Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,960
Closing Date
31 Aug 2026, 6:55 pm6d left
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_321341_6
e-NIT No. 74 of REW Poonch 2026-27 Dated 18-08-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹2,960
18 Aug 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil : | 10.91 | cum | 256.85 | ₹2,802.23 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.33 | cum | 4,826.5 | ₹1,592.75 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) with 30% stones | 8.85 | cum | 4,294.37 | ₹38,005.17 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.26 | cum | 7,571.55 | ₹32,254.8 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.76 | sqm | 7,788.4 | ₹5,919.18 |
| 6 | Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes testing of joints complete as per direction of Engineer-incharge. PN-16 pipe, 16mm OD(SDR-7.4) | 5 | rmt | 205.8 | ₹1,029 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 45.48 | kg | 123.15 | ₹5,600.86 |
| 8 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 38.92 | sqm | 266.2 | ₹10,360.5 |
| 9 | 6 mm cement plaster 1 : 3 (1 cement : 3 fine sand) | 2.32 | sqm | 241.25 | ₹559.7 |
| 10 | Providing and fixing PVC Pipe ( 75MM/100MM) | 5 | Mtr | 300 | ₹1,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_1073086.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].