Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
10 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
Chief Construction Engineer
Office of CCE, BHIP, Dasapalla, Nayagarh
Construction for Spl. LAO and PD (R and R) Brutanga Irrigation Project Office building , at - Dasapalla , under Brutanga Irrigation Division , Dasapalla , District - Nayagarh (G.F,F.F , T.F) (Civil, PH , Electrical)
2026_CCEBH_132363_1
CCE-BHIP-BID-04(01)/2026-27 Dt.12.06.2026
National Competitive Bid
Civil Works - Buildings
330 days
Dasapalla
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.5 L
Yes
19 Jun 2026
19 Jun 2026
13 Jul 2026
19 Jun 2026
10 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil or gravelly soil including moorum stoney earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and leveling the bed upto the required depth and depositing the excavated materials away from the work site with all lead and lift including shoring, shuttering & dewatering (if required) with cost of all Labour, Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. | 704.81 | Cum | 282.9 | ₹1,99,390.75 | BI01010001010000000000000515BI0100001113 |
| 2 | Supplying, Diluting & Spreading Chemical Emulsion like CHLORPYRIPHOS OR Other Chemical approved by the Central Insecticides Board as directed by the manufacturer and spraying the mixture uniformly by the sprayer as preconstructional antitermite treatment and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. complete at the rate of 7.5 litres (or as directed by the manufacturer) per sqm on vertical and 5.0 litres per sqm on horizontal surfaces, 50% of the emulsion to be filled in center to center etc. complete as per the holes made in trenches at 150m.m IS:6313/1981(Part-II) complete including cost, conveyance, loading, unloading and taxes of all materials, cost of all labour, T&P, sundries and scaffolding where required for the work etc. as directed by the Engineer -in -charge. | 496.66 | Sqm | 104.5 | ₹51,900.97 | BI01010001010000000000000515BI0100001114 |
| 3 | Filling in foundation trenches and plinth with excavated earth well watered and rammed in layers not exceeding 23 c.m in depth including all lead and lift, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer- in- charge. | 232.59 | Cum | 188.6 | ₹43,866.47 | BI01010001010000000000000515BI0100001115 |
| 4 | Supplying & Filling foundation trenches , plinth & ditches with river sand well watered and rammed in layers not exceeding 23 c.m in depth with all lead and lift including cost, conveyance, loading, unloading, stacking,royalties and taxes of all Materials, cost of all Labour,Sundries, T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge. (Measurement will be taken on finished compacted section only.) | 247.24 | Cum | 720.8 | ₹1,78,210.59 | BI01010001010000000000000515BI0100001116 |
| 5 | Providing and Laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors (i.e. below the base course of the flooring) using 40 mm size crusher broken H.G Stone Metal free from weathered skins , cement and screened & washed sharp river sand for mortar of approved quality & from approved quarry including hoisting, lowering and laying concrete to the required level, ramming, watering & curing etc complete to required levels, laid in layers not exceeeding 15cm thick in each layer including cost, conveyance , loading,unloading, stacking ,royalties and taxes of all materials, cost of all labour, Sundries, T&P required for the work including shoring, shuttering and dewatering ( if required) including hire and running charges of the water pump required for the work etc complete in all respect as directed by the Engineer-in-charge. | 95.68 | Cum | 5,976 | ₹5,71,783.68 | BI01010001010000000000000515BI0100001117 |
| 6 | Providing Fly Ash Brick Masonry using bricks of size 25 c.m. x 12 c.m. x 8 c.m. having crushing strength not less than 75 kg per square c.m. in cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in the works in Foundation & Plinth of works with all necessary projections, splays cutting, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | 35.53 | Cum | 5,670.6 | ₹2,01,476.42 | BI01010001010000000000000515BI0100001118 |
| 7 | Providing Fly Ash Brick Masonry using bricks of size 25 c.m. x 12 c.m. x 8 c.m. having crushing strength not less than 75 kg per square c.m. in cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in the works in superstructure and similar such type of works with all necessary projections, splays cutting, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | - | - | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Ground Floor | 128.64 | Cum | 5,703.9 | ₹7,33,749.7 | BI01010001010000000000000515BI0100001120 |
| 9 | First Floor | 126.11 | Cum | 6,089.89 | ₹7,67,995.48 | BI01010001010000000000000515BI0100001121 |
| 10 | Terrace Floor | 34.66 | Cum | 6,533.8 | ₹2,26,461.51 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
dtcnf_merged.pdf
Tender Documents • 33.56 MB
BOQ_596992.xls
BOQ • 1.15 MB
Download all tender documents and submit your bid