Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Finance | -40.13% | ₹6.0 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 L+₹2.0 L (33.6%)Admitted-Finance | -20.00% | ₹8.0 L+₹2.0 L (33.6%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
24 Jun 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer PWD R B Division JMC
Shed near Guru Ravidass Mandir Jallu Chack ward 68 Jammu AC R.S Pura Jammu South.
2026_HAUDD_312506_1
PWD(RB)DIV/JMC/14 of 2026-27 Dated 15-06-2026
Open Tender
Civil Works
Percentage
90 days
Ward no 68
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R B Division JMC
₹20,000
Yes
27 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge all kinds of soil. | 12.23 | Cum | 479.3 | ₹5,861.84 |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5coarse sand : 10graded stone aggregate 40 mm nominal size) | 0.76 | Cum | 4,826.5 | ₹3,668.14 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 7.4 | Cum | 5,733.6 | ₹42,428.64 |
| 4 | Steel work in built up tubular (round, square or rectangular hollow tubes
etc.) trusses etc., including cutting , hoisting , fixing in position and
applying a priming coat of approved steel primer, including welding and
bolted with special shaped washers etc. complete.
Hot finished welded type tubes) | 4,425 | KG | 156.95 | ₹6,94,503.75 |
| 5 | Providing and Fixing of color coated G.I sheet of thickness 0.63mm of desired color and design as per dirrected by Engineer in Charge. | 1,750 | sft | 120 | ₹2,10,000 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture
to give an even shade. Two or more coats on new work | 83.64 | sqm | 131.85 | ₹11,027.93 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. | 39.03 | Sqm | 286.35 | ₹11,176.24 |
| 8 | Removal of mulba from site of work to beyond muncipal Muncipal limits including loading unloading complete | 12.23 | Cum | 348.82 | ₹4,266.07 |
| 9 | providing and fixing of Inaugration of Name Plate including Pedstal all complete job | 1 | no | 10,000 | ₹10,000 |
| 10 | Carriage of material by M.T of side including loading unloading complete Sand 10 Km+Stone Agg 10 Km | 11.06 | Cum | 279.04 | ₹3,086.18 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1011633.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .