Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹5,263
Closing Date
10 Nov 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr.Xen
Er.Rahul Puri Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
Tender for Prov. and Erection of 11 KV HT line to proposed 11/0.4 KV 63 KVA substation along with 3-Phase LT line and 1-ph to 3-ph LT Line Augmentation in village Kutharbeet (T.S. No. 25/2024-25) , Prov. 1-ph LT Extension to poultary farm in vill Go
2025_HPSEB_119566_1
NO/HED-234/2025-26
Open Tender
Electrical Works
Percentage
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹5,263
10 Nov 2025
3 Nov 2025
10 Nov 2025
3 Nov 2025
10 Nov 2025
3 Nov 2025
Erection Part of 11 KV HT Line (T.S. No. 25/2024-25)
Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Fixing jumper complete in all respect.
Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Erection Part of 11/0.4 KV, 63 KVA Transformer (T.S. No. 25/2024-25)
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer)
Erection Part of 3Ph LT Line (T.S. No. 25/2024-25)
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line =0.380km & 1-ph to 3-ph =0.190, complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part of 3Ph LT Line at vill Gondpur Jaichand (T.S. No. 79/2024-25)
Erection of LT line.Digging of pit of stay, Erection of PCC Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line =0.380km & 1-ph to 3-ph =0.190, complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part of 3Ph LT Line at vill Bhiderwal (0BD) (T.S. No. 88/2024-25)
Erection of LT line.Digging of pit of stay, Erection of PCC Pole 8mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line =0.380km & 1-ph to 3-ph =0.190, complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part of 3Ph LT Line at vill Dulehar (Near Ravidas Temple) (T.S. No. 78/2025-26)
Erection of LT line.Digging of pit of stay, Erection of PCC Pole 8mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line =0.380km & 1-ph to 3-ph =0.190, complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Supply Part of 11 KV HT Line
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate Supply by HPSEBL, (2 Each.)
Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor Supply by HPSEBL, (0.621 kms.)
Prov.G.I.Wire No. 8 SWG in mtr.Supply by HPSEBL, (21 kg.)
Prov. RCC Muff
Prov. concrete filling in RCC muff
Run Through Str. ( ∆) Formation on Singlr Pole Str.
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.11kv Pin Insulator with pin complete in all respect
Dead end Structure:
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.
Prov.11kv Pin Insulator with pin complete in all respect
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp
Prov.MS Full Clamp/stay
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov.11kv Stay set complete in all respect
Prov. Stay Wire HT (8 kg. per Stay Set)
Prov.11kv Earthing set complete in all respect.
Prov.11kv Danger Plate (250x200x1.6 mm) Supply by HPSEBL (2No.)
Prov. Aluminium Paint.
Prov. Red Oxide
Supply Part of 11/0.4 KV, 63 KVA Transformer
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA Supply by HPSEBL, (1 No.)
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) Supply by HPSEBL, (2Nos.)
Prov. RCC Muffs
Prov. concrete filling in RCC muff
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)
Prov. Pipe Earthing Set
Prov. 6 SWG GI wire For Earthing supply by HPSEBL (15Kg)
Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 100 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated)
Prov. Aluminium Thimble
Prov. Copper Thimble 200 Amp
Prov. Danger Plate Supply by HPSEBL, (1 No.)
Prov. Barbed Wire
Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box (CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 100 KVA Transformer
Prov. Aluminium Paint.
Prov. Red Oxide
Supply Part of 3-Phase LT Line (T.S. No. 25/2024-25)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage} Supply by HPSEBL, (1.920 Kms)
Prov. ST Pole9mtr.long alongwith baseplate complete in all respect. Supply by HPSEBL, (5 No.)
Prov. RCC Muff
Filling of RCC Muffs with concrete complete in all respect.
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m Supply by HPSEBL, (39 kg)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated)
Prov. Spiral PVC Spacer Supply by HPSEBL, (10 No.)
Prov. Aluminium Paint
Prov. Red Oxide
Supply Part of 3-Phase LT Line at vill Gondpur Jaichand (T.S. No. 79/2025-26)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}Supply by HPSEBL, (0.717 Kms)
Prov.PCC Pole 9mtr.long along with complete in all respect. Supply by HPSEBL, (5 No.)
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m Supply by HPSEBL, (36 kg)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated)
Prov. Spiral PVC Spacer Supply by HPSEBL, (10 No.)
Supply Part of 3Ph LT Line at vill Bhiderwal (0BD) (T.S. No. 88/2024-25)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}Supply by HPSEBL, (1.300 Kms)
Prov.PCC Pole 9mtr.long along with complete in all respect. Supply by HPSEBL, (5 No.)
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m Supply by HPSEBL, (33 kg)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated)
Prov. Spiral PVC Spacer
Supply Part of 3Ph LT Line at vill Dulehar (Near Ravidas Temple) (T.S. No. 78/2025-26)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}Supply by HPSEBL, (1.430 Kms)
Prov.PCC Pole 8mtr.long along with complete in all respect. Supply by HPSEBL, (7 No.)
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m Supply by HPSEBL, (36 Kg.)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated)
Prov. Spiral PVC Spacer Supply by HPSEBL, (14 No.)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_175062.xls
BOQ • 2.10 MB
additionaltermandcondition.pdf
Additional Documents • 0.68 MB
termandcondition.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .