Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 CrAccepted-AOC 155 A KAIKATTIPUDUR TIRUPPUR ROAD AVINASHI 641654 | AVINASHI | TIRUPPUR | TAMIL NADU | 641654 | ₹15.2 Cr Quoted ₹15.8 Cr | L1 | Accepted-AOC plus two point five six percentage excess over the departmental value |
| 2 | L2₹17.1 CrRejected-Finance 5 5 313A S D LAYOUT TIRUPATHI ANDHRA PRADESH | TIRUPATHI | ANDHRA PRADESH | ₹17.1 Cr | L2 | Rejected-Finance Plus Fifteen point six nine percentage excess over the departmental value |
| 3 | L3₹19.2 CrRejected-Finance SAB JOHN THOTTAM OMALUR PO TK SALEM 636404 | SALEM | SALEM | TAMIL NADU | 636404 | ₹19.2 Cr | L3 | Rejected-Finance Plus thirty point zero three percentage excess over the departmental value |
| Sl No | Description | Qty | Unit | Ujwala Infratech (India) Pvt. Ltd., L2 | VR WATER INFRA COMPANY L1 | ANANTH CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00Providing 0.79 MLD water supply to Government Medical College and Hospital of Udhagamandalam in Nilgiris District with Earthen Dam Near Muthanadumandu, Thalaikundah as source - Full Deposit work. (Construction Period : 12 Months, Trial Run: 6 months and followed by Paid Maintenance Period : 5 years) | ||||||
| 1.01Head Works at Earthen Dam, Thalaikundah | ||||||
| 1.02 | Part -1(a) -Construction of 4.50 m dia Collection well cum pumphouse and connecting Pipes at Headworks | 1 | Job | 1,19,49,077.04 ₹1.2 Cr | 1,09,10,028.82 ₹1.1 Cr | 1,35,07,962.42 ₹1.4 Cr |
| 1.03 | Part -1(b) - Construction of Pump Operator Room of Size 8.00 m x 6.00 m | 1 | Job | 21,27,544.26 ₹21.3 L | 19,45,010.92 ₹19.5 L | 24,08,176.85 ₹24.1 L |
| 1.04 | Part -1(C ) -Construction of Coffer Dam and Flow Diversion arrangements | 1 | Job | 30,24,891 ₹30.2 L | 27,54,531 ₹27.5 L | 34,01,264 ₹34.0 L |
| 1.05 | Part - 1.d - Supply, delivery and erection of Vertical turbine Pumpsets - 948 lpm x 75 m at Collection well cum Pumphouse at Head works and allied works | 1 | Job | 49,50,683.8 ₹49.5 L | 47,35,317.44 ₹47.4 L | 55,96,364.06 ₹56.0 L |
| 1.06 | Part -1(e) - B.T Road Laying in Head Works | 1 | Job | 21,66,819.69 ₹21.7 L | 19,78,653.98 ₹19.8 L | 24,49,896.07 ₹24.5 L |
| 1.07 | Part -2- Supply, delivery, laying, Jointing & testing of 200 mm dia DI K9/ K7 Pipes & 200 mm HDPE PN 10/8/6 Pipes for Raw Water Main - Head works to WTP at Medical college campus | 1 | Job | 2,32,63,052.94 ₹2.3 Cr | 2,14,26,732.88 ₹2.1 Cr | 2,39,67,440.66 ₹2.4 Cr |
| 1.08Part -3- Water Treatment Plant- 0.91 MLD Capacity | ||||||
| 1.09 | Part -3(a) - Construction of Aerator | 1 | Job | 3,65,640.4 ₹3.7 L | 3,33,855.82 ₹3.3 L | 4,13,368 ₹4.1 L |
Tender Value
₹15 Cr
EMD Value
₹11.3 L
Closing Date
5 Jun 2025, 3:00 pmClosed
The Chief Engineer TWAD Board Coimbatore
The Chief Engineer, TWAD Board, No.30, Siruvani Nagar, Bharathipark Road, Coimbatore - 641 043
Providing 0.79 MLD water supply to Government Medical College and Hospital of Udhagamandalam in NilgirisDistrict with Earthen Dam Near Muthanadumandu Thalaikundah as source under Full Deposit work
2025_TWAD_561277_1
IFB_02_GMCUdhagai_2025
Open Tender
Civil Works
365 days
Government Medical College campus Udhagai
Refer Bid Document
4 documents required · 4 mandatory
₹0
₹11.3 L
Office of the Chief Engineer TWAD Board Coimbatore
4 Sept 2025
24 May 2025
6 Jun 2025
24 May 2025
5 Jun 2025
24 May 2025
24 May 2025 - 29 May 2025
29 May 2025
Amount
Providing 0.79 MLD water supply to Government Medical College and Hospital of Udhagamandalam in Nilgiris District with Earthen Dam Near Muthanadumandu, Thalaikundah as source - Full Deposit work. (Construction Period : 12 Months, Trial Run: 6 months and followed by Paid Maintenance Period : 5 years)
Head Works at Earthen Dam, Thalaikundah
Part -1(a) -Construction of 4.50 m dia Collection well cum pumphouse and connecting Pipes at Headworks
Part -1(b) - Construction of Pump Operator Room of Size 8.00 m x 6.00 m
Part -1(C ) -Construction of Coffer Dam and Flow Diversion arrangements
Part - 1.d - Supply, delivery and erection of Vertical turbine Pumpsets - 948 lpm x 75 m at Collection well cum Pumphouse at Head works and allied works
Part -1(e) - B.T Road Laying in Head Works
Part -2- Supply, delivery, laying, Jointing & testing of 200 mm dia DI K9/ K7 Pipes & 200 mm HDPE PN 10/8/6 Pipes for Raw Water Main - Head works to WTP at Medical college campus
Part -3- Water Treatment Plant- 0.91 MLD Capacity
Part -3(a) - Construction of Aerator
Part -3(b) -Construction of Slow Sand Filter of size 14.00 m x 7.00 m - 6 Beds) in Melkoranvankandi
Part -3(c) -Construction of 8.70 LL capacity Clear Water Reservoir at Water Treatment Plant
Part -3(d) - Supply, Delivery, Erection and Commissioning of 1206 lpm x 22 m Head Horizontal split casing Centrifugal Pumpset and allied works at Clear Water Sump at WTP Site
Part -3(e) -Construction of Pump Operator Room @ WTP of Size 8.00 m x 6.00 m
Part -3(f) -Construction of Chlorinator Room of size 6 x 4 x at Water Treatment Plant - 1 No
Part -3(g) -Construction of RCC Retaining wall in Water Treatment Plant Site (150 m)
Part -3(h) -Construction of Compound wall in Water Treatment Plant Site
Part -3(i) -B.T Road Laying in WTP
Part -3(j) -Mechanical & Electrical items in Treatment Plant
Part -3(k) -Pipe connection works for Treatment Plant
Part -4 -Supply, delivery, laying, Jointing & testing of 200/150/100 mm dia DI K7 Pipes for Clear Water Pumping Main - Clear Water Reservoir to Existing Sump & Proposed Sump
Part -5 -Construction of 2.00 LL Sump at WTP at Govt.Medical College campus At Udhagamandalam
Part -6 -Maintenance of the Scheme for a period of Five Years(60 months) (Paid maintenance)
Total Amount
Add GST @ 18%
Ujwala Infratech (India) Pvt. Ltd., (BID ID -1359501)
ANANTH CONSTRUCTIONS (BID ID -1358287)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid