| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Quoted Lowest rate and Executed Agreement on 16.08.2024 |
| 2 | L2₹1.2 Cr+₹6.0 L (5.03%)Rejected-AOC | ₹1.2 Cr+₹6.0 L (5.03%) | L2 | Rejected-AOC L2 Hence Rejected |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
12 Jul 2024, 3:00 pmClosed
Additional Collector (Dev),DRDA,Thoothukudi
DRDA, Thoothukudi
Thoothukudi District- MGSMT 2024-25 Improvements to 3 No of Roads in Alwarthirunagari Block Package No.TN/Tut-07/2024-25
2024_RDTN_459593_5
DRDPR, Chennai LrNo. DIPR/2074/Tender/24 dt.26.06.24
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹1.2 L
DRDA, Thoothukudi
13 Sept 2024
3 Jul 2024
12 Jul 2024
3 Jul 2024
12 Jul 2024
6 Jul 2024
5 Jul 2024
Amount
Strengthening of Kurippenkulam - Chinnamadankudiyruppu vepankulam road 0/0-0/660
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 Km 0/0-0/660
Picking the existing worn out BT surface including all labour charges etc complete Km 0/0-0/660
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A Km 0/0-0/660
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. Km 0/0-0/660
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete Km 0/0-0/660
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-0/660
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10Square Metre for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., Km 0/0-0/660
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13 Cum of 19.00-9.50mm. 0.17 Cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0/0-0/660
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per Square Metre area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Km 0/0-0/660
HM Stone
Sign Board (1 Curve 2nos )
Name board cum Citizen information Board
Construction of 5.00 m span RCC Slab Culvert at ch 430 m
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B
Collection and supply of Gritty Gravel filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1: 4: 8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.
cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete
Supplying and erecting water tight steel shuttering to centering including necessary supports for plane surface in Foundation and Basement for RCC Columns, Footings, Plinth beams, bed blocks, staircase steps etc., using suitable mild steel sheets etc., complete.
Below and Above sill level Without Strutting
Above sill level With Strutting
cement concrete 1:2:4 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Bed Block over Abutment and Piers
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Strengthening of Pirandakulam Ramaneri Road 0/0 - 1/0
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 Km 0/0-1/0
Picking the existing worn out BT surface including all labour charges etc complete Km 0/0-1/0
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A Km 0/0-1/0
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. Km 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete Km 0/0-1/0
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-1/0
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10Square Metre for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc. Km 0/0-1/0
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13 Cum of 19.00-9.50mm. 0.17 Cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0/0-1/0
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per Square Metre area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Km 0/0-1/0
HM Stone
KM Stone
Sign Board (1 Curve 2nos )
Nameboard cum Citizen information Board
Strengthening of Puliyankulam North Elamalkulam Road Km 0/0 - 1/650
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.Km 0/0 - 1/650
Picking the existing worn out BT surface including all labour charges etc complete Km 0/850 - 1/650
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A Km 0/0 - 1/650
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.Km 0/850 - 1/650
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/850 - 1/650
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10Square Metre for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., Km 0/850 - 1/650
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion, labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. Km 0/0-0/850
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13 Cum of 19.00-9.50mm. 0.17 Cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0/0 - 1/650
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per Square Metre area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Km 0/0 - 1/650
HM Stone
KM Stone
Nameboard cum Citizen information Board
Sign Board (1 Curve 2nos )
Construction of 1.5 m span RCC Slab Culvert at ch 1210 m
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B
Cement concrete 1: 4: 8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.
Supplying and erecting water tight steel shuttering to centering including necessary supports for plane surface in Foundation and Basement for RCC Columns, Footings, Plinth beams, bed blocks, staircase steps etc., using suitable mild steel sheets etc., complete.
Below sill level Without Strutting
Above sill level Without Strutting
Above sill level With Strutting
cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete
cement concrete 1:2:4 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Bed Block over Abutment and Piers
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Alexander (BID ID -1077818)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .