
Dismounting 63 KVA/Mounting of New 100 KVA T/F on DP
Dismounting 16 KVA (02 No), 25 KVA (05 No 1 PH + 05 No 3 PH)/Mounting of New 63 KVA T/F on DP
EARTHING OF POLES AS PER RESPO NORMS
INSTALLATION 11 KV FUSE SET AS PER NORMS
Material Provided by the contractor
11 KV fuse Set
HOLDING CLAMP WITH NUT & BOLT
Danger baord
Concreting of PCC Poles
Pipe Earthing
T-off Clamp
CARTAGE OF RECIPT BACK ITEMS FORM SITE TO ESC, RAEBARELI AND WORK SITES ALONG WITH LOADING, UN-LOADING AND PROPER STACKING
M/S SUBHASH TRADERS (BID ID -5527375)
M/S Shukla Traders (BID ID -5527981)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .