Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.0 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹15.1 L+₹7,412 (0.49%)Rejected-Finance | 2 | Rejected-Finance not lowest bid |
Tender Value
₹21.1 L
EMD Value
₹42,000
Closing Date
17 May 2023, 9:00 amClosed
Executive Engineer Bist Doab Canal Division
Executive Engineer Bist Doab Canal Division
Estimate For Construction Of 5no. Cattle Ghats On Bist Doab Canal
2023_WR_101044_1
BDD/BDC/2023-24/1
Open Tender
Civil Works - Canal
Item Rate
20 days
Nawanshaher
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹42,000
Yes
18 Jan 2024
21 Apr 2023
17 May 2023
21 Apr 2023
17 May 2023
21 Apr 2023
Amount
RD 40150 DISMANTLING OF CONCRETE (CEMENT CONCRETE PLAIN 1:2:4)
Laying of Dry Brick Ballast 40 mm gauge for flooring.
Dry brick on edge paving sand grouted over 50mm thick rammed brick aggregate 40mm gauge
Cement concrete 1:8:16 . With brick ballast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Cement concrete 1:4:8 with brick balast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth
Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (disposal/carraige from 0 upto 450m)
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres
RD 79630 DISMANTLING OF CONCRETE (CEMENT CONCRETE PLAIN 1:2:4)
Laying of Dry Brick Ballast 40 mm gauge for flooring.
Dry brick on edge paving sand grouted over 50mm thick rammed brick aggregate 40mm gauge
Cement concrete 1:8:16 . With brick ballast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Cement concrete 1:4:8 with brick balast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth
Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (disposal/carraige from 0 upto 450m)
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres
RD 83400 DISMANTLING OF CONCRETE (CEMENT CONCRETE PLAIN 1:2:4)
Laying of Dry Brick Ballast 40 mm gauge for flooring.
Dry brick on edge paving sand grouted over 50mm thick rammed brick aggregate 40mm gauge
Cement concrete 1:8:16 . With brick ballast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Cement concrete 1:4:8 with brick balast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth
Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (disposal/carraige from 0 upto 450m)
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres
RD 114800 DISMANTLING OF CONCRETE (CEMENT CONCRETE PLAIN 1:2:4)
Laying of Dry Brick Ballast 40 mm gauge for flooring.
Dry brick on edge paving sand grouted over 50mm thick rammed brick aggregate 40mm gauge
Cement concrete 1:8:16 . With brick ballast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Cement concrete 1:4:8 with brick balast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth
Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (disposal/carraige from 0 upto 450m)
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres
RD 122000 DISMANTLING OF CONCRETE (CEMENT CONCRETE PLAIN 1:2:4)
Laying of Dry Brick Ballast 40 mm gauge for flooring.
Dry brick on edge paving sand grouted over 50mm thick rammed brick aggregate 40mm gauge
Cement concrete 1:8:16 . With brick ballast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Cement concrete 1:4:8 with brick balast 40mm gauge mixing by mechanical means using concrete mixer volumetric type
First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth
Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads (disposal/carraige from 0 upto 450m)
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres
Any Other Item
THE SUTLEJ COOP L AND C SOCIETY LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .