Loading…
Loading…
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
2 Jan 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
ELECTRICAL
10 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/We have read the various conditions attached/referred to in this tender document and agree to abide by the said conditions.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking.
The Tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum o f work and assess all the site specific difficulties to be experienced while executing the same and the rate shall be arrived duly considering all the facts above and quoted in the tender. Any representation at a later date specifying the site difficulties shall not be considered.
The tenderer shall go through the entire tender documents thoroughly and strictly adhere the instructions and directions given at different pages.
(i)For all the tenders having advertised cost of Rs. 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement. (ii)This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.(iii)The option so exercised, shall be an integral part of the bidder's offer.(iv)The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract.(v)In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC:(a)The LC shall be a sight LC.(b)The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor.(c)SBI, New Delhi, Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units for tenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15 % per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills. (d)The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractor on the basis of expected progress of work.(e)The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by Contractor.
(f)The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.(g)The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.(h)The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.(i)On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j)The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.(k)The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch). (l)The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch0.(m)The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.(n)Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened.(o)The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor.(p)The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC.
Sr. DEN/South/MDU jurisdiction: Construction of Gang rest room - Electrical power supply, wiring & installation arrangements
U-E-OT-2025-20-03~SR
U-E-OT-2025-20-03
Open
Works - General
6 Months
Madurai, Tamil Nadu
₹0
₹23,000
2 Jan 2026
11 Dec 2025
19 Dec 2025
56 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,17,987.9 | ||
| — | 17.00 | — | — | ||
| Supply and fixing of cable route indicator, cast iron plate type | — | — | — | 10,124.86 | |
| — | 206.00 | — | — | ||
| Excavation of trench in all kinds of soil including refilling as per specification | — | — | — | 89,919 | |
| — | 26.00 | — | — | ||
| Excavation of Cable trench across the concrete flooring / road / track as per specification | — | — | — | 22,698 | |
| — | 660.00 | — | — | ||
| Laying/Drawing and testing of LTUG power cable of up to and including 50 sqmm size complete with required tools & accessories. | — | — | — | 17,160 | |
| — | 26.00 | — | — | ||
| Supply and termination and connection of LTUG cable of sizes of up to and including 50 sqmm size with single flange type brass cable gland aluminium tube terminal type crimping sockets.Note: One termination comprises of one number of single flange type brass cable gland and with four numbers of aluminium crimping sockets for all cores of the cable. | — | — | — | 11,518 | |
| — | 26.00 | — | — | ||
| Supply and provision of sealing compound for cable leading pipe for leading of power cables of upto and including 50sqmm size. | — | — | — | 2,548 | |
| — | 72.00 | — | — | ||
| Clamping of LTUG cable on the wall /structure / with painted MS clamps of suitable size with fixing hard wares. (Only cable will be supplied by Railways). | — | — | — | 2,880 | |
| — | 52.00 | — | — | ||
| Supply and fixing of medium duty GI pipe of 50 mm dia, conforming to IS.1239,part 1 (2004) ,for cable leading/Protection | — | — | — | 47,464.04 | |
| — | 660.00 | — | — | ||
| Supply and laying of 6 SWG GI wire | — | — | — | 14,520 | |
| — | 26.00 | — | — | ||
| — | 26.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .