Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.8 Cr
EMD Value
₹11.2 L
Closing Date
19 Mar 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E., Hamirpur Circle PWD Hamirpur
S.E., Hamirpur Circle PWD Hamirpur
New Construction work of village Bari to Bhatewar link road
2026_CEBAN_1123751_1
463/30C-Hamirpur Circle/2025-26 Date 28.02.2026
Open Tender
Civil Works - Roads
Percentage
365 days
PD PWD Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹11.2 L
S.E., Hamirpur Circle PWD Hamirpur
20 Mar 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
17 Mar 2026
Clearing jungle including uprooting trunk vegetation grass,bush wood trees and saplings of girth upto 30cm meassured at a height of 1 mtr. above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. (S.I. No-259)
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil)
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete.
Cement treated subbase Providing, laying, spreading Material on prepared sub grade adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength to form a layer of subbase.
cement treated Base Providing, laying, spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength to form a layer of base.
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503.
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - I By Manual Means (I)Bitumen (S-90)
Seal Coat Providing and laying seal coat by Manual Means with VG-10 Grade Bitument sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete.
Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.S.I. No-251.
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work.S.I. No-255
Plain/Reinforced Cement Concrete in open foundation complete as per Drawing and Technical Specifications.PCC Grade M-15(40 mm) using batching plan & manual placing (1:2:4)
Stone Masonry work in cement Mortar 1:3 in foundation complete as per drawing and Technical specifications. (RCR)
RCC Grade M20 using batching plant transit mixer & Manual placing (1:1.5:3)
Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications Clauses1002,1010 and 1202
Providing and laying feinforced cement concrete in superstructrure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (PCC 1:2:4)
Pointing with cement mortar (1:3) on brick work in sub- structure as per Technical Specificaton
Plaster with cement mortar (1:4) 15mm thick on brick work in subsructrure as per technical specification clauses 613.4 and 1204
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less then 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
Providing weep holes in Brick asonry/ plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV : 20H towards drawing face. Complete as per drawing and Technical specifications
Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (1:3:6)
Providing and laying reinforced Cement Concrete Pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets Clause 1106.
Providing and laying reinforced Cement Concrete Pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets Clause 1106. (600 mm dia)
Providing and laying reinforced Cement Concrete Pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets Clause 1106. (350 mm dia)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 (Km stone)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 (Hectometer stone)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 1st year (@0.00 % of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 2st year (@0.75 % of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 3st year (@1.5 % of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 4st year (@2.25 % of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work Maintenance cost for 5st year (@3 % of total work amount S.No.1-25)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.23 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_2.pdf
PDF • 0.96 MB
BOQ_2093696.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .