Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.0 L+₹109.21 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.1 L+₹4,368.47 (4.17%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.2 L+₹16,381.77 (15.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.2 L
EMD Value
₹3,630
Closing Date
13 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
office of the executive engineer rew ang
office of the executive engineer rew ang
CONSTRUCTION OF TILE PATH FROM HOUSE OF BALWANT SINGH TO SHANTY SINGH AT PALPORA BLOCK VESSU
2026_RDPR_330620_20
ENIT135of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,630
17 Nov 2026
7 Nov 2026
14 Nov 2026
7 Nov 2026
13 Nov 2026
7 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of manual labour for site clearance and removing undulations | 2 | Nos | 625 | ₹1,250 |
| 2 | providing and laying of dry stome solling/rbm inc. all carriages | 8.75 | cum | 900 | ₹7,875 |
| 3 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) all work upto plinth level | 8.15 | Cum | 5,733.6 | ₹46,728.84 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns | 6.99 | sqm | 286.35 | ₹2,001.59 |
| 5 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 62.68 | sqm | 816.15 | ₹51,153.83 |
| 6 | carriage of materials by MT:sand aggregates for an avg lead of 10kms by mt(sta) | 11.33 | cum | 284.04 | ₹3,218.17 |
| 7 | Carriage of tiles | 1 | Trip | 1,200 | ₹1,200 |
| 8 | Carriage of material by H/L , Lead 150m (STA):
Crushed stone Aggregate /Sand | - | Cum | - | - |
| 9 | Soling stone | - | Cum | - | - |
| 10 | provision for signboard and photograph charges and other foreseen items cj (sta) | 1 | job | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_1122136.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .