| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.9 L+₹4,850.60 (0.49%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M.Gunasekaran L2 | S R Suresh L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24) | 27.12 | Cum | 188.89 ₹5,122.7 | 184 ₹4,990.08 Lowest |
| 1.02 | Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed. | 8.83 | Cum | 5,215.61 ₹46,053.84 | 5,211 ₹46,013.13 Lowest |
| 1.03 | Plain Cement Concrete 1:3:6 using 20 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification | 36.61 | Cum | 5,951.16 ₹2,17,871.97 | 5,947 ₹2,17,719.67 Lowest |
| 1.04 | Supply & Laying of Well Gravel including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc.., complete | 46.76 | Cum | 236.93 ₹11,078.85 | 232 ₹10,848.32 Lowest |
| 1.05 | Supplying and erecting centering for column footing plinth beam, Grade beam including strutting etc., complete complying with std. Specifications and as directed. | 262.37 | Sqm | 379 ₹99,438.23 | 375 ₹98,388.75 Lowest |
| 1.06 | Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method) . | 46.76 | Cum | 1,687.22 ₹78,894.41 | 1,683 ₹78,697.08 Lowest |
| 1.07 | Flooring with paver blocks laid interlocking blocks 60mm thick including cost and conveyance of all materials to site and all lobour chareges at site, including cost of sand for bedding and watering etc, complete as per standard specification | 467.59 | Sqm | 680.74 ₹3,18,307.22 | 676 ₹3,16,090.84 Lowest |
| 1.08 | Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc | 13.95 | Sqm | 563.54 ₹7,861.38 | 559 ₹7,798.05 Lowest |
| 1.09 | Provision for soack pit | 7 | nos | 7,504 ₹52,528 | 7,500 ₹52,500 Lowest |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST | 1,50,688.19 ₹1,50,688.19 | 1,49,948.27 ₹1,49,948.27 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
28 Jun 2025, 5:00 pmClosed
Block Development Office VP
Andipatti
Providing paver block With Drainage and Small culvert at Balacombai AD Colony Ravi House Street in Balacombai Panchayat under ITPHIDS-2025-2026
2025_RDTN_573541_1
ITPS-2025-26 26.06.2025
Open Tender
Civil Works - Others
Item Rate
Andipatti
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
Yes
21 Aug 2025
25 Jun 2025
28 Jun 2025
25 Jun 2025
28 Jun 2025
25 Jun 2025
Amount
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24)
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Plain Cement Concrete 1:3:6 using 20 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Supply & Laying of Well Gravel including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc.., complete
Supplying and erecting centering for column footing plinth beam, Grade beam including strutting etc., complete complying with std. Specifications and as directed.
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method) .
Flooring with paver blocks laid interlocking blocks 60mm thick including cost and conveyance of all materials to site and all lobour chareges at site, including cost of sand for bedding and watering etc, complete as per standard specification
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc
Provision for soack pit
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.Gunasekaran (BID ID -1384540)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .