Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 LAdmitted-Finance | ₹27.8 L | L1 | Admitted-Finance |
| 2 | L2₹35.0 L+₹7.1 L (25.5%)Admitted-Finance | ₹35.0 L+₹7.1 L (25.5%) | L2 | Admitted-Finance |
| 3 | L3₹35.0 L+₹7.1 L (25.6%)Admitted-Finance | ₹35.0 L+₹7.1 L (25.6%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SH MANZOOR AHMED WANI L3 | Bashir Wani Constructions Private Limited L2 | Riaz Ahmed L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 metres and lift upto 1.5 m, as directed by Engineer-in-Charge. | 353.32 | cum | 200 ₹70,664 Lowest | 300 ₹1,05,996 | 250 ₹88,330 |
| 2.00 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 136.96 | cum | 200 ₹27,392 Lowest | 250 ₹34,240 | 300 ₹41,088 |
| 3.00 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 24.12 | cum | 200 ₹4,824 Lowest | 250 ₹6,030 | 300 ₹7,236 |
| 4.00 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade. | 501.69 | sqm | 200 ₹1,00,338 | 100 ₹50,169 | 60 ₹30,101.4 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | 10.08 | cum | 5,000 ₹50,400 | 4,500 ₹45,360 | 4,000 ₹40,320 Lowest |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing andreinforcement. All works upto plinth level | 96.05 | cum | 8,500 ₹8,16,425 | 8,500 ₹8,16,425 | 8,000 ₹7,68,400 Lowest |
| 7.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | 12.53 | cum | 5,000 ₹62,650 Lowest | 5,000 ₹62,650 Lowest | 6,000 ₹75,180 |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 7,720 | kg | 105 ₹8,10,600 | 95 ₹7,33,400 | 90 ₹6,94,800 Lowest |
| 9.00 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 300 | kg | 145 ₹43,500 | 150 ₹45,000 | 120 ₹36,000 Lowest |
| 10.00 | Providing and laying autoclaved aerated cement blocks masonry with150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for separately). | 55.42 | cum | 12,000 ₹6,65,040 | 12,000 ₹6,65,040 | 8,500 ₹4,71,070 Lowest |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
20 Aug 2026, 12:00 pmClosed
EXECUTIVEV ENGINEER M AND H DIVISION DODA
KHELLANI DODA
Establishment of snow clearance control room and machinery yard at Bhaderwah
2026_PWDJK_320325_1
MHDD/TS/2026-27/32
Open Tender
Civil Works - Others
Turn-key
90 days
BHADERWAH
AS PER SBD
2 documents required · 2 mandatory
₹1,000
EXECUTIVEV ENGINEER M AND H DIVISION DODA
₹70,000
EXECUTIVE ENGINEER M AND H DIV DODA
21 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 metres and lift upto 1.5 m, as directed by Engineer-in-Charge. | 353.32 | cum | 100 | ₹35,332 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 136.96 | cum | 100 | ₹13,696 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 24.12 | cum | 100 | ₹2,412 |
| 4 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade. | 501.69 | sqm | 100 | ₹50,169 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | 10.08 | cum | 100 | ₹1,008 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing andreinforcement. All works upto plinth level | 96.05 | cum | 100 | ₹9,605 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | 12.53 | cum | 100 | ₹1,253 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 7,720 | kg | 100 | ₹7,72,000 |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 300 | kg | 100 | ₹30,000 |
| 10 | Providing and laying autoclaved aerated cement blocks masonry with150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for separately). | 55.42 | cum | 100 | ₹5,542 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1064594.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .