| 1 | L1₹25.6 LAccepted-AOC ALIGARH UTTAR PRADESH UP | ALIGARH | UTTAR PRADESH | 202001 | ₹25.6 L | L1 | Accepted-AOC accepted L1 |
| 2 | L2₹25.7 LRejected-Finance 5 136 PRABHA NAGAR MELROSE BYPASS G T ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹25.7 L | L2 | Rejected-Finance Reject L2 |
| 3 | L3₹29.4 LRejected-Finance ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹29.4 L | L3 | Rejected-Finance Reject L3 |
| 4 | L4₹30.3 LRejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹30.3 L | L4 | Rejected-Finance Reject L4 |
Tender Value
₹30.8 L
EMD Value
₹3.1 L
Closing Date
31 Jan 2026, 12:00 pmClosed
EE PD PWD ALIGARH
EE PD PWD ALIGARH
Maintenance work of Kali River Bridge located at Km-13 of Chhatari-Atrauli-Kasganj Road (SH-105) in Aligarh district
2026_CEALG_1108616_1
5514-13A dt-31-12-2026
Open Tender
Civil Works - Bridges
60 days
OFFICE OF THE EE PD PWD ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹3.1 L
Yes
11 May 2026
23 Jan 2026
31 Jan 2026
23 Jan 2026
31 Jan 2026
23 Jan 2026
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.As per DSR-2023 (CH-10,SI.10.1) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 (As Per Mort&H Clause Sl. 12.08) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted earth 2 km. As per Mort&H Clause 305 S.No.3.18 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Clause 2504 (As Per Mort&H Sl. 16.05) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications Clause 2504 (As Per Mort&H Sl. 16.04) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. As per Clause 16.01 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Construction of KC Drain & Chute Drain as per drawing :- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavated portion.Depth up to 3.0m (As Per Mort&H Clause Sl. 3.13/304B) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge. For Construction of KC Drain & Chute Drain as per drawing :-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (MoRTH Sl.No. 12.04) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge. For Construction of KC Drain & Chute Drain as per drawing :-
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications (Mort&h Sl.No. 13.1) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge. For Construction of KC Drain & Chute Drain as per drawing :-
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications. As per Morth (13.02) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge. For Construction of KC Drain & Chute Drain as per drawing :-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M15) (Mort&h Sl.No. 12.8) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge. For Construction of KC Drain & Chute Drain as per drawing :-
Painting Steel work with Deluxe Multi Surface Paint to give an even shade Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 Itr/10 sqm of approved brand and manufacture. As per DSR-2023 item no.13.48.3 & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS : 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 19 percent extra for laps and joints laid with stone boulders weighing not less than 40 Kg each (As Per Mort&H Clause Sl. 16.02) & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC :67-2012 made of high intensity grade sheeting type-IV vide clause 801.3, fixed over aluminium sheeting 1.5 mm thick supported on a mild steel angle iron post 75 mm×75 mm×6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm×45 cm×60 cm. 60 cm below ground level as per approved drawing. The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International/Government Laboratory Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D 4956-09) on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67.2012. Legends, letters, numerals and borders etc should be as per MORTH specification No-801.3.7. Proof of the same in form of government report shall be uploaded while quoting tender (CH-6 SI.No.18) x)30 cm × 90 cm (Left/Right) Object Hazard & including cost of all material, labour, T&P, labour cess,Royalty, ISTP and all other taxes but excluding G.S.T. For Proper Completion of work as per direction of Engineer Incharge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_2046761.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid