Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.9 L
EMD Value
₹4,000
Closing Date
28 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
D.G.(S_D)
5, S.N. BANERJEE ROAD Kolkata-700 013
REMOVAL OF SILT, ROM NIKASHI DRAIN NEAR 66/C, BANERJEE PARA ROAD IN WARD NO.132 UNDRE BR. XIV.
2026_KMC_1045761_1
S_D/S-II/XIV/132/05/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
BANERJEE PARA ROAD IN WARD NO.132
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,000
13 Oct 2026
13 Oct 2026
30 Oct 2026
13 Oct 2026
28 Oct 2026
13 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.24.Supplying to
site empty cement polythene bags (capacity 50kg) in good condition
including stacking, incedental charges etc. all complete (capacity 50
kg). | 250 | EACH | 6 | ₹1,500 |
| 2 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.29.Dumping in
position earth / sand filled gunny / poly bags (capacity 50kg) within a
lead of 30 metre inclusive of all lifts. | 250 | EACH BAG | 3 | ₹750 |
| 3 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.27.Labour
charges for filling empty cement gunny bag / polythene bag (capacity
50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone /
brick) and sewing as done in case of cement bags ,( tying with a knot
after filling will not be accepted ) , and stacking within a lead of 30
metre as per direction of Engr-in-charge (cost is excluding the cost of
any types of filling materials). NB:- Volume of earth/ sand filled bags
should not be less than 0.028 cum/bag | 250 | EACH | 7 | ₹1,750 |
| 4 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.32.Removing
earth/sand filled poly bags/gunny bags from the channel bed/slope
and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then
disposing off the same at a distance not less than 150 metre from the
channel site. | 250 | EACH BAG | 6 | ₹1,500 |
| 5 | MATERIALS AND LABOUR 1. Building (A) Materials delivered and
stacked at site: 6)d)Silver Sand. Note: 1. The above rates are
inclusive of all charges such as Royalty, Supervision Charges, etc.
and also include allowance for sinkage, as applicable, and/or
shrinkage and 10% Contractor?s Profit but exclusive of GST
2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at
site and no other costs need to be considered. For other items,
necessary loading-unloading & carriage charges are admissible.
3. Laterrite Boulder &Moorum are available in the districts as
mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may
add necessary carriage cost as applicable. (6th Corrigenda &
addenda dated 29.07.2019) | 7 | CUBIC METER | 800 | ₹5,600 |
| 6 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps
including all leads, lifts and making all arrangements of disposal.
where continuous flow of water from a source other than natural or
ground water is encountered in case of emergency maintenance
works related to leakage. breakage and making wet connections.
[Note ;- In case of any other situation demanding such emergency
dewatering. use of this item is to be approved by the Superintending
Engineer/Tender Accepting Authority. This item shall be executed on
the specific direction duly supported by proper clarification of the
E.I.C. who will be satisfied in absolute discretion that such work has
not been necessitated due to any natural source of water or any fault
of the Contractor] | 2,400 | HP | 33 | ₹79,200 |
| 7 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. from
box drain/ covered nikashi etc. by mathor labour after removing
concrete slab / manhole cover etc.without damaging the same and
refixing the same properly after cleaning as necessary and removing
the sludge etc. by using iron pans,buckets including all labour, tools &
plants including expulsion of impure / inflammable / asphyxiating
gases from the drains etc. and removing the spoils in dry condition
and disposing the same by truck beyond the area of Municipal
Corporation / Municipality / Notified Area Authority / Industrial
Township Authority etc. for such disposal including the cost of
loading, unloading, transportation and making arrangement of
necessary land for disposal, spreading and leveling as necessary etc.
and cleaning the road side in all respects, complete as per direction
of the Engineer- in-Charge. (Land for disposal to be arranged by the
contractor). (Payment will be made on the basis of actual stack
measurment of spoils in dry condition at roadsid(e) For Day : | 100.2 | CUBIC METER | 806 | ₹80,759.59 |
| 8 | Cleaning of floating materials / garbage / any other foul materials from
incoming sewer of drainage pumping station / adjoining penstock gate
/ open Nikashi / Lock Gate at Canal etc.by mathor labour after
removing concrete slab / manhole cover etc.without damaging the
same and refixing the same properly after cleaning as necessary and
removing the sludge etc. by using iron pans,buckets including all
labour, tools & plants including expulsion of impure / inflammable /
asphyxiating gases from the drains etc. and removing the spoils in dry condition and disposing the same by truck beyond the area of
Municipal Corporation / Municipality / Notified Area Authority /
Industrial Township Authority etc. for such disposal including the cost
of loading, unloading, transportation and making arrangement of
necessary land for disposal, spreading and leveling as necessary etc.
and cleaning the road side in all respects, complete as per direction
of the Engineer- in-Charge. (Land for disposal to be arranged by the
contractor). (Payment will be made on the basis of actual stack
measurment of spoils in dry condition at roadsid(e). | 7.37 | CUBIC METER | 877 | ₹6,461.3 |
| 9 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. from
road side masonary open drain/ nikashi etc. by mathor labour after
removing concrete slab / manhole cover etc.without damaging the
same and refixing the same properly after cleaning as necessary and
removing the sludge etc. by using iron pans,buckets including all
labour, tools & plants including expulsion of impure / inflammable /
asphyxiating gases from the drains etc. and removing the spoils in dry
condition and disposing the same by truck beyond the area of
Municipal Corporation / Municipality / Notified Area Authority /
Industrial Township Authority etc. for such disposal including the cost
of loading, unloading, transportation and making arrangement of
necessary land for disposal, spreading and leveling as necessary etc.
and cleaning the road side in all respects, complete as per direction
of the Engineer- in-Charge. (Land for disposal to be arranged by the
contractor).(Payment will be made on the basis of actual stack
measurment of spoils in dry condition at roadsid(e) For Day : | 18.9 | CUBIC METER | 735 | ₹13,891.5 |
| 10 | Sub Total | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_2563278.xls
BOQ • 0.35 MB
form.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .