Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.2 LAdmitted-Finance | -0.09% | ₹35.2 L | L1 | Admitted-Finance |
| 2 | L2₹35.2 L+₹1,761.41 (0.05%)Admitted-Finance | -0.04% | ₹35.2 L+₹1,761.41 (0.05%) | L2 | Admitted-Finance |
Tender Value
₹35.1 L
EMD Value
₹70,120
Closing Date
28 May 2026, 12:00 pmClosed
SE RED Gorakhpur Circle
SE RED Gorakhpur Circle, Daudpur, Canal Road, (Durga Mandir Compound), Post-Shivpuri, Gorakhpur
Under District Kushinagar, Construction of Advocates Room in Padrauna Civil Court, Lot No 29
2026_REDUP_1150423_29
13/SE RED Gorakhpur/Kushinagar/26-27 Dt 02/04/2026
Open Tender
Civil Works
Percentage
Kushinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹70,120
SE RED Gorakhpur Circle
16 Jun 2026
19 May 2026
29 May 2026
19 May 2026
28 May 2026
19 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Excavation of Foundation-
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 82.65 | CUM | 181.75 | ₹15,021.64 |
| - | Excavating. Supplying, stacking and filling of local earth (including roylaty) by mechhanical transport upto a lead of 5 km. also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complate for all lift. | 9.47 | CUM | 489.13 | ₹4,632.06 |
| - | Sand Filling-Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 18.94 | CUM | 1,482.91 | ₹28,086.32 |
| - | PCC Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 18.65 | CUM | 4,756.48 | ₹88,708.35 |
| - | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 140 | SQM | 216.5 | ₹30,310 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | - | - | - |
| - | Footing | 16.66 | CUM | 6,316.2 | ₹1,05,227.89 |
| - | Column | 1.81 | CUM | 6,316.2 | ₹11,432.32 |
| - | Plinth | 4.89 | CUM | 6,316.2 | ₹30,886.22 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
Tendernotice_2.pdf
PDF • 3.20 MB
BOQ_2154225.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .