| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-AOC | ₹1.1 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹1.1 LRejected-AOC | ₹1.1 L | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Prabhaharan L2 | RAVI K L1 |
|---|---|---|---|---|---|
| 1.00Part.1 Construction of a culvert at parpanacheri Panchayat | |||||
| 2.00 | Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all | 10.5 | Cu.m | 265 ₹2,782.50 | 263 ₹2,761.50 |
| 3.00 | Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation. | 1.4 | Cu.m | 1,977 ₹2,767.80 | 1,976 ₹2,766.40 |
| 4.00 | Providing Concrete for plain/reinforced concrete (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203 | 2.1 | Cu.m | 5,691 ₹11,951.10 | 5,690 ₹11,949 |
| 5.00 | Cement Concrete 1:2:4 mix using 20mm Iss size hard granite broken metal from approved quarry including costand conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section | 3.53 | Cu.m | 7,004 ₹24,724.12 | 7,003 ₹24,720.59 |
| 6.00 | Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete. | 27.82 | Sq.m | 548 ₹15,245.36 | 547 ₹15,217.54 |
| 7.00 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 0.2 | Kg | 92,231 ₹18,446.20 | 92,230 ₹18,446 |
| 8.00 | Reinforced cement Concrete 1:1 1/2:3 mix using 20 mm ISS Size hard granite broken metal from appd. quarry including cost and conveyance of all materials to site for deck slab | 2.13 | Cu.m | 9,450 ₹20,128.50 | 9,448 ₹20,124.24 |
| 9.00 | Provision for Name Board | 1 | No | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 17,468 ₹17,468 | 17,457 ₹17,457 |
Tender Value
₹1.2 L
EMD Value
₹1,160
Closing Date
22 Dec 2025, 3:00 pmClosed
Block Development Officer(B.Pt), Thirumanur
Block Development Office, Thirumanur,Ariyalur District
Construction of a culvert at parpanacheri Panchayat in Thirumanur Block at Ariyalur District under PUGF 25-26
2025_RDTN_632178_1
R.C.No. A2/3267/2025 Dt. 12.12.2025
Open Tender
Civil Works - Roads
Block Development Office, Thirumanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,160
Yes
24 Feb 2026
15 Dec 2025
22 Dec 2025
15 Dec 2025
22 Dec 2025
15 Dec 2025
Amount
Part.1 Construction of a culvert at parpanacheri Panchayat
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Providing Concrete for plain/reinforced concrete (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:2:4 mix using 20mm Iss size hard granite broken metal from approved quarry including costand conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Reinforced cement Concrete 1:1 1/2:3 mix using 20 mm ISS Size hard granite broken metal from appd. quarry including cost and conveyance of all materials to site for deck slab
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Prabhaharan (BID ID -1541910)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.97 MB
TB.pdf
Tender Documents • 0.96 MB
PB.pdf
Tender Documents • 0.62 MB
BOQ_756319.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid