Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94,700 Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | ₹94,700 | L1 | - |
| 2 | L2₹98,500+₹3,800 (4.01%) Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | ₹98,500+₹3,800 (4.01%) | L2 | - |
| 3 | L3₹1.0 L+₹6,800 (7.18%) Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | ₹1.0 L+₹6,800 (7.18%) | L3 | - |
| 4 | L4₹1.4 L+₹43,300 (45.7%) Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | ₹1.4 L+₹43,300 (45.7%) | L4 | - |
| 5 | L5₹1.4 L+₹44,540 (47.0%) Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow. | ₹1.4 L+₹44,540 (47.0%) | L5 | - |
| Sl No | Description | Qty | Unit | Allied engineers ed 54 a pitampura delhi -110034 L6 | GEOTECH TECHNICAL ASSOCIATES PRIVATE LIMITED L3 | GTECH CONSULTANCY SERVICES L2 | Geotechnical Consultancy Services L4 | M/s R.K. Enterprises L5 | Royal Engineers & Construction L7 | A4 TESTING LAB PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| - | a) 0.00 to 10.0m (6x10) | 60 | metre | 800 ₹48,000 | 650 ₹39,000 | 600 ₹36,000 | 700 ₹42,000 | 826 ₹49,560 | 987 ₹59,220 | 480 ₹28,800 Lowest |
| - | b)10 to 25 (6x15) | 90 | metre | 800 ₹72,000 | 650 ₹58,500 | 650 ₹58,500 | 900 ₹81,000 | 944 ₹84,960 | 987 ₹88,830 | 590 ₹53,100 Lowest |
| 2 | Mobilization of necessary plant, equipment, men and material of the complete geotechnical investigation and survey work as per specification, drawing and instructions of the engineer-in-charges and complete the same with in stipulated time. | 1 | job | 20,000 ₹20,000 | 4,000 ₹4,000 Lowest | 4,000 ₹4,000 Lowest | 15,000 ₹15,000 | 4,720 ₹4,720 | 5,000 ₹5,000 | 12,800 ₹12,800 |
Tender Value
₹1.6 L
EMD Value
₹3,160
Closing Date
11 Oct 2024, 4:00 pmClosed
AE-C-1
Assistant Engineer
Civil seva kendriya Bhawan Aliganj Lucknow
Soil Investigation of proposed Separated Family Accommodation (SFA) Phase -II, C.G. City, Gomti Nagar, Lucknow.
90440
33/EE/LKO-II/2024-25/04/AE/LSD-I/2024-25
OPEN
Survey Works
NCB
15 days
Lucknow, Uttar Pradesh
7 documents required · 7 mandatory
₹3,160
Not Applicable
11 Oct 2024
4 Oct 2024
11 Oct 2024
11 Oct 2024
11 Oct 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT33_SOIL+TESTTING.pdf
document • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .