Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-Finance | ₹29.4 L | L1 | Accepted-Finance Accepted being L1 |
| 2 | L3₹32.4 LAccepted-Finance 227 2 5TH B MAIN ROAD 2ND BLOCK HRBR LAYOUT KALYAN NAGAR BANASAWADI BANGALORE 560 043 | BENGALURU URBAN | KARNATAKA | 560043 | ₹32.4 L | L3 | Accepted-Finance Rejected. Quoted rates are higher than L1 |
| 3 | L2₹30.6 LRejected-Finance 66 C O J R NAICKER ASWATHNAGAR SANJAYNAGAR P O BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹30.6 L | L2 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 4 | L4₹32.7 LRejected-Finance 01 BANSAROLA BANSAROLA BANSAROLA BEED MAHARASHTRA 431518 UDYAM MH 05 0080897 | BEED | MAHARASHTRA | 431518 | ₹32.7 L | L4 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 5 | L5₹33.0 LRejected-Finance 37 4TH CROSS ASHWATHNAGAR SANJYANAGAR POST BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹33.0 L | L5 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| Sl No | Description | Qty | Unit | GKR and CO L18 | mahadevi Enterprises L13 | OM ENTERPRISES L2 | Neptune Engineers and Builders L16 | M/s BHOOMI ELECTRICALS L3 | A.GOVINDARAJ L8 | G.M.R.& CO L7 | ARATHEERTHA CONCEPTS L1 | Maruthi constructions L11 | M/S Shiv Shakti Enterprises L12 | ARUNOTHAYA TRADERS L15 | M/S SRI BALAJI ENTERPRISES L17 | M/S MEGHA ENGINEERS L14 | SREE BUILDERS L10 | M/S J S PRAKASAM L5 | SRI GANESH ENTERPRISES L6 | raashi constructions L9 | NORTH INDIA PEST CONTROL L19 | SHREE ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) complete all as specified and directed. | 6.75 | Cum | 760 ₹5,130 | 675 ₹4,556.25 | 750 ₹5,062.5 | 435 ₹2,936.25 | 525 ₹3,543.75 | 650 ₹4,387.5 | 1,001 ₹6,756.75 | 605 ₹4,083.75 | 700 ₹4,725 | 450 ₹3,037.5 | 520 ₹3,510 | 800 ₹5,400 | 481 ₹3,246.75 | 640 ₹4,320 | 910 ₹6,142.5 | 400 ₹2,700 Lowest | 475 ₹3,206.25 | 500 ₹3,375 | 450 ₹3,037.5 |
| 2.00 | Excavation in trenches n'exc 1.5m wide and n'exc 1.5 mtr depth for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. nexc 10 sq m on plan of for sewage pipe line and manhole etc and getting out in hard/dense soil complete all as specified and directed. | 23 | Cum | 350 ₹8,050 | 650 ₹14,950 | 450 ₹10,350 | 400 ₹9,200 | 285 ₹6,555 | 600 ₹13,800 | 819 ₹18,837 | 325 ₹7,475 | 410 ₹9,430 | 550 ₹12,650 | 500 ₹11,500 | 520 ₹11,960 | 374 ₹8,602 | 545 ₹12,535 | 745 ₹17,135 | 300 ₹6,900 | 250 ₹5,750 Lowest | 500 ₹11,500 | 350 ₹8,050 |
| 3.00 | Returning, filling incl spreading, levelling watering and well ramming in layers n'exc 25cm complete all as specified and directed. | 33 | Cum | 250 ₹8,250 | 105 ₹3,465 | 120 ₹3,960 | 140 ₹4,620 | 200 ₹6,600 | 150 ₹4,950 | 126 ₹4,158 | 85 ₹2,805 Lowest | 155 ₹5,115 | 150 ₹4,950 | 100 ₹3,300 | 125 ₹4,125 | 192 ₹6,336 | 155 ₹5,115 | 115 ₹3,795 | 240 ₹7,920 | 195 ₹6,435 | 160 ₹5,280 | 180 ₹5,940 |
| 4.00 | Removing excavated material to a distance not exceeding 50m and depositing where directed at a level not exc 1.50m above the starting point complete all as specified and directed. | 60 | Cum | 485 ₹29,100 | 350 ₹21,000 | 350 ₹21,000 | 310 ₹18,600 | 370 ₹22,200 | 350 ₹21,000 | 274 ₹16,440 | 85 ₹5,100 Lowest | 315 ₹18,900 | 500 ₹30,000 | 300 ₹18,000 | 325 ₹19,500 | 411 ₹24,660 | 355 ₹21,300 | 250 ₹15,000 | 195 ₹11,700 | 278 ₹16,680 | 300 ₹18,000 | 385 ₹23,100 |
| 5.00 | Formwork to sides of concrete foundations, footings, bases of columns, rafts, plinth beam and similar work;vertical or to batter complete all as specified and as directed. | 44.79 | Sqm | 550 ₹24,634.5 | 398 ₹17,826.42 | 450 ₹20,155.5 | 300 ₹13,437 | 650 ₹29,113.5 | 300 ₹13,437 | 440 ₹19,707.6 | 355 ₹15,900.45 | 425 ₹19,035.75 | 300 ₹13,437 | 325 ₹14,556.75 | 355 ₹15,900.45 | 652 ₹29,203.08 | 400 ₹17,916 | 400 ₹17,916 | 298 ₹13,347.42 Lowest | 550 ₹24,634.5 | 350 ₹15,676.5 | 610 ₹27,321.9 |
| 6.00 | M&L RCC M25 (20mm graded aggregate) for foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, lintel beams etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 3.5 | Cum | 8,515 ₹29,802.5 | 8,125 ₹28,437.5 | 7,500 ₹26,250 | 9,350 ₹32,725 | 5,500 ₹19,250 Lowest | 9,000 ₹31,500 | 6,600 ₹23,100 | 7,855 ₹27,492.5 | 7,200 ₹25,200 | 9,600 ₹33,600 | 8,500 ₹29,750 | 9,500 ₹33,250 | 7,355 ₹25,742.5 | 7,500 ₹26,250 | 7,350 ₹25,725 | 5,896 ₹20,636 | 9,258 ₹32,403 | 9,500 ₹33,250 | 6,874 ₹24,059 |
| 7.00 | Formwork to sides of pillars,posts, struts, piers, columns and stanchions for rough finished surfaces of concrete square, rectangular shape complete all as specified and as directed. | 33 | Sqm | 560 ₹18,480 | 398 ₹13,134 | 450 ₹14,850 | 450 ₹14,850 | 650 ₹21,450 | 350 ₹11,550 | 440 ₹14,520 | 455 ₹15,015 | 315 ₹10,395 | 450 ₹14,850 | 400 ₹13,200 | 450 ₹14,850 | 652 ₹21,516 | 830 ₹27,390 | 400 ₹13,200 | 298 ₹9,834 Lowest | 550 ₹18,150 | 400 ₹13,200 | 610 ₹20,130 |
| 8.00 | M&L RCC M25 (20mm graded aggregate) for columns, pillars, piers , posts and struts and complete all as specified and as directed. | 3.25 | Cum | 7,750 ₹25,187.5 | 10,450 ₹33,962.5 | 8,500 ₹27,625 | 9,300 ₹30,225 | 11,785 ₹38,301.25 | 9,000 ₹29,250 | 16,940 ₹55,055 | 7,855 ₹25,528.75 | 9,400 ₹30,550 | 9,500 ₹30,875 | 9,000 ₹29,250 | 9,500 ₹30,875 | 12,474 ₹40,540.5 | 7,500 ₹24,375 Lowest | 11,500 ₹37,375 | 12,450 ₹40,462.5 | 9,150 ₹29,737.5 | 9,200 ₹29,900 | 11,658 ₹37,888.5 |
| 9.00 | TMT bars 10mm dia & over cut to length bent to shape required including cranking bending spirally for hoping for columns hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed | 1,235 | Kg | 190 ₹2,34,650 | 95 ₹1,17,325 | 120 ₹1,48,200 | 350 ₹4,32,250 | 185 ₹2,28,475 | 180 ₹2,22,300 | 132 ₹1,63,020 | 95 ₹1,17,325 | 100 ₹1,23,500 | 250 ₹3,08,750 | 190 ₹2,34,650 | 220 ₹2,71,700 | 85 ₹1,04,975 Lowest | 100 ₹1,23,500 | 120 ₹1,48,200 | 136 ₹1,67,960 | 221 ₹2,72,935 | 155 ₹1,91,425 | 200 ₹2,47,000 |
| 10.00 | Ditto Ser No. 9 above but 5mm dia and over upto and including 10mm dia as in stirrups, spacers and binders complete all as specified and as directed. | 175 | Kg | 230 ₹40,250 | 105 ₹18,375 | 120 ₹21,000 | 230 ₹40,250 | 200 ₹35,000 | 130 ₹22,750 | 126 ₹22,050 | 95 ₹16,625 | 105 ₹18,375 | 200 ₹35,000 | 180 ₹31,500 | 140 ₹24,500 | 85 ₹14,875 Lowest | 100 ₹17,500 | 115 ₹20,125 | 135 ₹23,625 | 195 ₹34,125 | 155 ₹27,125 | 180 ₹31,500 |
Tender Value
Refer Docs
EMD Value
₹59,500
Closing Date
21 Aug 2026, 6:00 pmClosed
Garrison Engineer M AF Jalahalli
Garrison Engineer M AF Jalahalli Bangalore 560013
SPECIAL REPAIR TO SHEDS AT CERTAIN LOCATIONS AT AFTC AND PROVN OF ARTIFICIAL RECHARGE UNITS FOR BOREWELL AT CQAE WE
2026_MES_782158_1
8371/E8
Open Tender
Civil Works
Item Rate
120 days
Garrison Engineer M AF Jaalahalli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Garrison Engineer M AF Jalahalli
₹59,500
Yes
28 Aug 2026
31 Jul 2026
28 Aug 2026
31 Jul 2026
21 Aug 2026
14 Aug 2026
31 Jul 2026 - 7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) complete all as specified and directed. | 6.75 | Cum | - | - |
| 2 | Excavation in trenches n'exc 1.5m wide and n'exc 1.5 mtr depth for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. nexc 10 sq m on plan of for sewage pipe line and manhole etc and getting out in hard/dense soil complete all as specified and directed. | 23 | Cum | - | - |
| 3 | Returning, filling incl spreading, levelling watering and well ramming in layers n'exc 25cm complete all as specified and directed. | 33 | Cum | - | - |
| 4 | Removing excavated material to a distance not exceeding 50m and depositing where directed at a level not exc 1.50m above the starting point complete all as specified and directed. | 60 | Cum | - | - |
| 5 | Formwork to sides of concrete foundations, footings, bases of columns, rafts, plinth beam and similar work;vertical or to batter complete all as specified and as directed. | 44.79 | Sqm | - | - |
| 6 | M&L RCC M25 (20mm graded aggregate) for foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, lintel beams etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 3.5 | Cum | - | - |
| 7 | Formwork to sides of pillars,posts, struts, piers, columns and stanchions for rough finished surfaces of concrete square, rectangular shape complete all as specified and as directed. | 33 | Sqm | - | - |
| 8 | M&L RCC M25 (20mm graded aggregate) for columns, pillars, piers , posts and struts and complete all as specified and as directed. | 3.25 | Cum | - | - |
| 9 | TMT bars 10mm dia & over cut to length bent to shape required including cranking bending spirally for hoping for columns hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed | 1,235 | Kg | - | - |
| 10 | Ditto Ser No. 9 above but 5mm dia and over upto and including 10mm dia as in stirrups, spacers and binders complete all as specified and as directed. | 175 | Kg | - | - |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
8371GENPAGE.pdf
Tender Documents • 0.44 MB
BOQ_876237.xls
BOQ • 0.29 MB
8371PS.pdf
Additional Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].